§ 19-27 — Cable System Construction/Reconstruction Scheduling
Code of Ordinances, City of Aurora, Illinois; partial · Aurora Code of Ordinances § 19-27
Corpus is an independent public-information project, not the official City of Aurora website. Stable reference: corpuslaw.us/code/e98a1770-1462-4756-9b53-eb2edfbfe59b
Sec 19-27 Cable System Construction/Reconstruction Scheduling
(a) Franchise applications for an initial franchise shall include a schedule for construction of the initial build out of the CATV system. In the case of a franchise that is being considered for renewal, the renewed franchise agreement shall include a schedule for upgrade, if no upgrade has been undertaken during the then existing franchise, or if an upgrade is deemed by the city to be necessary to meet market conditions during the term of the renewed franchise, and shall include a timetable for commencement or enhancement of CATV services to subscribers. (b) Within three (3) months after acceptance of a new initial franchise or renewed franchise, grantee shall furnish the franchising authority with a copy of preliminary engineering drawings and an operating construction schedule setting forth target dates by area for construction activity. If substantial changes become necessary, grantee shall modify such drawings and schedule to reflect any substantial changes. No permit for such construction or reconstruction shall be granted without the provision of the aforementioned drawings and schedule; provided, however, that the grantee may identify such drawings as being confidential in accordance with the Illinois Freedom of Information Act. (c) Grantee shall furnish the franchising authority progress reports on construction or upgrade of the CATV system at such time and in such manner as reasonably determined by the city engineer or cable/video administrator. (d) Grantee shall provide as built maps, which are capable of being reproduced and in an electronic format that can be utilized by the city's geographic information system (GIS), of the cable system to the city within ninety (90) days after the initial construction or upgrade of the cable system is substantially completed. If a grantee desires, it may provide a set of as built drawings that shall be public records, and a separate set of detailed maps containing proprietary information that the city would agree to protect from public disclosure as can be protected under the Illinois Freedom of Information Act laws. (e) If a grantee is delayed in completing the initial construction or reconstruction upon renewal of a franchise of a CATV system and such delay is beyond the physical or administrative control of the grantee, grantee shall notify the franchising authority of said delay and shall indicate the cause or causes for the delay. Upon receipt of notification by the grantee of such delay, the franchising authority and the grantee shall determine a revised schedule for the recommencement and completion of the work. In the event that the delay continues beyond the control of grantee, and extends beyond the agreed-upon date, the franchising authority and the grantee revise the schedule in like fashion. Delays in construction or service that extend beyond any final dates agreed upon by grantee and the franchising authority in a franchise agreement or otherwise shall constitute a violation of this article. (Ord. No. O07-134, § 1, 11-27-07)
Ask a question about Aurora law
Corpus searches the Aurora sections it holds and shows the ones that match, with their citations. Free, no sign-in.