For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11-1-5 — Interpretation

Code of Ordinances of the City of Meridian, Idaho (Supp. No. 14: codified through Ordinance No. 26-2129, enacted July 7, 2026) · Meridian Unified Development Code § 11-1-5

Corpus is an independent public-information project, not the official City of Meridian website. Stable reference: corpuslaw.us/code/32c8a09f-b806-477c-8f5d-7010222189e3

11-1-5. - Interpretation.

A. Language. 1. Terminology. When used in this title, all words used in the present tense shall include the future; words used in the singular number shall include the plural number and the plural the singular, unless the natural construction of the sentence indicates otherwise. The word "shall" is mandatory, and the word "may" is permissive. 2. Number of days. Whenever a number of days is specified in this title, or in any permit, condition of approval, or notice issued or given as provided in this title, the number of days shall be construed as calendar days, except that such time limits shall extend to the following working day when the last of the specified number of days falls on a weekend or Meridian City holiday. 3. Minimum requirements. When interpreting and applying the regulations of this title, all regulations shall be considered to be minimum requirements, unless stated otherwise. Proposed uses shall comply with all applicable regulations and standards unless specifically exempt elsewhere in this title. 4. Defined terms. Terms defined in section 11-1A-1 of this chapter shall have their defined meaning when used elsewhere in this title. For the purpose of readability and clarity, such terms are not shown in initial caps. 5. Section headings. Section headings or captions are for reference purposes only and shall not be used in the interpretation of this title. 6. References. All references to state or federal laws and/or regulations shall refer to such laws and/or regulations as they may be amended over time. B. Measurements. 1. The height of a residential structure shall be measured from the average grade at the front property line to the highest point of the roof or structure. Nonresidential and mixed-use structure height shall be measured in accord with the Meridian City Building Code as set forth in title 10, chapter 1 of this Code. 2. Linear distance shall be measured in a horizontal line; it shall not be measured along an inclined surface or line. For uses that have a separation standard, the distance shall be measured from the nearest customer entrance of the proposed use to the nearest property line of the specified use. The measurement is to be conducted in a radial fashion by the specified number of feet (e.g., three hundred (300) feet, one thousand (1,000) feet). 3. The area of the sign background shall be computed by measuring the area enclosed by straight lines drawn to enclose the extremities of the copy. When computing the area of sign background, only the face or faces that may be seen from one direction at one time shall be considered. If a sign consists of individual letters, only the total area enclosed by straight lines drawn to enclose each letter shall be computed as sign background area. 4. The height of a sign shall be computed by measuring the distance measured vertically from the top of curb of the abutting street (or, where no curb exists, from the edge of pavement) to the highest point of the sign or visual appurtenance(s). The height of any landscape berm or other structure erected to support or ornament the sign shall be measured as part of the sign height. This allowance does not apply to streets that are part of a freeway interchange or overpass. 5. For residential subdivision identification signs, sign height applies only to that portion of a structure which is physically supporting the sign background area. Other architectural elements primarily related to an entry feature that may be associated with the subdivision identification sign are not regulated as part of the sign height. 6. The projection of a sign is measured by the distance by which a sign extends beyond the building line. 7. The required landscaped area for freestanding signs shall be computed by measuring the inside of the landscaped area, excluding any part of the support structure. 8. A fence shall be measured from the lowest grade at the base of the fence unless otherwise stated in section 11-3A-7. C. District boundaries. Where uncertainty exists about the location of any district boundary shown on the official zoning map, the following rules shall be used to resolve the uncertainty. 1. Where a district boundary approximately follows a property line, such property line shall be construed as the district boundary. 2. Where a district boundary approximately follows a street, alley, or railroad line, such street, alley, centerline, or the extension of such line shall be construed as the district boundary. 3. Where a district boundary approximately follows a watercourse, the centerline of the watercourse shall be construed to be such boundary. In the event of a change in the watercourse shoreline, the boundary shall be construed as moving with the actual shoreline. 4. Where a district boundary does not obviously coincide with any of the above lines (property; street, alley, or railroad line; watercourse), or where it is not designated by dimensions, it shall be deemed to be located along the nearest section, quarter section, or sixteenth section line. D. Conflicting regulations. 1. In case of conflict between the text and the maps of this title, the maps shall prevail. 2. If conflicts occur between different regulations of this title, or between this title and other regulations of this Code, the most restrictive regulation shall apply. 3. It is not intended that this title interfere with, abrogate, or annul any easements, covenants, or other agreements between parties; however, where this title imposes a greater restriction upon the use of structures or premises or upon the height of structures, or requires larger space than is imposed or required by ordinances, rules or regulations, or by easements, covenants, or agreements, the regulations of this title shall govern. E. Allowed uses. If a proposed use of property is not specifically listed in chapter 2, "district regulations", of this title, the use shall be prohibited, except as follows: The director may determine that a proposed use not listed in chapter 2, "district regulations", of this title, is equivalent to a principal permitted or conditional use. In making the determination, the Director shall consider the following: 1. The impacts on public services and activities associated with the proposed use are substantially similar to those of one (1) or more of the uses listed in the applicable base districts as allowed; 2. The proposed use shall not involve a higher level of activity or density than one (1) or more of the uses listed in the applicable base districts as allowed; 3. The proposed use is within the same three (3) digit category of an allowed use listed in the latest edition of the "North American Industrial Classification System (NAIC)", published by the United States Department of Commerce; 4. The proposed use is consistent with the purpose of the district in which the use is proposed to be located; and 5. The proposed use is in substantial conformance with goals and objectives of the comprehensive plan.

(Ord. 05-1170, 8-30-2005, eff. 9-15-2005) (Ord. 13-1546, 3-5-2013; Ord. No. 25-2099, § 1, 9-23-2025; Ord. No. 26-2119, § 1, 3-17-2026)

Ask a question about Meridian law

Corpus searches the Meridian sections it holds and shows the ones that match, with their citations. Free, no sign-in.