Sec. 37-222. - Towers.

(a) Preferred macro cell tower locations. The following siting priorities, for wireless infrastructure providers, ordered from most-preferred (1) to least-preferred (7), are as follows and require an alternative sites analysis, as set forth in subsection (e) of this section: (1) City-owned property and facilities, except those in protected areas, and not including rights-of-way; (2) Commercial zones, except the central business district; (3) Mixed-use zones; (4) Rights-of-way in nonresidential zones; (5) City-owned property and facilities in protected areas, but not including rights-of-way; (6) Other parcels of land in protected areas, but not including rights-of-way; (7) Rights-of-way in protected areas. (b) Towers in protected areas. Towers in protected areas are permitted only upon the issuance of a conditional use permit, pursuant to the requirements set forth in subsection (h) of this section. (c) Height restrictions and stealth design for towers. Towers shall be subject to the height restrictions and stealth design requirements set forth below in Table 1: Table 1: Tower Height Restrictions Zone | Maximum Tower Height | Stealth Design [1] Residential Zones | 35 feet | Required Central Business District | 45 feet | Required Normal Hill Heritage Overlay | 35 feet | Required Historic District(s) | 45 feet | Required Commercial Zones | 120 feet [2] | Optional Mixed Use Zones | 90 feet [2] | Optional [1] Stealth design is subject to approval by the community development director, the planning and zoning commission, or historic preservation commission, as appropriate, based upon the general requirements in section 37-218 of this Code. [2] An additional thirty (30) feet in height is allowed if applicant uses stealth design. (d) Setback requirements. (1) A tower shall be set back from property lines as required by the zone in which the tower is located or a minimum of one (1) foot for every foot of tower height, whichever produces the greater setback, unless the tower is constructed with breakpoint design technology. If the tower has been constructed using breakpoint design technology, the minimum setback distance shall be equal to one hundred ten (110) percent of the distance from the top of the tower to the breakpoint level of the tower, or the applicable zone's minimum side setback requirements, whichever is greater. For example, on a one hundred-foot tall tower with a breakpoint design at eighty (80) feet, the minimum setback requirement would either be: a. Twenty-two (22) feet (one hundred ten (110) percent of twenty (20) feet, the distance from the top of the tower to the breakpoint); or b. The minimum side setback requirements for that zone, whichever is greater. If an applicant proposes to use breakpoint design technology to reduce the required setback, the issuance of the building permit for the tower shall be conditioned, in part, upon approval of the tower design, including the breakpoint design, by a structural engineer licensed in Idaho. (2) All equipment shelters, cabinets, or other on the ground ancillary equipment shall meet the setback requirement of the zone in which it is located. (e) Alternative sites. (1) Analysis. a. For proposed towers, the applicant must address the city's preferred tower locations with a detailed explanation justifying why a site of higher priority was not selected. The city's tower location preferences must be addressed in a clear and complete written alternative sites analysis that shows at least three (3) higher ranked, alternative sites considered that are in the geographic range of the service coverage objectives of the applicant, together with a factually detailed and meaningful comparative analysis between each alternative site and the proposed site that explains the substantive reasons why the applicant rejected each alternative site. b. A complete alternative sites analysis provided under this subsection may include less than three (3) alternative sites so long as the applicant provides a factually detailed written rationale for why it could not identify at least three (3) potentially available, higher ranked, alternative sites. c. For purposes of disqualifying potential collocations or alternative sites for the failure to meet the applicant's service coverage or capacity objectives, the applicant shall provide: 1. A description of its objective, whether it be to address a deficiency in coverage, capacity, or frequency; 2. Detailed maps or other exhibits with clear and concise RF data to illustrate that the objective is not met using the alternative (whether it be collocation or a more preferred location); and 3. A description of why the alternative (collocation or a more preferred location) does not meet the objective. d. An applicant must apply for and be granted a conditional use permit in order to locate a tower at an alternative site. The notice and procedural provisions of article IX of this chapter ("Conditional Uses") and the factors set forth in subsection (h) of this section shall apply to conditional use permits sought for the purpose of locating a tower at an alternative site. For a siting application that requires a conditional use permit, the governing board shall, within thirty (30) days, hold a public hearing to approve, approve with modification, or deny the application. (2) Documentation. The following materials shall be submitted with an alternative sites analysis: a. A copy of the applicant's FCC license or registration. b. A color visual analysis that includes to-scale visual simulations that show unobstructed before-and-after construction daytime and clear-weather views from at least four (4) angles, together with a map that shows the location of each view, including all equipment and ground wires. c. A written analysis that explains how the proposed design complies with the applicable design standards under this article to the maximum extent feasible. A complete design justification must identify all applicable design standards under this article and provide a factually detailed reason why the proposed design either complies or cannot feasibly comply. d. A noise study for the proposed tower and all associated equipment. e. A scaled site plan clearly indicating the location, type, height, and width of the proposed tower; on-site improvements; land uses and zoning; adjacent land uses and zoning (including when adjacent to the county); separation distances from a tower to property lines; adjacent roadways; buildings on adjoining properties; photo simulations; a depiction of all proposed transmission