§ 10-6-5 — Provisions for flood hazard reduction
Code of Ordinances of the City of Meridian, Idaho (Supp. No. 14: codified through Ordinance No. 26-2129, enacted July 7, 2026) · Meridian Code of Ordinances § 10-6-5
Corpus is an independent public-information project, not the official City of Meridian website. Stable reference: corpuslaw.us/code/ebd7c1ff-1b41-417b-a0b3-c9d9728a5b21
10-6-5. - Provisions for flood hazard reduction.
A. Standards for the Meridian Floodplain Overlay District. 1. Engineering and mapping requirements. a. Determination of base flood elevations (BFEs). The floodplain development permit applicant may contact the City Floodplain Administrator to determine the base flood elevation. If the Floodplain Administrator is unable to determine the base flood elevation through FIS profiles and/or simplified methods, then the floodplain development permit applicant shall retain the services of a qualified State of Idaho Licensed Professional Engineer, or professional land surveyor to determine BFEs before and after the proposed development. BFEs shall be determined based on FIRMs, previous studies, by performing a hydraulic analysis, or other methods approved by the Floodplain Administrator. The applicant must check with the Floodplain Administrator to determine if additional updated information on BFEs is available. b. Effect of development on BFE. In areas where a floodway has not been determined, the cumulative effect of any proposed development, when combined with all other existing and anticipated development, shall not increase the water surface elevation of the base flood more than one (1) foot at any point unless letter of map change (LOMC) provisions in 44 CFR Part 65 are met. It is the responsibility of the city acting through the Floodplain Administrator to allocate the one (1) foot increase to best serve the purposes and objectives of this chapter. c. Floodway mapping. In floodplains where the floodway is not shown on the FIRM, the floodplain development permit applicant shall retain the services of a qualified State of Idaho Licensed Professional Engineer to determine the location of a local floodway. Development in the Meridian Floodway Overlay District shall then meet the standards for development specified in subsection 10-6-5.B. below. 2. Construction requirements for new construction and substantial improvements of structures. a. Elevation requirements. (1) For all residential construction and new nonresidential construction the lowest floor elevation of any structure, including basements, or mobile/manufactured homes, shall be elevated to the flood protection elevation of no less than two (2) feet above the base flood elevation. (2) For all residential construction and new nonresidential construction, any crawlspace or other unfinished or flood-resistant enclosure below the lowest floor that is usable solely for parking of vehicles, building access or storage in an area other than a basement, shall be elevated to a minimum of one (1) foot above the base flood elevation. (3) All manufactured homes shall be elevated on a permanent foundation and meet the same elevation requirements as other structures. (4) Lots for new construction, removed from a defined special flood hazard area as shown on the effective FIRM through a letter of map change based on fill (LOMR-F), but within the Meridian Floodplain Overlay District, may elevate the lowest floor to a flood protection elevation of one (1) foot above the base flood elevation provided the post development base flood water surface elevation increase is less than one (1) foot as determined by approved engineering hydraulic analysis and flooding source peak discharges do not exceed one thousand five hundred (1,500) cfs per FIS data tables. Lots where post development base flood water surface elevation increase is one (1) foot or greater, or flooding source peak discharges exceed one thousand five hundred (1,500) cfs shall comply with the elevation requirements of subsections A.2.a.(1) and A.2.a.(2) of this section. b. Floodproofing requirements. (1) For existing non-residential construction, including development which is considered a substantial improvement, the lowest floor area of any structure, including basements, and any unfinished enclosure area shall either be elevated to conform with subsections 10-6-5.A.2.a.(1) and (2) above or be dry floodproofed, together with attendant utility and sanitary facilities, below the flood protection elevation as defined in section 10-6-2, so that the structure is water tight with walls substantially impermeable to the passage of water; have structural components capable of resisting hydrostatic and hydrodynamic loads and effects of buoyancy; and be certified by a qualified State of Idaho Licensed Professional Engineer that the standards above have been satisfied. c. Anchoring. (1) All construction shall be designed and adequately anchored to resist flotation, collapse, and lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. (2) All manufactured homes must likewise be anchored to prevent flotation, collapse or lateral movement, and shall be installed using methods and practices that minimize flood damage. Anchoring methods may include, but are not limited to, use of over the top or frame ties to ground anchors (reference FEMA guidebooks for additional techniques). d. Construction materials and methods. (1) All construction below BFE shall be done with materials resistant to flood damage. This includes not only the foundation walls of the crawl space used to elevate the building, but also all joints, insulation or other materials that extend below the BFE. (2) All construction shall use methods and practices that minimize flood damage. (3) All building utility systems, including electrical, heating, ventilation, plumbing, air conditioning, ductwork and other service facilities shall be elevated at least one (1) foot above the BFE. 3. Utilities and drainage. a. All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system. b. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharge from the systems into floodwaters. c. On site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. 4. Land development applications. a. All land development shall be consistent with the need to minimize flood damage. b. All land development shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage. c. All land development shall have adequate drainage provided to reduce exposure to flood damage. d. Include base flood elevation data for all proposals greater than fifty (50) lots or five (5) acres, whichever is the lesser. 5. Storage of materials and equipment. Storage of the following materials is prohibited within the Meridian floodplain overlay district: a. The following materials, regardless of how they are stored: Acetone | Carbon Disulfide | Prussic Acid | Phosphorus Ammonia | Celluloid | Magnesium | Potassium Benzene | Chlorine | Nitric Acid | Sodium Calcium Carbide | Hydrochloric Acid | Oxides of Nitrogen | Sulfur b. All other materials that are buoyant, flammable, noxious, toxic or otherwise injurious to persons or property if transported by floodwaters, except those identified in item a. above, are prohibited unless elevated to the flood protection elevation and using a storage method designed to resist flood related forces including hydrostatic, hydrodynamic, buoyancy and debris impact forces. 6. Recreation vehicles. a. Recreational vehicles located in the Meridian Floodplain Overlay District must either: (1) Be onsite for fewer than one hundred eighty (180) consecutive days; (2) Be fully licensed and ready for highway use, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and have no permanently attached structures or additions, or; (3) Meet all the requirements for new construction and substantial improvements of structures as specified in subsection 10-6-5.A.2. B. Standards for the Meridian Floodway Overlay District. 1. Development is prohibited in a mapped floodway as shown on the effective FIRM unless the provisions of 44 CFR 60.3(d) are met; and a "no-rise" certification is provided by a qualified state of Idaho licensed professional engineer and accompanied by hydrologic and hydraulic analysis performed in accordance with standard engineering practice, including. but not limited to. supporting engineering data and that information which is required under section 10-6-4.A.1. supporting the determination that the floodway development will not cause any increase to BFEs at any point or a conditional letter of map revision (CLOMR) has been approved by FEMA. If a CLOMR has been approved a letter of map revision (LOMR) must also be obtained within six (6) months of completion of the proposed encroachment. 2. In areas where a floodway has not yet been mapped on the FIRM, the floodplain development permit applicant shall retain the services of a qualified licensed professional engineer to determine the location of a local floodway for purposes of this chapter. Once determined, development within the locally mapped floodway will not be allowed unless a "no-rise" standard is met as stated in item 1. above. a. Existing local and state highway bridges and culverts that are extended or improved using public funds may be exempt from the "no-rise" standard if they are not in a mapped floodway as shown on the FIRM.
(Ord. 20-1879, 5-12-2020)
Ask a question about Meridian law
Corpus searches the Meridian sections it holds and shows the ones that match, with their citations. Free, no sign-in.
