§ 12.12.070 — Construction detail
Code of Ordinances of the City of Post Falls, Idaho (Codified through Ordinance No. 1549, enacted February 17, 2026. (Supp. No. 5)) · Post Falls Code of Ordinances § 12.12.070
Corpus is an independent public-information project, not the official City of Post Falls website. Stable reference: corpuslaw.us/code/67b32f74-7374-4beb-94eb-4751232afd5a
12.12.070. - Construction detail.
A. All Driveway Approaches and Sidewalk Sections, where constructed of Portland cement concrete shall be five (5) inches thick for residential Driveways and six (6) inches thick for commercial Driveways. Steel reinforcement may be required. B. The Sidewalk Section of the Driveway Approach shall be finished and scored as specified by the city works superintendent for typical sidewalk construction. Apron and end slope areas of the Driveway Approach shall be finished after trowelling smooth and scoring, with a fiber push broom drawn over the surface parallel to the curbline. C. Driveway approaches shall be constructed in accordance with the standard plans for Driveway Approaches as filed with the city clerk, a copy of which shall be furnished applicant at the time the application is filed.
(Prior code § 9-10-7)
Ask a question about Post Falls law
Corpus searches the Post Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.
