For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-9-5 — Provisions for flood hazard reduction

Code of Ordinances of the City of Nampa, Idaho (Codified through Ordinance No. 4907, adopted January 5, 2026 (Supp. No. 16, Update 1)) · Nampa Code of Ordinances § 4-9-5

Corpus is an independent public-information project, not the official City of Nampa website. Stable reference: corpuslaw.us/code/7926e086-ed00-4aa5-8db1-4a6a19c08c82

4-9-5. - Provisions for flood hazard reduction.

A. General standards. In all areas of special flood hazards, the following standards are required: 1. Anchoring. a. All new construction and substantial improvements, including accessory structures and storage tanks, shall be anchored to prevent flotation, collapse or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. b. All manufactured homes must likewise be anchored to prevent flotation, collapse or lateral movement and shall be installed using methods and practices that minimize flood damage. Anchoring methods may include, but are not limited to, use of over the top frame ties to ground anchors. 2. AH and AO zone drainage. Adequate drainage paths are required around structures on slopes to guide floodwaters around and away from proposed structures. 3. Construction materials and methods. a. All new construction and substantial improvements of an existing structure, including a structure that has been substantially damaged, shall be constructed with materials and utility equipment resistant to flood damage. b. All new construction and substantial improvements of an existing structure, including a structure that has been substantially damaged, shall be constructed using methods and practices that minimize flood damage. c. Electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities shall be designed and/or otherwise elevated or located so as to prevent water from entering or accumulating within the components during flooding. 4. Utilities. a. All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems; b. Water wells shall be located on high ground that is not in the floodway; c. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters; d. On site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. 5. Subdivision proposals and manufactured home parks. a. All development proposals, including subdivisions and manufactured home parks, shall be consistent with the need to minimize flood damage and shall be reasonably safe from flooding; b. All development proposals, including subdivisions and manufactured home parks, shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize or eliminate flood damage; c. All development proposals, including subdivisions and manufactured home parks, shall have adequate drainage provided to reduce exposure to flood damage; d. Base flood elevation data shall be generated and/or provided for subdivision proposals and all other proposed development, including manufactured home parks and subdivisions, greater than 50 lots or five acres whichever is less. 6. Review of building permits. Where elevation data is not available either through the flood insurance study (FIS), or from another authoritative source (subsection 4-9-4.C.2 of this chapter), applications for building permits shall be reviewed to assure that proposed construction will be reasonably safe from flooding. The test of reasonableness is a local judgment and includes use of historical data, high water marks, photographs of past flooding, etc., where available. Failure to elevate at least two feet above grade in these zones may result in higher insurance rates. B. Specific standards. In all areas of special flood hazards where base flood elevation data has been provided as set forth in subsection 4-9-3.B, "Basis for establishing areas of special flood hazard", or 4-9-4.C.2, "Use of other base flood data (in A zones)", of this chapter. Additional standards have been clarified in FEMA technical bulletin 11-01 to allow crawl space construction for buildings located in the special flood hazard areas. The following provisions are required: 1. Residential construction. a. New construction and substantial improvement of any residential structure shall have the lowest floor, including basement, elevated to the flood protection elevation (FPE). b. Fully enclosed areas below the lowest floor that are usable solely for parking, access or storage and that are subject to flooding are prohibited, or shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or must meet or exceed the following minimum criteria: (1) A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. (2) The bottom of all openings shall be no higher than one foot above the higher of the exterior or interior grade or floor immediately below the opening. (3) Openings may be equipped with screens, louvers, or other coverings or devices provided that they permit the automatic entry and exit of floodwaters without manual intervention. (4) For crawl space foundation types, construction must follow the guidelines in FEMA TB 11-01, crawl space construction for structures located in special flood hazard areas: national flood insurance program interim guidance, specifically: (A) Below grade, crawl spaces are prohibited at sites where the velocity of floodwaters exceeds five feet per second. (B) All building utility systems within the crawl space shall be elevated above the base flood elevation or be designed so that floodwaters cannot enter or accumulate within the system component during flooding. (C) The interior of a crawl space below the base flood elevation must not be more than two feet below the lowest adjacent exterior grade (LAG) and the height of the below grade crawl space, measured from the interior grade of the crawl space to the bottom of the floor joist must not exceed four feet at any point. (D) Must have adequate flood openings installed as described in subsection 4-9-5.B.1.b. (E) Below-grade crawl-spaces constructed in accordance with the requirements listed in this subsection shall not be considered basements. However, applicant s who construct buildings that have below grade crawl spaces are hereby advised that such buildings will have higher flood insurance premium s than buildings that have crawl-spaces with interior elevations at or above the lowest adjacent grade. (F) An adequate drainage system shall be provided that removes floodwaters from the interior area of the below- grade crawl-space. (5) Enclosed areas below BFE may be used solely for vehicle parking, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area. c. Accessory structures shall have the lowest floor including basement, elevated one foot or more above the base flood elevation (BFE) or be constructed to nonresidential standards. 