For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 49-104.3 — Conditional Uses And Structures

Code of Ordinances, City of Aurora, Illinois; partial · Aurora Code of Ordinances § 49-104.3

Corpus is an independent public-information project, not the official City of Aurora website. Stable reference: corpuslaw.us/code/97824d46-a602-42ba-b4fb-e2aef6ef5f47

49-104.3 Conditional Uses And Structures

(a) In General. (1) In the exercise of its home rule authority and the powers conferred by the Illinois Municipal Code and this ordinance, the city council may, from time-to-time permit by specific ordinance the following conditional uses of land or structures in accordance with the procedures set forth in chapter 34 of this code. (2) The term “conditional use” as used throughout this ordinance shall be construed as having the same meaning and construction as the term “special use” as used in Illinois law and provisions of this code enacted prior to the effective date of this amendatory ordinance of 2020. (3) Whenever the city council has previously approved a special use upon any real property or as part of any planned development, such special use shall be regarded as a conditional use for the purposes of this code. (4) Development Agreement. At the Zoning Administrator's sole discretion, a conditional use is conditioned on the owner entering into an agreement with the City concerning the required regulations and performance standards, their applicability to the facility, and other germane matters. City staff is authorized to prepare, negotiate, and have the City execute such agreements, the terms of which cannot be inconsistent with the Zoning Ordinance. (b) Conditional Uses. The Conditional Uses as identified in Table One: Use Categories shall apply. (c) Specific Regulations. (1) Car Wash, Single Bay, when such use is in conjunction to a Gasoline Station as an accessory use to and operated only during the regular business hours of the Gasoline Station. (2) Financial institutions with a drive-through facility, when located at the intersection of two publicly dedicated streets (corner) under the following conditions: a. When said intersection is designated as non-residential on only two of the four corners of the intersection of said two publicly dedicated streets (corner). b. When said intersection is designated as non residential on all four corners and contains one or more existing financial institutions with drive-through facilities located at the intersection of said two publicly dedicated streets (corner). (3) Financial institutions with a drive-through facility, when located within 1000’ of an intersection of two publicly dedicated streets and a. When said intersection is designated as non-residential on only two of the four corners of the intersection of said two publicly dedicated streets (corner) and contains one or more existing Financial institutions with a drive-through facilities located within 1000’ of said intersection, as measured property line to property line. b. When said intersection is designated as non residential on all four corners and contains two or more existing Financial institutions with a drive-through facilities located within 1000’ of said intersection, as measured property line to property line. (4) Drive Through/ Drive In establishment, when located at the intersection of two publicly dedicated streets (corner), under the following conditions: a. When said intersection is designated as non-residential on only two of the four corners of the intersection of said two publicly dedicated streets (corner). b. When said intersection is designated as non-residential on all four corners and contains one or more existing Drive Through/ Drive In establishments located at the intersection of said two publicly dedicated streets (corner). (5) Drive Through/ Drive In establishment, when located within 1000’ of an intersection of two publicly dedicated streets and a. When said intersection is designated as non-residential on only two of the four corners of the intersection of said two publicly dedicated streets (corner) and contains one or more existing Drive Through/Drive In establishments located within 1000’ of said intersection, as measured property line to property line. b. When said intersection is designated as non residential on all four corners and contains two or more existing Drive Through/Drive In establishments located within 1000’ of said intersection, as measured property line to property line. (6) Institutions for the care of the insane or feeble minded, shall be established above the first floor when located in a building constructed for a business use. A building originally constructed for residential use may be used in whole or in part. (7) Intertrack wagering facilities when not located within eight hundred (800) feet of a religious institution, grade school, high school, hospital, nursing home property or any single-family detached residential zoning district. (8) Off-street parking areas within the downtown core constructed after the establishment date of the Downtown Core District, located within front or side yards, or as the sole use of a property. (9) Rest homes and nursing homes, in any R-4, R-5 or B districts, provided that when located in a business district, such uses shall be established above the first floor when located in a building constructed for a business use. A building originally constructed for residential use may be used in whole or part. (10) Transportation uses, such as taxicab and bus