§ 13.12.050 — Construction of municipal water system
Code of Ordinances of the City of Post Falls, Idaho (Codified through Ordinance No. 1549, enacted February 17, 2026. (Supp. No. 5)) · Post Falls Code of Ordinances § 13.12.050
Corpus is an independent public-information project, not the official City of Post Falls website. Stable reference: corpuslaw.us/code/12baf00b-708d-4a9f-866d-c519e398bef3
13.12.050. - Construction of municipal water system.
A. It is unlawful for any Person to construct or extend the city water system within the jurisdiction of the city without first having made formal application to the city and having received written approval and having complied with all regulations of the city and regulatory agencies. Plans for construction of the water system components shall be submitted to the city along with an application for service for the city's review and approval. A plan review and inspection fee in an amount to be set by resolution may be assessed for the review and inspection. B. Developers of land or property Owners may be required to furnish, at no cost to the city, suitable right-of-way and/or easements for construction, operation and maintenance of new, existing or future water lines. C. The city may require city approved full or part time inspection of any water system construction and/or may require a developer to expose any section of water line to check compliance with applicable standards. The cost of such inspection and/or excavation shall be at the expense of the developer. D. All construction must be in compliance with the applicable city ordinances and standards (whether adopted by ordinance or resolution or specified by the city engineer), and state and federal regulations, including the requirement to obtain the necessary permits and to pay the permit fees prior to commencement of construction. The plans shall be designed by a professional engineer (engineer of record) licensed in the State of Idaho. E. Prior to the city accepting dedication of any system components, the developer shall provide to the city the following: 1. Certification by the engineer of record that the system was constructed in accordance with the plans and specifications. 2. Copies of all field tests and inspection notes. 3. "As built" drawings of the system components acceptable to the city engineer. 4. Acceptance by any required outside agencies. 5. Any required easements or rights-of-way for the city's continued operation of the system. 6. Assurance and proof that no liens or encumbrances exist against installed system components. F. No building permits will be issued for new development connecting to new water lines until the ownership of the Sewer lines is dedicated to the city free and clear of all liens and encumbrances and accepted by the city or as otherwise provided by city ordinance to guarantee construction.
(Ord. 1029 § 2, 2003)
Ask a question about Post Falls law
Corpus searches the Post Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.