Sec 42-303 Permit Required; Applications And Fees
(a) Permit required. No utility, including contractors and subcontractors of a utility, shall construct, repair, replace, enlarge or maintain any facility on, over, above, along, upon, under, across, or within any right-of-way or otherwise disrupt the right-of-way, without first filing an application with the city engineer or other person designated by the corporate authorities for that purpose and obtaining a permit from the city therefore, except as otherwise provided in this chapter. (b) Permit application. All applications for permits pursuant to this chapter shall be on a form acceptable to the city and shall be filed in such number of duplicate copies as the city may designate. (c) Confidentiality. An applicant may designate those portions of its application documentation as "proprietary" or "confidential" by clearly marking each page or portion thereof accordingly, and such material shall be treated as confidential by the city, subject to law. If the city receives a request for disclosure of such information, the city shall deny the request as to the material designated "proprietary" or "confidential". If the city is challenged regarding the non-disclosure of such material, the applicant shall indemnify, hold harmless and defend the challenge at the applicant's cost. If the applicant does not indemnify, hold harmless and defend the city in respect to the non-disclosure of such material, the city may defend the challenge, and the applicant shall reimburse the city its reasonable attorneys' fees and costs incurred. The required as-built drawings and the location of facilities in the rights-of-way shall not be subject to the protection of confidentiality. (d) Minimum general application requirements. An application for a permit required by this chapter shall be filed by a duly authorized representative of the utility and shall contain, at a minimum, the following: (1) The utility's name and address, telephone and telecopy numbers and e-mail address; (2) The name and address of the person completing and signing the application on behalf of the utility, along with a direct telephone number, telecopy number, e-mail address, and representative capacity in respect to the utility, and, if the person completing the application is an agent of a contractor, subcontractor or consultant of the utility, the name and contact information of that contractor, subcontractor or consultant and its interest in the work; (3) The names, addresses and telephone and telecopy numbers and e-mail addresses of all professional consultants, if any, advising the applicant with respect to the application; (4) A general description of the proposed work and the purposes and intent of the facility and the uses to which the facility will be put. The scope and detail of such description shall be appropriate to the nature and character of the work to be performed, with special emphasis on those matters likely to be affected or impacted by the proposed work. (5) The following documentation: a. A written traffic control plan in compliance with IDOT standards for routing traffic in the event of lane blockage and demonstrating the protective measures and devices that will be employed consistent with the Illinois Manual on Uniform Traffic Control Devices, to prevent injury or damage to persons or property and to minimize disruptions to efficient pedestrian and vehicular traffic. Said plan must be prepared and signed and sealed by an Illinois Registered Professional Engineer; and b. Where an application indicates that an applicant's use of the right-of-way may involve situations that pose a potential risk to public health and safety, the applicant shall submit an emergency contingency plan which shall specify the nature of potential emergencies, including, without limitation, construction and hazardous materials emergencies, and the intended response by the applicant. The proposed response shall include notification to the city and shall promote protection of the safety and convenience of the public and shall be subject to review by the city's emergency management coordinator and the fire chief with ICC regulations for emergency contingency plans constitutes compliance with this section unless the city finds that additional information or assurances are needed; c. Drawings, plans and specifications showing the work proposed along with all existing utilities (field verified) within thirty (30) feet of proposed work, including the certification of an Illinois licensed professional engineer that such drawings, plans, and specifications comply with applicable codes, rules, and regulations; including but not limited to the city's codes and ordinances for improvements within the public right-of-way; d. Evidence of insurance as required in section 42-307 of this article; e. Evidence of posting of the security fund as required in section 42-309 of this article; f. A statement as to whether a right-of-way or any contiguous private property is the subject of a recorded easement or license agreement for the roadway or right-of-way. (6) Any request for a variance from one or more provisions of this article (See section 42-321); and (7) Such additional information as may be reasonably required by the city. (e) Supplemental application requirements for specific types of utilities. In addition to the requirements of subsection (d) of this section, the permit application shall include the following items as applicable to the specific utility that is the subject of the permit application: (1) In the case of the installation of a new electric power, communications, telecommunications, cable service, video service or natural gas distribution system, evidence that any "certificate of public convenience and necessity" or other regulatory authorization that the applicant is required by law to obtain, or has elected to obtain, has been issued by the ICC or other jurisdictional authority; (2) In the case of natural gas systems, state the proposed pipe size, design, construction class, and operating pressures; (3) In the case of water lines, indicate that all requirements of the city, and the Illinois Environmental Protection Agency, division of public water supplies, have been satisfied; (4) In the case of sewer line installations, indicate that all requirements of the City of Aurora, Fox Metro Water Reclamation District, and the land and water pollution requirements of the Illinois Environmental Protection Agency, Division of Water Pollution Control and any other local or state utilities with jurisdiction, have been satisfied; or (5) In the case of petroleum products pipelines, state the type or types of petroleum products, pipe size, maximum working pressure, and the design standard to be followed. (6) In the case of communication facilities, the provisions and documentation required in chapter 19 of the City of Aurora Code of Ordinances shall also be applicable. (f) Applicant's duty to update information. Throughout the entire permit application review period and the construction period authorized by the permit, any amendments to information contained in a permit application shall be submitted by the utility in writing to the city within fourteen (14) days after the change necessitating the amendment. (g) Application fees. Unless otherwise provided by franchise, license, or similar agreement, all applications for permits pursuant to this article shall be accompanied by a fee in the amount specified in city fees schedules. No application fee is required to be paid by any telecommunications retailer that is paying the municipal telecommunications infrastructure maintenance fee or the optional state telecommunications infrastructure maintenance fee pursuant to the Simplified Municipal Telecommunications Tax Act, or by any electricity utility that is paying the municipal electricity infrastructure maintenance fee pursuant to the Electricity Infrastructure Maintenance Fee Act. (h) Permit prohibitions. (1) No large freestanding cabinet facility shall be permitted in any right-of-way contiguous to the front yard or the corner side yard of any private property unless the zoning district in which the private property is located permits the installation of freestanding cabinet facilities in front yards or corner side yards. (2) No large freestanding cabinet facility shall be permitted in a right-of-way contiguous to a transition yard as defined by the zoning ordinance without a variation granted by the corporate authorities through the land use and zoning division. (3) No large freestanding cabinet facility shall be permitted to be installed above or on any existing or planned future raw or potable water line, sanitary sewer improvement, combined sewer improvement, communication line, electrical line, gas line or storm water sewer improvement or city facility. (4) No large freestanding cabinet facility shall be located in such a way that it will interfere with vehicular of non-vehicular traffic on a roadway or non-vehicular way or other designated use of a right-of-way or in such a way that it adversely affects the public health, safety or welfare. (5) No large freestanding cabinet facility shall be located within two hundred fifty (250) feet of any other large freestanding cabinet facility without a variance from zoning. (6) No facilities shall be permitted underground where there is inadequate space in the underground portion of a right-of-way to permit access maintenance and replacement of existing underground facilities. (Ord. No. O17-082, § Exh. A, 11-14-17)
Ask a question about Aurora law
Corpus searches the Aurora sections it holds and shows the ones that match, with their citations. Free, no sign-in.