§ 18.20.080 — Planned unit development (PUD)

Code of Ordinances of the City of Post Falls, Idaho (Codified through Ordinance No. 1549, enacted February 17, 2026. (Supp. No. 5)) · Post Falls Code of Ordinances § 18.20.080

Corpus is an independent public-information project, not the official City of Post Falls website. Stable reference: corpuslaw.us/code/69f6992d-be3a-4547-b8fc-9259521c5d51

18.20.080. - Planned unit development (PUD).

A. Purpose. A Planned Unit Development ("PUD") is a master planned development that encourages enhanced community design by permitting flexibility in certain development standards in exchange for benefits to the community including Open Space, heightened Site design (when compared to developments utilizing traditional developments standards) and compatibility with surrounding Uses. A PUD may contain a mix of residential, commercial and industrial Uses so long as the proposed Uses are allowed in the underlying zoning district (either as a permitted or specially permitted use). The PUD plan must provide for the integrated design and placement of buildings and Uses within the development as well as internal traffic circulation, pedestrian and bicycle circulation, Open Space, Landscaping and other features necessary to create an efficient, attractive development. B. Scope. All PUDs must comply with the following scope requirements: 1. Maximum residential Density. The maximum allowable residential Density in a PUD is based on the overall gross land area (including the required Open Space areas). The PUD generally may not exceed the overall residential Density allowed in the underlying zoning districts ("base Density"). However, the PUD may exceed the base Density by up to ten (10) percent if the PUD provides an additional five (5) percent of the gross land area as Open Space meeting the requirements of this section. Base densities are established using the values contained in Official Bulk and Placement Table in Section 18.20.040 . 2. Compliance with other city processes and requirements. The PUD must meet all city development standards unless the standard is modified under this section. Additionally, all PUDs must comply with all other applicable development processes and requirements including subdivision regulations. A list of development standards that may be modified by the PUD process is contained in subsection B3 of this section. 3. Development standards subject to a PUD. In order to achieve the purposes of this section, the developer may request modifications to the following development standards: a. Any provision pertaining to the height, bulk, setback or maximum dimensions of any facility. b. Any provision establishing buffering, Landscaping or other similar requirements pertaining to Site design. c. Any provision pertaining to the minimum or maximum dimensions of Lot(s). d. Any provision in title 12, chapter 12.12 and title 17, chapter 17.28 of this Code regarding, driveways, local streets and sidewalks except accessibility standards. e. Any provision pertaining to off-street parking except accessibility standards. C. General Requirements. All PUDs must comply with the following requirements: 1. Ownership Requirements. The entire Site must be under common ownership or control at the time of application and remain under common ownership or control until the PUD plan is approved. 2. Open Space Requirements. Each PUD plan must contain Open Space meeting the following requirements: a. Size and Exclusions. A minimum of ten (10) percent of the gross land area in any PUD must be reserved for Open Space areas usable for a mix of active and passive recreational activities by all occupants of the area being developed. Individual Open Space areas within the Site should be large enough to be usable for park land and/or other recreational Uses while remaining within a reasonable walking distance for occupants of the development. Areas dedicated or set aside for public Rights-of-Way, private streets, street side stormwater swales or utility easements, required landscape Buffers, setback areas, and/or common private Parking Areas (other than Parking Areas necessary to meet parking standards for the Open Space areas) cannot be included in the calculation of the required minimum Open Space. Stormwater management areas and utility easements are generally excluded from the calculation of Open Space areas unless the primary Use and design of the area is for recreational purposes and the Use of the area for stormwater management or utilities does not impair the Use of the area for its designed recreational use. b. Demarcation of Open Space areas. Open Space areas must be clearly demarked by creating separation from adjoining developed areas with plants, landscaped earth Berms, fences, walls, or a combination of such elements. c. Maintenance. Open Space areas may be either privately maintained or dedicated for public ownership and maintenance (if the dedication is formally accepted by the city). If any Open Space area is to be privately maintained, an owner's association must be formed to ensure that the Open Space is perpetually maintained in an acceptable manner, which includes irrigation of all landscaped areas with an automated irrigation system. If any Open Space area is to be dedicated to the public for ownership and maintenance, it must be dedicated to the public with the first block of development unless otherwise agreed to in writing by the city. d. Coordination with Other Open Space Areas. When preparing the PUD plan, the developer should coordinate Open Space areas, trails and amenities within the Site and with other Open Space areas/parks to create a larger, more efficient city-wide Open Space system that provides a greater range of amenities. D. PUD Application Requirements. A PUD application must contain or be accompanied by the following information: 1. Legal Description. A legal description of the Site approved by an Idaho licensed surveyor or engineer must be included in the application. 2. Project Narrative. A narrative outlining the proposed PUD plan that, at a minimum, addresses the existing Uses on the Site, the proposed Uses for the Site and how those Uses fit into the Uses in the surrounding area, compatibility with the approval criteria, a list of all proposed deviations from city development standards, and an explanation of how the requested deviations allow for a heighted design that benefits the community. 