For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.42.050 — Commercial/Industrial application

Code of Ordinances of the City of Post Falls, Idaho (Codified through Ordinance No. 1549, enacted February 17, 2026. (Supp. No. 5)) · Post Falls Code of Ordinances § 8.42.050

Corpus is an independent public-information project, not the official City of Post Falls website. Stable reference: corpuslaw.us/code/e118ad44-d199-47c5-8380-b6ab3e35415e

8.42.050. - Commercial/Industrial application.

Each commercial and/or industrial undertaking which involves a Critical Materials Use Activity must obtain a CMCC by submission of an application to the Director for review. Such application must require: A. Sufficient information to allow for the determination of the type, quantity, and physical state of all Critical Materials that are used, stored, manufactured, or handled at the Facility location. The Director may require that the applicant provide a complete list of Critical Materials present at the Facility. B. Building plans and site development drawings showing compliance with the secondary containment requirements established by this chapter. Such plans must provide confirmation that the secondary containment methods are compatible with the materials to be contained and that Critical Materials at the Facility are isolated from storm water or other surface waters on the site. The Director may require that any such plans be certified by a licensed engineer. The building and/or site plans must show the location of Critical Materials in buildings and other designated site areas. C. Proof of contact and resultant acknowledgment from other agencies which have codes, standards, and/or rules which must be met by the applicant with respect to handling of Critical Materials. D. An opportunity for the Director to perform an inspection to evaluate chemical handling and storage at the Facility. E. The Director will evaluate the application in consideration with the BMP Manual to determine status of Facility for applicability of this chapter. A CMCC will be issued to Fixed Facilities when it is determined that the application is complete and meets the requirements of both this chapter and the BMP Manual, and an inspection, if required, demonstrates compliance with secondary containment criteria previously approved through the plan review. F. If the CMCC is denied, the Director must issue a written statement to the applicant, stating in what way the application is incomplete or does not meet the requirements of this chapter. G. The applicant may appeal the denial of a CMCC application in accordance with PFMC 8.42.090.

(Ord. No. 1517, § 1, 9-3-2024)

Ask a question about Post Falls law

Corpus searches the Post Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.