For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.16.070 — Construction of sewer system

Code of Ordinances of the City of Post Falls, Idaho (Codified through Ordinance No. 1549, enacted February 17, 2026. (Supp. No. 5)) · Post Falls Code of Ordinances § 13.16.070

Corpus is an independent public-information project, not the official City of Post Falls website. Stable reference: corpuslaw.us/code/cf13f1bd-ee14-4643-9b53-e8538100655d

13.16.070. - Construction of sewer system.

A. It is unlawful for any Person to construct a community sanitary Sewer system component or surface water collection or retention facility within the jurisdiction of the city without first having made formal application to the city and receiving written approval and having complied with all regulations of the city and applicable regulatory agencies. Plans for construction of any water reclamation system component shall first be submitted to the city along with the application for service for the city's review and approval. A plan review and inspection fee in an amount to be set by resolution shall be assessed for the review and inspection. B. Developers of land or property Owners are required to furnish, at no cost to the city, suitable right-of-way and/or easements for construction, operation and maintenance of new, existing or future Sewer lines and surface water management facilities. C. The city may require city approved full or part time inspection of any related construction and/or may require a developer to expose any section of sanitary Sewer or any facet of a surface water facility to monitor compliance with applicable standards. The cost of such inspection and/or excavation shall be at the expense of the developer. D. All construction must be in compliance with the applicable city ordinances and standards, and state and federal regulations, including the requirement to obtain the necessary permits and to pay the permit fees prior to commencement of construction. The plans shall be designed by a professional engineer (engineer of record) licensed in the State of Idaho. E. Prior to the city accepting the system, the developer shall provide to the city the following: 1. Certification from the engineer of record that the system was constructed in accordance with the approved plans and specifications and city minimum quality control standards. 2. Copies of all field tests and inspection notes. 3. "As built" drawings of the system to current city standards. 4. A copy of the video of the interior of the lines that has been reviewed and approved by the engineer of record and the city. 5. Any additional items identified within a construction improvement agreement. 6. Acceptance by any required outside agencies. 7. Any required easements or rights-of-way for the city's continued operation of the system components. 8. A warranty and maintenance bond covering the design, construction materials, and workmanship must be provided for a period of two (2) years from the date of acceptance for maintenance by the city. The surety amount shall be a percentage of the approved construction cost estimate as set forth in the city's subdivision regulations. F. No building permits will be issued for new development connecting to new sewerage systems until the ownership of the Sewer lines is dedicated to the city free and clear of all liens and encumbrances and accepted for public use by the city, unless surety is otherwise committed to assure completion pursuant to provisions of this Code. No certificate of occupancy shall be issued for surety backed connections until the sanitary Sewer facility has been inspected and finally accepted for public use.

(Ord. 1251, 2013)

Ask a question about Post Falls law

Corpus searches the Post Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.