Sec 43-13 Prerequisites To Occupancy Permits
(a) Prior to the issuance of an occupancy permit: (1) The bituminous concrete binder course must be installed and approved by the city engineer, unless a variance is granted by said city engineer; and (2) A final "as built" topographical survey no larger than eleven (11) inch by seventeen (17) inch must be prepared on Mylar for each building site, and submitted to the city engineer, through the building and permits department. Said survey must be prepared under the direction of an Illinois registered professional land surveyor or engineer. The survey shall include all information required as described in the Standard Specifications for Improvements, and must be approved; and (3) The city engineer shall verify the proper function of all required public improvements previously accepted under section 43-103 which are within or immediately adjacent to such lot. (4) The city engineer shall perform an inspection, initiated by the submission of the "as built" topographical survey to insure that the public improvements associated with and adjacent to the subject lot are completed in accordance with the Standard Specifications for Improvements. The developer shall promptly cure any deficiencies cited by the city engineer and thereafter request re-inspection in accordance with paragraph (5) below. (5) Re-inspections. Builders, whose lots fail the initial inspection, must arrange with the engineering department for a re-inspection of the failed items. This request must be in writing and in reference to this department's written notice of failure. A re-inspection fee shall be assessed pursuant to the schedule established in accordance with section 43-11 above. (6) A temporary occupancy permit may be issued at any time of the year, notwithstanding the failure to complete improvements required by this section, if a bond in one of the following forms is posted with the city so as to insure completion and approval of the improvements within specified time limits described as follows: a. Approved bond forms: 1. A check payable to the city in the amount appropriate for the incomplete work, pursuant to the Standard Specifications for Improvements from time to time. 2. An escrow account accessible to the city in the amount appropriate to the incomplete work, pursuant to the Standard Specifications for Improvements from time to time, to be held by the closing agent. Said escrow account to be established using language established by the city. b. Specified time limits: 1. From November 1 to May 31, the work must be completed no later than July 1 of the following year for temp's given during November and December, and in the calendar year of issuance for all others. 2. From June 1 to October 31, the work must be completed and approved within thirty (30) days of the temp's issuance. (7) All temporary occupancy permits will be issued by the building and permits department based on a release letter from the engineering department, and payment of the applicable non-refundable fee to the building and permits department. Applicants must give the engineering department two (2) business days to process a request for temporary occupancy. (8) Failure of the builder to have all work associated with the temporary occupancy completed and approved within the time frames provided for each temporary issued will constitute a failure to comply and result in withholding the issuance of any new building permits to the builder or parent company of the builder. This condition shall remain in effect until all delinquent issues have been submitted, reviewed and approved by the city engineer. This condition may also result in the following: a. Loss of the bond posted for the temporary occupancy. b. The revocation of contractor registration as set forth in the city's building code, section 12-17(116). (b) The city engineer shall be responsible for providing the division of building and permits with sufficient data to ensure compliance with this section prior to the issuance of any occupancy permit. (Code 1969, § 43-12; Ord. No. O88-56, § 2, 5-17-88; Ord. No. O91-88, § 1, 11-5-91; Ord. No. O01-63, § 1, 6-26-01; Ord. No. O10-055, § 1(Exh. A), 9-14-10)
HISTORY Amended by Ord. O20-109 on 12/22/2020
Ask a question about Aurora law
Corpus searches the Aurora sections it holds and shows the ones that match, with their citations. Free, no sign-in.