§ 9-5-14 — ALTERNATIVE MATERIALS, DESIGN AND METHODS OF CONSTRUCTION AND EQUIPMENT
City Code of Boise City, Idaho (2026 S-32: current through Ord. 38-26, passed 9-29-2026) · Boise City Code § 9-5-14
Corpus is an independent public-information project, not the official City of Boise City website. Stable reference: corpuslaw.us/code/4393d04a-f7cd-4a60-aede-0abec89cc232
9-5-14: ALTERNATIVE MATERIALS, DESIGN AND METHODS OF CONSTRUCTION AND EQUIPMENT:
The provisions of this code are not intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by this code, provided that any such alternative has been approved. An alternative material, design or method of construction shall be approved where the code official finds that the proposed design is satisfactory and complies with the intent of the provisions of this code, and that the material, method of work offered is, for the purpose intended, not less than the equivalent of that prescribed in this code in quality, strength, effectiveness, fire resistance, durability and safety. The details of action granting alternative materials, design and methods of construction or equipment shall be recorded and entered into the files of the electrical section. Where the alternative material, design or method of construction is not approved, the code official shall respond in writing, stating the reasons why the alternative was not approved. (Ord. 43-20, 12-1-2020, eff. 1-1-2021)
Ask a question about Boise City law
Corpus searches the Boise City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