equipment; proposed means of access; setbacks from property lines; elevation drawings or renderings of the proposed tower; identification and dimensions of property lines and lease lines; and any other structures, topography, parking, utility runs, or other information deemed by the community development department to be necessary to assess compliance with this article. f. Legal description of the entire lot and/or leased site (if applicable) on which the tower is proposed to be located. g. The setback distance between the proposed tower and the nearest residential unit and the nearest residentially zoned property. h. The separation distance from other towers described in the inventory of existing sites submitted pursuant to this article shall be shown on an updated site plan or map. The applicant shall also identify the type of construction of the existing tower(s) and the owner/operator of the existing tower(s), if known. i. A landscape plan showing locations and types of trees and shrubs. j. Location, type, height, and color of fencing and, if applicable, the method of camouflage and illumination. k. A description of compliance with all applicable federal, state, and local laws. l. Identification of cellular sites owned or operated by the applicant in the municipality. m. A written statement of purpose, which shall minimally include: 1. A description of the objective to be achieved; 2. A to-scale map that identifies the proposed site location and the targeted service area to be benefited by the proposed project; and 3. Full-color signal propagation maps with objective units of signal strength measurement that show the applicant's current service coverage levels from all adjacent sites without the proposed site, predicted service coverage levels from all adjacent sites with the proposed site, and predicted service coverage levels from the proposed site without all adjacent sites. These materials shall be reviewed, signed, and sealed by an Idaho-licensed professional engineer. (f) Separation requirements. No macro cell tower may be constructed within one-half (½) mile of an existing macro cell tower unless an exception is obtained pursuant to section 37-223 of this Code or through a conditional use permit waiving or modifying this separation standard pursuant to article IX of this chapter ("conditional uses") and the applicant can demonstrate that: (1) The existing macro cell tower is not available or feasible for collocation of an additional wireless communication facility; (2) The location of the existing macro cell tower does not satisfy the operational requirements of the applicant; or (3) Another departure from this standard is needed. Factors to be considered in determining whether an applicant has made this demonstration include those listed in subsection (h) of this section. (g) Inventory of existing sites. Each applicant, at the time of its application for a macro cell, shall provide to the community development department an inventory of its existing towers, antennas, or sites approved for towers or antennas, that are either within the jurisdiction of the city or within one (1) mile of the border thereof, including specific information about the location, height, and design of each tower or antenna. The community development department may share such information with other applicants applying for administrative approvals or conditional use permits under this article or other organizations seeking to locate macro cells within the jurisdiction of the city; provided, however, that the community development department is not, by sharing such information, in any way representing or warranting that such sites are available or suitable. (h) Conditional use permit for towers. In applying for a conditional use permit for a tower, the notice and procedural provisions of article IX of this chapter ("conditional uses") shall apply except that for a siting application that requires a conditional use permit, the governing board shall, within thirty (30) days, hold a public hearing to approve, approved with modification, or deny the application, pursuant to Idaho Code Section 67-6540(a). Additionally, an applicant shall notify the Lewiston-Nez Perce County Regional Airport if a tower is proposed to be located within a three-mile radius of the center of the Lewiston-Nez Perce County Regional Airport. Further, the applicant shall address and the planning and zoning commission shall consider the following factors in determining whether to issue a conditional use permit for a tower, in lieu of the factors set forth in article IX of this chapter. The planning and zoning commission may waive or reduce the burden on the applicant of one (1) or more of these factors if the commission concludes that the purposes of this article are, nevertheless, served thereby. (1) Whether the proposed tower meets the other applicable provisions of this article. (2) Surrounding topography, trees, buildings and antennas that would impair RF signals. (3) Proximity of the tower to residential structures and residential zone boundaries and whether the tower impairs the view shed. (4) Proximity of the tower to structures in historic district(s) or in the Normal Hill heritage overlay zone so as to impair visual aesthetics. (5) Nature of uses on adjacent and nearby properties and compatibility with those uses. (6) Design of the tower, with particular reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness. (7) Whether existing structures or towers are available in accordance with this section and located within the geographic area that meets the applicant's service coverage and structural requirements. (8) Whether existing towers or structures have sufficient structural strength to support applicant's proposed antenna and related equipment. (9) Whether the applicant demonstrates that there are other limiting factors not enumerated herein that render existing towers and structures unsuitable. (10) Whether the telecommunications facility will be within the RF emission limits allowed by the FCC. The applicant shall provide documentation from an expert regarding this requirement. The FCC shall determine whether the applicant's proposed antenna would cause electromagnetic interference with antennas on existing towers or structures, or whether antennas on existing towers or structures would cause interference with the applicant's proposed antenna. (11) Whether the tower will comply with FAA requirements, rules, regulations, and orders.

(Ord. No. 4742, § 1, 8-19-19; Ord. No. 4790, § 5, 11-23-20; Ord. No. 4961, § 7, 4-13-26)