waiting rooms, auto rental agencies wholly within a building, and public parking garages for storage of private passenger autos and commercial vehicles under one-and-one-half-ton capacity, in the downtown fringe district. (11) One (1) or more buildings to be redeveloped for use or uses not permitted within the underlying zoning district; provided the proposed use is of a nature that may give rise to problems with respect to impact upon neighboring property and public facilities in any use district. Buildings constructed originally as single-family and two-family dwellings shall not be considered for development under this provision. (12) Hotel, conference, in any ORI, M-1, and M-2 districts when not within one-half (1/2) mile from the centerline of the East West Tollway I-88. (13) Vehicle Repair, Major, in M-1 and M-2 district when confined within an enclosed structure (including autos needing work), and when such lot is located within two hundred fifty (250) feet away from any residential district or lot with residential use. (14) Cannabis Dispensing Facilities (2115) as shown in Table One: Use Categories and in PDD Planned Development Districts within the business and industrial areas under the following conditions: a. Facilities shall at all times comply with all requirements, rules and restrictions, including without limitation, geographic location restrictions, as set forth in the Compassionate Use of Medical Cannabis Pilot Program Act (IL Public Act 098-0122) and the Cannabis Regulation and Tax (IL Public Act 101-0027) or as modified by applicable law, and shall at all times comply with the terms and conditions of any conditional use permit that may be granted in the future. b. On or after January 1, 2020, no more than four (4) adult use cannabis dispensary conditional uses, may be established within the corporate limits. Notwithstanding this limitation, the city council may evaluate and by resolution implement adjustments to the number of adult use cannabis dispensary conditional uses within the city in order to maintain public health, safety, and welfare as well as promote economic development. Any proposed changes shall start at the committee. Of the four cannabis dispensary conditional uses within the City, two (2) shall be reserved and issued for social equity candidates, in order to maximize the state legislature’s intent of section 7-1, article h of the Cannabis Regulation and Tax Act. 410 ILCS 705/7. Non-social equity candidates are required to meet the following requirements for adult use cannabis dispensary conditional use in order to promote public health, safety and welfare: 1. Applicants must establish a minimum of two years of cannabis sales experience (either as a medical dispensary in Illinois, or as a recreational dispensary in another state). c. Facilities shall abut an arterial street as depicted in the comprehensive plan. No more than one (1) dispensary shall be located on a single arterial. A dispensing facility may not be located within a mile and a half (1 ½) of a preexisting dispensing facility located within the corporate limits of the city. d. Facilities shall not be located within seven hundred and fifty feet (750’), measured from property line to property line, of a grade school, middle school, alternative school, or high school. The authorization of a conditional for this purpose should not be affected by subsequent establishment of a school within the restricted area. e. A facility shall not be located adjacent to a licensed day care facility. For the purpose of this limitation, in the case of a standalone building “adjacent” means physically abutting the lot, or in the case of a single structure containing multiple units comprising a shopping center or similar facility, in the unit directly adjoining a unit containing the licensed day care facility. f. No cannabis or paraphernalia shall be displayed or kept at the facility so as to be visible from outside the premises including but not limited to depiction on signage. g. Onsite Use Is Prohibited. No cannabis shall be smoked, eaten or otherwise consumed or ingested on the premises. h. Facilities shall have operating hours not earlier than 8 a.m. and not later than 10 p.m. i. Co-locations: The City may approve the co-location of a Cannabis Dispensing Facility, a Cannabis Craft Grower Facility or a Cannabis Infuser Facility subject to the requirements of State law, zoning requirements and the conditional use criteria within this ordinance. j. Additional conditions may be imposed as part of the conditional use approval to provide for compatibility with adjacent uses and mitigate potential impacts from the dispensing operation. k. The following items shall be submitted as part of the conditional use request: 1. A plan for disposal of any cannabis or byproducts that are not sold to a purchaser or registered qualifying patient or caregiver in a manner that protects any portion thereof from being possessed or ingested by any person or animal and shall abide by applicable state or local regulations. 2. A security plan that includes facility access controls, surveillance systems, on-site security personnel, and other security measures required by state or local regulations. 3. A copy of the operating procedures adopted in compliance with state statutes. Said operations procedures should include provisions with minimum requirements for facility employees or volunteers (paid or unpaid) including individuals must be at least 21 years of age and must pass a criminal background having not been convicted of a felony under any federal or state law or having been convicted of a violation of any federal, state or city law concerning the manufacture, possession or sale of controlled substances or alcoholic liquor. 