For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 31-131 — Towers and poles

Code of Ordinances of the City of Lewiston, Idaho (Codified through Ordinance No. 4973, enacted July 27, 2026. (Supp. No. 11)) · Lewiston Code of Ordinances § 31-131

Corpus is an independent public-information project, not the official City of Lewiston website. Stable reference: corpuslaw.us/code/0557a001-b1e9-4e54-9c53-c29047ec06ea

Sec. 31-131. - Towers and poles.

(a) New towers and poles. New towers and poles shall be subject to the general requirements set forth in section 31-128 of this Code. Additionally, new tower and pole locations shall meet all requirements of the Americans with Disabilities Act, as amended, and not interfere with sight distance triangle or approaches. (b) Height restrictions and stealth design. New towers and poles shall be subject to the height restrictions and stealth design requirements set forth below in table 1. If an applicant desires to exceed the maximum height restrictions set forth in table 1, then the applicant shall be required to apply for a waiver pursuant to section 31-133 of this Code. Table 1: Height Restrictions Zone | Maximum Height | Stealth Design Residential Zones | 40 feet | Required [1] Central Business District | 40 feet | Required [1] Normal Hill Heritage Overlay | 40 feet | Required [2] Historic District(s) | 40 feet | Required [2] Commercial Zones | 120 feet [3] | Optional [1] Mixed Use Zones | 90 feet [3] | Optional [1] [1] Stealth design is subject to approval by the public works director and must comply with the general requirements set forth in section 31-128 of this Code. [2] Stealth design is subject to approval by the historic preservation commission and must comply with the general requirements set forth in section 31-128 of this Code. [3] Up to an additional thirty (30) feet in height is allowed if applicant uses stealth design. (c) Preferred macro cell tower locations. The following siting priorities for macro cell towers, ordered from most-preferred (1) to least-preferred (7), are as follows and require an alternative sites analysis, as set forth in subsection (e) of this section: (1) City-owned property and facilities, except those in protected areas, and not including rights-of-way; (2) Commercial zones, except the central business district; (3) Mixed use zones; (4) Rights-of-way in nonresidential zones; (5) City-owned property and facilities in protected areas, but not including rights-of-way; (6) Other parcels of land in protected areas, but not including rights-of-way; (7) Rights-of-way in protected areas. (d) Macro cell towers in protected areas. Macro cell towers in the rights-of-way in protected areas are permitted only upon the issuance of an alternative use permit. (e) Alternative sites for macro cell towers. (1) Analysis. a. For proposed macro cell towers, the applicant must address the city's preferred macro cell tower locations with a detailed explanation justifying why a site of higher priority was not selected. The city's macro cell tower location preferences must be addressed in a clear and complete written alternative sites analysis that shows at least three (3) higher ranked, alternative sites considered that are in the geographic range of the service coverage objectives of the applicant, together with a factually detailed and meaningful comparative analysis between each alternative site and the proposed site that explains the substantive reasons why the applicant rejected each alternative site. b. A complete alternative sites analysis provided under this subsection may include fewer than three (3) alternative sites so long as the applicant provides a factually detailed written rationale for why it could not identify at least three (3) potentially available, higher ranked, alternative sites. c. For purposes of disqualifying potential collocations or alternative sites for the failure to meet the applicant's service coverage or capacity objectives, the applicant shall provide: 1. A description of its objective, whether it be to address a deficiency in coverage or capacity; 2. Detailed maps or other exhibits with clear and concise RF data to illustrate that the objective is not met using the alternative site (whether it be collocation or a more preferred location); and 3. A description of why the alternative site (collocation or a more preferred location) does not meet the objective. d. An applicant must apply for and be granted an alternative use permit in order to locate a macro cell tower at an alternative site. (2) Documentation. The following materials shall be submitted with an alternative sites analysis: a. A copy of the applicant's FCC license or registration. b. A color visual analysis that includes to-scale visual simulations that show unobstructed before- and after-construction daytime and clear-weather views from at least four (4) angles, together with a map that shows the location of each view, including all equipment and ground wires. c. A written analysis that explains how the proposed design complies with the applicable design standards under this article to the maximum extent feasible. A complete design justification must identify all applicable design standards under this article and provide a factually detailed reason why the proposed design either complies or cannot feasibly comply. d. A noise study for the proposed macro cell tower and all associated equipment. e. A scaled site plan clearly indicating the location, type, height, and width of the proposed macro cell tower; on-site improvements; land uses and zoning; adjacent land uses and zoning (including when adjacent to the county); separation distances from a macro cell tower to property lines; adjacent roadways; buildings on adjoining properties; photo simulations; a depiction of all proposed transmission equipment; proposed means of access; setbacks from property lines; elevation drawings or renderings of the proposed macro cell tower; topography, utility runs, or other information deemed by the public works department to be necessary to assess compliance with this article. f. An inventory of the applicant's existing towers and antennas and sites approved for towers or antennas that are either within the jurisdiction of the city or within one (1) mile of the border thereof, including specific information about the location, height, and design of each tower and antenna. The public works department may share such information with other applicants applying for administrative approvals or alternative use permits under this article or other organizations seeking to locate macro cell towers within the jurisdiction of the city; provided, however, that the public works department is not, by sharing such information, in any way representing or warranting that such sites are available or suitable. g. An updated site plan or map showing the separation distance from other macro cell towers and antennas that are described in the inventory of existing sites. The applicant shall also identify the type of construction of the existing macro cell towers and antennas and the owner/operator of the existing macro cell towers and antennas, if known. h. A description of compliance with all applicable federal, state, and local laws. i. A written statement of purpose, which shall minimally include: 1. A description of the objective to be achieved; 2. A to-scale map that identifies the proposed site location and the targeted service area to be benefited by the proposed project; and 3. Full-color signal propagation maps with objective units of signal strength measurement that show the applicant's current service coverage levels from all adjacent sites without the proposed site, predicted service coverage levels from all adjacent sites with the proposed site, and predicted service coverage levels from the proposed site without all adjacent sites. These materials shall be reviewed, signed, and sealed by an Idaho-licensed professional engineer. (f) Separation requirements for macro cell towers. No macro cell tower may be constructed within one-half (½) mile of an existing macro cell tower unless a waiver is obtained pursuant to section 31-133 of this Code or through an alternative use permit pursuant to section 31-132 of this Code waiving or modifying this separation standard, and the applicant can demonstrate that: (1) An existing macro cell tower is not available or feasible for collocation of an additional wireless communication facility; (2) The location of the existing macro cell tower does not satisfy the operational requirements of the applicant; or (3) Another departure from this standard is needed. Factors to be considered in determining whether an applicant has made this demonstration include those listed in section 31-132(g) of this Code.

(Ord. No. 4745, § 1, 9-23-19)

Ask a question about Lewiston law

Corpus searches the Lewiston sections it holds and shows the ones that match, with their citations. Free, no sign-in.