9-1-11. - Water main extensions.
A. Permit required. No extensions of service pipes shall be made without first obtaining a permit therefor from the public works department, and each building shall have separate service pipes. B. Compliance with city policies; responsibility for costs. All proposed extensions of the municipal water system to serve undeveloped areas within the existing corporate limits, newly annexed areas or areas outside the corporate limits shall comply with existing water system extension policies and with the overall master plan for the city's municipal water supply system. Costs for all extensions to any property shall be the responsibility of that property owner or his agent. Cost for water service extensions within the property for which the extension is requested shall also be the responsibility of the owner or his agent. When it is necessary to install oversized mains as part of an extension, the cost of all oversized lines may be the responsibility of the owner or his agent. Such water line extensions, public or private, shall be extended to the farthest boundary of the development project or property to be served by the extension. C. Fire hydrants and service lines. It shall also be the property owner's or his agent's responsibility to install all necessary fire hydrants and city water service lines for all extensions of the municipal water system at no expense to the city. Unless a special permit is granted by the city, all municipal water system extensions, including the city water service lines, to newly developing areas shall be installed prior to the construction of any new streets. D. Approval of plans. All design and construction of any extensions to the municipal water system shall comply with the official specifications as adopted by the city for the water distribution system. The plans for all extensions to the municipal water system shall be prepared and signed by a registered professional engineer as per the licensing requirements of the Idaho Code and said plans shall be filed with the city. In approving a plan for extension to the municipal water system, the city reserves the right to stipulate other requirements such as a special permit fee, rights-of-way limits, sequence of construction, time limits for having existing service disrupted, the provision of surety guaranteeing completion and other similar measures as may be required to protect the public. No work shall commence on any such extension of the municipal water system until the extension project has been approved by the city and the State of Idaho Department of Environmental Quality. E. Certification by Engineer. After the construction of the municipal water system extensions, it shall be the obligation of the owner, or his agent, to have a registered professional engineer verify to the city that the said system extensions were installed in accordance with the approved plans and specifications on file in the office of the City Engineer. Following certification by the registered professional engineer and acceptance by the city, the entire extension of the municipal water system, including the city water service lines, shall become the property of the city and it shall be the city's responsibility to maintain and operate the system thereafter. F. Work done by contractor. The installation of all public water systems shall be performed and completed by a contractor possessing a valid State of Idaho Public Works License with the proper endorsement for the work.
(Ord. 04-1106, 10-5-2004)
Ask a question about Meridian law
Corpus searches the Meridian sections it holds and shows the ones that match, with their citations. Free, no sign-in.