For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.24.255 — Permit application

Municipal Code of the City of Fort Dodge, Iowa (Codified through Ordinance No. 2411, passed December 8, 2025. (Supp. No. 20)) · Fort Dodge Municipal Code § 13.24.255

Corpus is an independent public-information project, not the official City of Fort Dodge website. Stable reference: corpuslaw.us/code/d28536b8-f877-430c-9b1d-23cccd472dad

13.24.255 - Permit application.

All significant industrial users shall complete and file with the city, an application in the form prescribed by the city. Existing significant industrial users shall apply for a wastewater contribution permit within thirty days after the effective date of the ordinance codified in this chapter, and proposed new significant industrial users shall apply at least ninety days prior to connecting to or contributing to the treatment works. In support of the application, the user shall submit, in units and terms appropriate for evaluation, the following information: (1) Name, address, location (if different from the address) and telephone number; (2) SIC number according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended; (3) Wastewater constituents and characteristics including but not limited to those mentioned in Sections 13.24.190 through 13.24.210 as determined by a reliable analytical laboratory; sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to Section 304(g) of the Act and contained in 40 CFR, Part 136, as amended; (4) Time and duration of contribution; (5) Average daily and thirty-minute peak wastewater flow rates, including daily, monthly and seasonal variations, if any; (6) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections and appurtenances by the size, location and elevation; (7) Description of activities, facilities, plant processes and pretreatment facilities on the premises including all materials which are or could be discharged; (8) The nature and concentration of any pollutants in the discharge which are limited by any city, state, or federal pretreatment standards, and a statement defining pretreatment standards and whether or not they are being met on a consistent basis and if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the user to meet applicable pretreatment standards; (9) Each product produced by type, amount, process or processes and rate of production; (10) Type and amount of raw materials processed (average and maximum per day); (11) Number and type of employees, and hours of operation of plant and proposed or actual hours of operation of pretreatment system; (12) A statement, reviewed by an authorized representative of the user and certified by a professional engineer indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance and/or additional pretreatment is required for the user to meet the pretreatment standards. (13) If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. The following conditions shall apply to this schedule: (A) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.). (B) No increment referred to in subdivision (A) of this subsection shall exceed nine months. (C) No later than fourteen days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the director including, as a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the director; (14) Any other information as may be deemed by the city to be necessary to evaluate the permit application. The city will evaluate the data furnished by the user and may require additional information. After evaluation and acceptance of the data furnished, the city may issue or deny a wastewater contribution permit subject to terms and conditions provided herein.

(Ord. No. 2188, § II, 11-12-13)

Ask a question about Fort Dodge law

Corpus searches the Fort Dodge sections it holds and shows the ones that match, with their citations. Free, no sign-in.