For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11-3B-6 — Irrigation standards

Code of Ordinances of the City of Meridian, Idaho (Supp. No. 14: codified through Ordinance No. 26-2129, enacted July 7, 2026) · Meridian Unified Development Code, art. B, § 11-3B-6

Corpus is an independent public-information project, not the official City of Meridian website. Stable reference: corpuslaw.us/code/70c3caf5-597d-43c8-9e9e-0a4678103786

11-3B-6. - Irrigation standards.

A. Irrigation required. All landscape areas regulated by this article shall be served with an automatic underground irrigation system. Additional requirements affecting pressurized irrigation systems can be found in Section 9-1-28, "Pressurized Irrigation System", of this Code. B. Performance specifications. 1. Coverage. The irrigation system shall be designed to provide one hundred (100) percent coverage within lawn areas with head-to-head spacing or triangular spacing as appropriate or point to point (drip) at each plant or planting area. 2. Matched precipitation rates. Sprinkler heads shall have matched precipitation rates within each control valve circuit. 3. Irrigation hydrozones. Sprinkler heads irrigating lawn or other high water demand areas shall be circuited so that they are on a separate hydrozone from those irrigating trees, shrubs, or other reduced water demand areas. 4. Overspray. Sprinkler heads shall be installed and adjusted to reduce overspray onto impervious surfaces such as streets, sidewalks, driveways, and parking areas. C. Backflow prevention. Provide an appropriate backflow prevention device as required by Title 9, Chapter 3, "Cross Connection Control", of this Code. D. Nonpotable water. Use of nonpotable irrigation and/or reuse water is required when determined to be available by the city public works department as set forth in Section 9-1-28, "Pressurized Irrigation System", of this code; reuse water may not be used for stormwater facilities. Water availability during the fall and spring seasons is also required by connecting to city potable water, city reuse water, and/or an on-site well as a secondary source. An exception may be approved for water conserving designs as set forth in subsection 11-3B-5O of this article. In such cases, the requirement for a secondary source may be waived by the director. If city potable water is used, a separate water meter is required. E. Subdivision irrigation systems. If a pressurized irrigation pump station is required on the developed property, such station shall be on a lot solely dedicated to that pump station. Said lot shall be owned by the entity that owns and maintains the pressurized irrigation system.

(Ord. No. 21-1950, § 17, 10-10-2021)

Ask a question about Meridian law

Corpus searches the Meridian sections it holds and shows the ones that match, with their citations. Free, no sign-in.