§ 18.24.060 — Site disturbance
Code of Ordinances of the City of Post Falls, Idaho (Codified through Ordinance No. 1549, enacted February 17, 2026. (Supp. No. 5)) · Post Falls Code of Ordinances § 18.24.060
Corpus is an independent public-information project, not the official City of Post Falls website. Stable reference: corpuslaw.us/code/feb8d01d-a9d3-41ae-88b3-51339f43aa0f
18.24.060. - Site disturbance.
The intent of this section is to protect the existing natural topography and prevent erosion of land by restricting construction activity that may cause accelerated soil erosion or sedimentation due to unstable soils, steep slopes, high groundwater, or road and building construction. Exempt from these requirements are emergency grading activities necessary to protect lives or property. A. Any person or agency planning or conducting a land disturbing activity involving the following Sites shall submit a plan for erosion and sediment control when applying for a building Permit, Special Use Permit, Planned Unit Development or subdivision Permit: 1. Sites that are in high erosion hazard areas as determined by the city engineer by nature of the slope, soil characteristics or by concentration of drainage or by existing or proposed stormwater runoff influence. 2. Sites where the slope is fifteen (15) percent or more. 3. Sites where disturbance could have water quality impacts on the Spokane River, as determined by the city engineer. 4. Sites that have the potential to discharge stormwater to the surface waters of the United States (Spokane River) and are greater than one acre in size or less than one acre that are part of a larger project totaling more than one acre. B. The following information is required on erosion control plans, unless waived by the city engineer. An engineer or landscape architect, licensed in Idaho, must stamp and sign plans submitted pursuant to this section. 1. Information thoroughly describing the construction of facilities, grading, filling or clearing of vegetation from the Site, including resulting slopes, identification of runoff potential, soil depth, erosion potential and natural drainage. 2. Contours must be depicted at two-foot intervals for slopes up to fifteen (15) percent and five-foot intervals for slopes over fifteen (15) percent, showing the topography of the ground to be graded, filled, or cleared and the topography of the ground within fifteen (15) feet of the Site, before and after the proposed Site work. Spot elevations must be provided at high and low points, Grade breaks, and inlets to drainage control Structures. 3. Evaluations, proposed grading, dimensions and location of proposed construction, including calculated quantities of earth to be moved must be addressed. 4. The type and location of all temporary and permanent runoff control methods, including those to be used during construction to prevent the discharge of degraded runoff water into surface waters must be depicted and described. 5. Slope stabilization methods employed, identifying the location, design and specifications for slope stabilization that will be utilized during and after construction of the project. 6. Revegetation/remediation strategy must be provided, specifying the methods to be used following completion of the project. 7. A copy of the notice of intent (NOI), as required by the EPA, for projects greater than one acre in size, or less than one acre that are part of a larger project totaling more than one acre, and having the potential for runoff discharge to surface waters of the United States (Spokane River).
(Ord. 1237, 2012)
Ask a question about Post Falls law
Corpus searches the Post Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.
