For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.60.010 — Requirements

Code of Ordinances of the City of Post Falls, Idaho (Codified through Ordinance No. 1549, enacted February 17, 2026. (Supp. No. 5)) · Post Falls Code of Ordinances § 15.60.010

Corpus is an independent public-information project, not the official City of Post Falls website. Stable reference: corpuslaw.us/code/9b72360d-d524-4046-b21e-a83710e7d01b

15.60.010. - Requirements.

The Building contractor, during the Building construction process, and the Developer during the subdivision construction process, shall without further order and at the contractor's or Developer's expense, be responsible to keep the property on which work is in progress free from accumulation of waste material or rubbish caused by the contractor's or Developer's employees or agents or by the work, and at all times during the Building or development construction period shall maintain the public rights of way, easements, sidewalks and the surfaces of streets and roads adjacent to the property being developed free and clear of construction materials, waste materials or dirt from the construction site. The contractor or Developer shall take appropriate action to control dust caused by the builder or contractor's operations. This shall include, but not be limited to, watering of exposed areas, cleaning of roadways, etc. This requirement shall be a continuing obligation from the start of construction until a certificate of occupancy is issued or acceptance of the subdivision improvements, whichever is applicable, is issued.

(Ord. 1076 § 1, 2005)

Ask a question about Post Falls law

Corpus searches the Post Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.