§ 12.08.260 — Installation requirements
Municipal Code of the City of Fort Dodge, Iowa (Codified through Ordinance No. 2411, passed December 8, 2025. (Supp. No. 20)) · Fort Dodge Municipal Code § 12.08.260
Corpus is an independent public-information project, not the official City of Fort Dodge website. Stable reference: corpuslaw.us/code/26697802-79ed-4bbc-95a3-20194acbae92
12.08.260 - Installation requirements.
The city may enforce local standards of installation prior to the adoption of mandatory, preemptive statewide standards pursuant to its inherent and historical police power authority. The following requirements are to be used as general guidelines. If permittee is requesting exception to these guidelines, that exception must be noted and approved by city. 1. Construction signage shall comply with the Manual on Uniform Traffic Control Devices. 2. All tile line locations shall be marked with references located in the ROW line. 3. No underground utility lines shall cross over a crossroad drainage structure. 4. Residents along the utility route shall have uninterrupted access to public roads. All-weather access shall be maintained for residents adjacent to the project. 5. A joint assessment of the road surfacing shall be made by the permittee and the city both before and after construction. After construction, granular surfacing shall be added to an existing granular roadway, drive or parking area by the permittee to restore the surfacing to its original condition. After the surfacing has been applied, the road surface shall be reviewed by the city once the road has been saturated, to determine if additional surfacing on the roadway by the permittee is necessary. 6. All damaged areas within the ROW shall be repaired and restored to at least its former condition by the permittee or the cost of any repair work caused to be performed by the city will be assessed against the permittee. Pavement patching must conform to SUDAS standards. 7. Areas disturbed during construction which present an erosion problem shall be solved by the permittee in a manner approved by the city. 8. All trenches, excavations, and utilities that are knifed shall be properly compacted per SUDAS standards. Any settlement associated the above referenced work within eighteen months of issuance of permit to include pavement settlement, must be repaired. 10. Cable, pipeline, and tile line crossing paved roads shall be constructed as follows: A. Utilities designated by the city which cross under the roadway shall be placed in casings so that the pipe may be removed for repair without disturbing the subgrade; B. The casing shall be adequate strength, and of sufficient length to extend two feet beyond each edge of the surfaced roadway; C. On paved roads, cable casings may be placed through the sub-grade by jacking, or by boring a hole just large enough to take the line; and D. All open excavations near pavement shall be of sufficient distance from pavement to prevent soil collapses resulting in undermining of pavement. 11. On roads not paved, an open trench may, upon approval of the city, be dug and the cable, pipeline, or tile line placed therein, and the trench backfilled over the line. All backfilling of tunnels and trenches shall be thoroughly compacted in layers of six inches or less in-depth. Backfilling of trenches within the ROW shall be tamped sufficiently to avoid settlement. All work shall be done in a workmanlike manner, and the ground left in neat condition, satisfactory to the city. 12. All overhead utilities shall be placed at a distance of two feet inside the ROW line unless specifically approved otherwise by the city. 13. All work shall conform to the minimum SUDAS specifications and criteria set forth herein. 14. Utilities shall include governmentally owned and operated utilities or infrastructure approved for installation in the city ROW pursuant to an agreement between the city and any such governmental entity; any utility operating pursuant to a franchise agreement with the city; and any utility that provides utility service to the residents of the city for compensation. Any utilities occupying the city ROW, including those owned and operated by the city shall comply with the requirements of this chapter, other requirements imposed by federal, state, and local law, including, but not limited, to zoning laws governing the ROW, or adjacent property, as well as any agreements between the city and any such utility. Utility infrastructure installed in the ROW shall not pose an unreasonable safety risk to motorists, pedestrians or the public as determined by the city engineer or designee, in the city's sole discretion. 15. The permittee shall maintain all gutters free and unobstructed for the full depth of the adjacent curb and for at least one foot in width from the face of such curb at the gutterline. Whenever a gutter crosses an intersecting street, an adequate waterway shall be provided and at all times maintained. The permittee shall make provisions to take care of all surplus water, muck, silt, slickings, or other run-off pumped from excavations or resulting from sluicing or other operations and shall be responsible for any damage resulting from its failure to so provided. Backhoe equipment outriggers shall be fitted with rubber pads whenever outriggers are placed on any paved surface. Tracked vehicles are not permitted on paved surfaces unless specific precautions are taken to protect the surface. The permittee will be responsible for any damage to existing pavement caused by operations of such equipment and, upon order of the city engineer, shall repair such surfaces damaged by excavation equipment. 16. The permittee shall at all times and at his or its own expense, preserve and protect from injury and adjoining property and shall be responsible for all damage to public or private property or highways resulting from its failure to properly protect and carry out said work. Whenever it may be necessary for the permittee to trench through any lawn area, said area shall be restored. The permittee shall not remove any trees or shrubs which exist in parking strip areas without first obtaining the consent of the appropriate city department or city official having control of such property. All trench and tunnel excavations and construction shall conform with the safety requirements for shoring, bracing, and ladders in trenches in accordance with current applicable OSHA standards.
(Ord. No. 2315, 9-28-20; Ord. No. 2337, § 140.24, 3-14-22)
Ask a question about Fort Dodge law
Corpus searches the Fort Dodge sections it holds and shows the ones that match, with their citations. Free, no sign-in.