For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11-6B-3 — Final plat process

Code of Ordinances of the City of Meridian, Idaho (Supp. No. 14: codified through Ordinance No. 26-2129, enacted July 7, 2026) · Meridian Unified Development Code, art. B, § 11-6B-3

Corpus is an independent public-information project, not the official City of Meridian website. Stable reference: corpuslaw.us/code/10f522a9-dc3a-4ffa-97c7-1e1a704cc48c

11-6B-3. - Final plat process.

A. Application requirements. After the approval or conditional approval of the preliminary plat, the applicant may cause the total parcel, or any part thereof, to be surveyed and a final plat prepared in accord with the approved preliminary plat. An application and fees, in accord with chapter 5, "administration", of this title, shall be submitted to the director on forms provided by the Planning Department. B. Contents of final plat. The final plat shall include and be in compliance with all items required under Idaho Code § 50-1301 et seq. The final plat submittal shall include at least: 1. A written application for approval of such final plat as stipulated by the commission; 2. Proof of current ownership of the real property included in the proposed final plat and consent of recorded owners of the plat; 3. Such other information as the director or city engineer may deem necessary to establish whether or not all proper parties have signed and/or approved said final plat; 4. A statement of conformance with the approved preliminary plat and meeting all requirements or conditions thereof; 5. A statement of conformance with all requirements and provisions of this title; and 6. A statement of conformance with acceptable engineering, architectural and surveying practices and local standards. C. Director review. 1. Acceptance. Upon receipt of the final plat, and compliance with all other requirements as provided for herein, the director shall certify the application as complete and shall affix the date of acceptance. 2. Substantial compliance. a. The director or designee shall review the final plat for substantial compliance with the approved or conditionally approved preliminary plat. The final plat shall be determined in substantial compliance with the preliminary plat, notwithstanding the following changes: (1) The number of buildable lots is the same or fewer; (2) The amount of common open space is increased; (3) The amount of open space is relocated with no reduction in the total amount; (4) The number of open space lots has been increased; or (5) The transportation authority has required minor changes. b. If the number of buildable lots has increased or there has been an overall reduction in the amount of open space, the final plat shall be determined not to be in substantial compliance with the preliminary plat. If the director determines that there is substantial difference in the final plat than that which was approved as a preliminary plat or conditions that have not been met, the Director may require that a new preliminary plat be submitted to the Commission. D. Decision. Decision on the final plat is made by the City Council in accord with chapter 5, "administration", of this title. Each final plat approval shall indicate the timing of the construction and completion for all improvements and any required amenities associated with the plat. E. Recording of the final plat. Upon approval or approval with conditions by the council and signature of the city engineer, the applicant may submit the final plat to the Ada County recorder for recording. The final plat shall contain the certifications required under Idaho Code § 50-1301 et seq., as well as those required by the City of Meridian.

(Ord. 05-1170, 8-30-2005, eff. 9-15-2005)

Ask a question about Meridian law

Corpus searches the Meridian sections it holds and shows the ones that match, with their citations. Free, no sign-in.