2. Nonresidential construction. New construction and substantial improvement of any commercial, industrial or other nonresidential structure shall either have the lowest floor, including basement, elevated to the flood protection elevation (FPE); or, together with attendant utility and sanitary facilities, shall: a. Be floodproofed so that below the flood protection elevation (FPE) the structure is watertight with walls substantially impermeable to the passage of water. b. Have structural components capable of resisting hydrostatic and hydrodynamic loads and effects of buoyancy. c. Be certified by a registered professional engineer or architect that the design and methods of construction are in accordance with accepted standards of practice for meeting provisions of this subsection based on their development and/or review of the structural design, specifications and plans. Such certifications shall be provided to the official as set forth in subsection 4-9-4.C.3.b of this chapter. d. Nonresidential structures that are elevated, not floodproofed, must meet the same standards for space below the lowest floor as described in subsection B.1 of this section. e. Applicants floodproofing nonresidential buildings shall be notified that flood insurance premiums will be based on rates that are one foot below the floodproofed level (e.g., a building constructed to the base flood level will be rated as one foot below that level). 3. Manufactured homes. All manufactured homes in the area of special flood hazard to be placed or substantially improved shall be elevated on a permanent foundation or piers such that the lowest floor of the manufactured home is elevated to the flood protection elevation and be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement. a. Manufactured homes placed on solid perimeter walls shall meet the flood vent requirements in subsection B.1 of this section. 4. Recreational vehicles. Recreational vehicles placed on sites are required to either: a) be on the site for fewer than 180 consecutive days; or b) be fully licensed and ready for highway use, on wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and have no permanently attached additions; or c) meet the requirements of subsection B.3 of this section and the elevation and anchoring requirements for manufactured homes. 5. Minimum health and safety standards. Any alteration, repair, reconstruction or improvement to a structure that is not compliant with the provisions of this chapter, shall be undertaken only if the nonconformity is minimal in order to meet health and safety standards. C. AE Zones with base flood elevations but no floodways. In areas with base flood elevations (but a regulatory floodway has not been designated), no new construction, substantial improvements, or other development (including fill) shall be permitted within AE zones on the community's FIRM, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community. D. Floodways. Located within areas of special flood hazard established in subsection 4-9-3.B of this chapter are areas designated as floodways. Since the floodway is an extremely hazardous area due to the velocity of floodwaters which carry debris, potential projectiles and erosion potential, the following provisions apply: 1. Prohibit encroachments, including fill, new construction, substantial improvements and other development unless it has been demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the proposed encroachment shall not result in any increase in flood levels during the occurrence of the base flood discharge. 2. If subsection D.1 of this section is satisfied, all new construction and substantial improvements shall comply with all applicable flood hazard reduction provisions of this section. 3. The administrator may make determinations to allow minor projects, such as projects that do not increase the natural grade (e.g., paving a driveway or parking lot at existing grade, open fences and small isolated obstructions such as a mailbox or telephone pole). E. Critical facility. Construction of new critical facilities shall be, to the extent possible, located outside the limits of the special flood hazard area (SFHA) (100-year floodplain). Construction of new critical facilities shall be permissible within the SFHA if no feasible alternative site is available. Critical facilities constructed within the SFHA shall have the lowest floor elevated three feet above BFE or to the height of the 500-year flood, whichever is higher. Access to and from the critical facility should also be protected to the height utilized above. Floodproofing and sealing measures must be taken to ensure that toxic substances will not be displaced by or released into floodwaters. Access routes elevated to or above the level of the base flood elevation shall be provided to all critical facilities to the extent possible. F. Alteration of a watercourse. A watercourse is considered altered when any change occurs within its banks. Prior to the issuance of a floodplain development permit for alteration of a watercourse the applicant must: 1. Submit a description of the extent to which any watercourse will be altered or relocated as a result of the proposed development and submit certification by a registered professional engineer that the bankfull flood carrying capacity of the watercourse will not be diminished. 2. Notify adjacent communities, the U.S. army corps of engineers and the Idaho Department of Water Resources Stream Channel Alteration Program. Evidence of notification must be submitted to the floodplain administrator and to the federal emergency management agency. 3. Meet the requirements to submit technical data in subsection G of this section when an alteration of a watercourse results in the relocation or elimination of the special flood hazard area, including the placement of culverts. G. Requirement to submit new technical data. 1. For all development proposals that impact floodway delineations or base flood elevations, the community shall ensure that technical data reflecting such changes be submitted to FEMA within six months of the date such information becomes available. These development proposals include: a. Floodway encroachments that increase or decrease base flood elevations or alter floodway boundaries. b. Fill sites to be used for the placement of proposed structures where the applicant desires to remove the site from the special flood hazard area. c. Alteration of watercourses that result in a relocation or elimination of the special flood hazard area, including the placement of culverts. d. Subdivisions or large scale development proposals requiring establishment of base flood elevations according to subsection A.5.d of this section. 2. It is the responsibility for the applicant to have technical data prepared in a format required for a conditional letter of map revision or letter of map revision and submitted to FEMA. Submittal and processing fees for these map revisions shall be the responsibility of the applicant.

(Ord. 3964, 4-18-2011; Ord. No. 4618, § 5, 10-18-2021)

Ask a question about Nampa law

Corpus searches the Nampa sections it holds and shows the ones that match, with their citations. Free, no sign-in.