For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 43-104 — Construction Review

Code of Ordinances, City of Aurora, Illinois; partial · Aurora Code of Ordinances § 43-104

Corpus is an independent public-information project, not the official City of Aurora website. Stable reference: corpuslaw.us/code/a42c2a2b-980e-488f-b3fb-1822dc171123

Sec 43-104 Construction Review

(a) As a condition to the approval of a planned subdivision, all construction shall be carried forward in a workmanlike manner following an orderly step-by-step process to final completion. All the improvements constructed or erected shall meet the applicable requirements of the subdivision control ordinance with all construction being subject to frequent inspections by the city engineer or his representatives. (b) Each phase of construction which supports subsequent construction must be satisfactorily completed, maintained and inspected before the next phase can be commenced. (c) All procedures and materials shall be inspected and/or tested according to the most recent cited standard (AASHTO or ASTM) methods of test or other methods as specified by the city engineer. The frequency and type of inspections, testing and reporting shall be as described in the standards cited in section 43-102(a), or as specified by the city engineer. (d) Copies of all materials certifications, inspection reports, testing reports and daily log sheets not previously submitted shall be submitted to the city engineer upon request. (e) The subdivider or his agent shall notify the city engineer not less than seventy-two (72) hours before commencing any work on the streets including the following: (1) The construction of any underground facility, including trench and backfill for telephone, gas, electric, water and sewer, street light conduits and cables and other items; (2) The construction of the roadway, subgrade, earth embankment, earth borrow, undercutting, removal of unsuitable material, culverts, tree removal and other items; (3) The placement of the base course material; (4) The installation of any curbing, gutters or sidewalks; (5) The placement of the surface course material. (f) The city engineer or his duly authorized representative may order a stop to any phase of the work found to be in noncompliance with this chapter, and noncompliance in one area of a subdivision shall be grounds to withhold approvals in another area of the subdivision. (Code 1969, § 43-90)

HISTORY Amended by Ord. O20-109 on 12/22/2020

Ask a question about Aurora law

Corpus searches the Aurora sections it holds and shows the ones that match, with their citations. Free, no sign-in.