3. PUD Plan. The application must be accompanied by a set of plans depicting the following elements: a. Dimensions. Site dimensions and property lines. b. Topography. Topography of the Site using two-foot contours. c. Existing Features. Existing Site features including major wooded areas, significant natural, scenic and/or historical features, Structures, Rights-of-Way, streets, easements, utility lines and land Uses. d. Transportation Plan. A plan depicting all arterial, collector, planned local road ways and pedestrian/bicycle facilities within the development area. Identify and provide proposed street and trail sections. e. Landscape Plan. A landscape plan for all planned private Open Space and Rights-of-Way areas. f. Block Development Plan. A block development plan depicting the scope of each block of development and a timetable for implementation of the PUD plan elements, which includes the timing of the dedication and/or development of the Open Space. Blocks can be developed in any order provided that each block contain all of the infrastructure necessary to exist as a stand- alone development. 4. Authorized Signature and Proof of Title. The application must be signed by each owner or by a person having the approval of each owner and be accompanied with, proof of legal title to the entire Site, proof of authorization to file the application (if applicable), and proof of common control (if not under common ownership). 5. Will-Serve Letters. If public utility service is to be provided by an entity other than the city, the application must include a "will-serve" letter from the entity indicating that the entity has sufficient capacity to service the entire development. 6. Fee. The current PUD application fee in an amount set by resolution of the city Council. E. PUD Review and Approval Criteria. The planning and zoning Commission will hold a public hearing to consider the proposed PUD plan following the quasi-judicial hearing procedures contained in section 18.20.060 of this chapter. In order to approve a proposed PUD plan the Commission must determine that the proposal meets each of the following approval criteria: 1. The proposed PUD provides for adequate utilities, services, and parking to service the proposed development by: a. Providing a public water supply system that has adequate supply to serve the proposed development; and b. Providing a public wastewater collection system that is designed in accordance with the city's adopted wastewater master plan and has sufficient capacity to accommodate the proposed sewer flows; and c. Providing adequate accommodation for other utilities necessary to support the proposed development; and d. Providing sufficient parking throughout the development to adequately meet the parking needs of all Uses proposed in the PUD. 2. The proposed PUD provides for an integrated transportation network that adequately serves the proposed development by: a. Providing for the continuation of arterial and collector streets, meeting city standards for traffic volume, in a manner consistent with the city's adopted transportation master plan; and b. Providing a local street network that allows adequate traffic circulation and snow storage throughout the entire development; and c. Providing a pedestrian and bicycle system designed to provide adequate circulation throughout the entire development and to all Open Space areas. 3. The proposed PUD provides enhanced community design by: a. Conserving and incorporating the Sites significant natural, scenic and/or historical features in the development, if any; and b. Integrating a mix of compatible land Uses in the development and adequately buffering and/or separating any incompatible Uses in the development; and c. Locating the proposed Uses and Lot sizes in the proposed PUD in a manner that blends with the surrounding Uses, neighborhoods and public facilities located in the city; and d. Providing at least ten (10) percent of the gross land area for Open Space that meets the recreational needs of the users of the development and provides for a variety of recreational uses; and 4. The proposed PUD provides for timely development of the property and security for future completion and maintenance by: a. Ensuring that each development block contains all the necessary element to exist independently from future blocks; and b. Ensuring that each building in the development Lot has sufficient access around the Structure to allow for continual maintenance of the building and access for emergency services. c. Ensuring that a funding mechanism exists to adequately maintain common areas that are not publicly maintained. F. Development of the PUD. Following final approval of the PUD plan, parcels within the PUD may be subdivided pursuant to title 17 of this Code and sold but development of each parcel must conform to the approved PUD plan in all material respects unless an amendment to the PUD plan is approved. Prior to subdividing any Lots, the developer must construct or otherwise secure the construction of all public infrastructure as required by title 17, chapter 17.24 of this Code. If the PUD is to be developed without subdivision, issuance of building Permits will be conditioned upon completion of all necessary public infrastructure prior to issuance of a certificate of occupancy. Additionally, the developer must submit the proposed CCRs for the development to the Zoning Administrator for review. The CCRs must require the formation of an owner's association for the perpetual maintenance of all common areas and require that the owner's association obtain the approval of the city prior to amending the CCRs in any manner that would change the maintenance obligation of the owner's association. The city will not approve any final plats, issue building Permits or other development approval until such time as the CCRs have been submitted to, and approved by, the city. G. Amendments to a PUD Plan. Any material modification of an approved PUD plan, or removal of a PUD plan, must be approved by following the same review and approval procedure required by this section for a new PUD plan. The Zoning Administrator is authorized to determine whether the proposed plan amendment is material or to submit that question to the planning and zoning Commission for determination. If the modification to the plan is immaterial, the modification may be approved or denied by the Zoning Administrator, who may modify, or require new conditions of approval, as necessary to ensure that the intent of the original approval is met. For the purposes of this section a material modification is any modification that alters the layout of the major transportation elements of the plan, changes the Uses authorized by the plan, increases the Density of the development, decreases the amount of Open Space or the types of recreational Uses in the plan, changes the alternate development standards approved for the plan, alters a condition of approval or otherwise makes a material change to the plan.

(Ord. 1433 § 6, 2021; Ord. 1330, 2018)