For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 42-561 — Stormwater standards

Municipal Code of the City of Des Moines, Iowa (Supp. No. 38, Update 3: codified through Ordinance No. 16,577, adopted August 24, 2026) · Des Moines Municipal Code § 42-561

Corpus is an independent public-information project, not the official City of Des Moines website. Stable reference: corpuslaw.us/code/920ef3e1-74b2-44bd-b281-c05d5011e2fe

Sec. 42-561. - Stormwater standards.

When applicable as described below, all development and redevelopment sites shall meet the requirements of the Unified Sizing Criteria, as described within the Iowa Stormwater Management Manual (ISWMM) and as noted below, unless stormwater management has been designated for an alternative off-site location or some other exemption or allowance has been prior approved by the city engineer. (a) Small storm criteria: (1) Recharge volume standard: Structural or non-structural practices or techniques shall be employed to minimize the amount of stormwater runoff by capture, infiltration, evapotranspiration or reuse the runoff expected to the greatest extent possible. The target goal of this criteria is to eliminate runoff created by the 1-inch rainfall event. However, the developer may demonstrate, to the satisfaction of city staff, that this standard is not achievable or feasible at a site due to variables such as incompatible soils for infiltration, contaminated sites, high groundwater table, and/or ultra-urban environments. (2) Water quality volume standard: Practices or techniques shall be employed that capture and treat runoff from a 1.25" rainfall event, as further defined within the ISWMM. (3) Channel protection standard: Practices or techniques shall be employed that provide extended detention of the 1-year, 24-hour storm event—with release rates established as per methods defined within the ISWMM manual to provide a minimum drawdown period of 24 hours. If the calculations result in a computed orifice diameter of less than three inches, the final design may instead use a 3-inch orifice as the control for the channel protection (CPv) event. In this case, the final routing modeling of the practice may end up showing that the allowable CPv release rate is exceeded. (b) Large storm criteria: (1) Practices and techniques shall be employed that limit allowable peak release rates that are anticipated to occur post-development during the 5-year through 100-year, 24-hour storm events to levels no greater than the peak rate expected to be caused by the 5-year storm event under existing site conditions. Existing conditions are defined as those that are present at the time that the construction commences. However, any sites that have impervious areas that were constructed without proper permit and/or planning approval from the city will not be allowed to count those areas as impervious area and must instead use natural conditions for those areas to determine the allowable release rate. For purposes of this section, any impervious areas added to a site prior to September 6, 1977 will be deemed as legal regardless of whether proper permits were obtained or not. (2) Natural conditions are defined as meadow in good condition, with times of concentrations calculated and curve numbers selected based on those natural surface conditions and drainage patterns. Curve numbers shall be selected based on the hydrologic soil group for site soils, but the weighted curve number used to determine allowable release rates for the site to be served by the detention practice shall not exceed a curve number of 58 unless demonstrated by a geotechnical report that a higher curve number is warranted, however, in no case shall the curve number exceed 71. (3) Soil group information shall be determined from current county soil maps as available through the NRCS. If a soil group type has not been identified for a given location, the natural condition shall be assumed to be hydrologic soil group B and the post-developed condition shall be assumed to be hydrologic soil group C, unless geotechnical studies are provided for city review that provide evidence for use of another soil group for analysis. (4) Redevelopment sites that have existing stormwater management facilities in place and/or are required to do so as part of an existing approved site plan, subdivision plat, or grading plan, as of January 1, 2025 are required to maintain those practices unless the storage volume and/or treatment practices are incorporated into a new stormwater management facility or facilities. (5) Detention of events larger than the 100-year storm event are not required, however, the design of auxiliary spillways should safely convey flows from the 500-year, 24-hour storm event or per DNR Dam Codes and requirements. (6) Surface water flowage easements shall be provided as needed to reserve a safe and clear path for the width of expected concentrated flows for this type of event. Detention events larger than the 100-year can occur and surface water conveyance for those events should be considered.

(O.16,073, 16,428)

Ask a question about Des Moines law

Corpus searches the Des Moines sections it holds and shows the ones that match, with their citations. Free, no sign-in.