4. A plan for ventilation of the facility that describes the ventilation systems that will be used to prevent any odor of cannabis off the premises of the business. For cannabis dispensing facilities, such plan shall also include all ventilation systems used to control the environment for the plants and describe how such systems operate with the systems preventing any odor leaving the premises. 5. The name(s) and location(s) of the offsite cultivation facilities associated with the cannabis dispensary. l. For the purposes of the setbacks described in this paragraph, distances shall be measured from property line to property line. (15) Cannabis Processing Facilities (3112) as shown in Table One: Use Categories and in PDD Planned Development Districts within the industrial areas under the following conditions: a. Facilities shall at all times comply with all requirements, rules and restrictions, including without limitation, geographic location restrictions, as set forth in the Compassionate Use of Medical Cannabis Pilot Program Act (IL Public Act 098-0122) and the Cannabis Regulation and Tax (IL Public Act 101-0027) or as modified by applicable law, and shall at all times comply with the terms and conditions of any conditional use permit that may be granted in the future. b. Facilities shall not be located within five hundred feet (500’), measured from property line to property line, of a grade school, middle school, alternative school, or high school. The authorization of a conditional special use for this purpose should not be affected by subsequent establishment of a school within the restricted area. c. No cannabis or paraphernalia shall be displayed or kept at the facility so as to be visible from outside the premises including but not limited to depiction on signage. d. Onsite Use Is Prohibited. No cannabis shall be smoked, eaten or otherwise consumed or ingested on the premises. e. Facilities shall have operating hours not earlier than 8 a.m. and not later than 10 p.m. f. Facilities shall provide evidence upon request of conformity to the performance standards for noise, vibration, smoke, dust, odor, heat, glare, fire hazard and other objectionable influences established by the State of Illinois and administered by the Illinois Environmental Protection Agency, the United States of America and administered by the federal environmental agency, and any applicable County or City ordinance. g. Additional conditions may be imposed as part of the conditional use approval to provide for compatibility with adjacent uses and mitigate potential impacts from the dispensing operation. h. The following items shall be submitted as part of the conditional use request: 1. A plan for disposal of any cannabis or byproducts that are not sold to a purchaser or registered qualifying patient or primary caregiver in a manner that protects any portion thereof from being possessed or ingested by any person or animal and shall abide by applicable state or local regulations. 2. A security plan that includes facility access controls, surveillance systems, on-site security personnel, and other security measures required by state or local regulations. 3. A copy of the operating procedures adopted in compliance with state statutes. Said operations procedures should include provisions with minimum requirements for facility employees or volunteers (paid or unpaid) including individuals must be at least 21 years of age and must pass a criminal background having not been convicted of a felony under any federal or state law or having been convicted of a violation of any federal, state or city law concerning the manufacture, possession or sale of controlled substances or alcoholic liquor. 4. A plan for ventilation of the facility that describes the ventilation systems that will be used to prevent any odor of cannabis off the premises of the business. For cannabis processing facilities, such plan shall also include all ventilation systems used to control the environment for the plants and describe how such systems operate with the systems preventing any odor leaving the premises. (16) Cannabis Infuser Facilities (3113) as shown in Table One: Use Categories and in PDD Planned Development Districts within the industrial areas under the following conditions: a. Facilities shall at all times comply with all requirements, rules and restrictions, including without limitation, geographic location restrictions, as set forth in the Compassionate Use of Medical Cannabis Pilot Program Act (IL Public Act 098-0122) and the Cannabis Regulation and Tax (IL Public Act 101-0027) or as modified by applicable law, and shall at all times comply with the terms and conditions of any conditional use permit that may be granted in the future. b. Facilities shall not be located within five hundred feet (500’), measured from property line to property line, of a grade school, middle school, alternative school, or high school. The authorization of a conditional use for this purpose should not be affected by subsequent establishment of a school within the restricted area. c. No cannabis or paraphernalia shall be displayed or kept at the facility so as to be visible from outside the premises including but not limited to depiction on signage. d. Onsite Use Is Prohibited. No marijuana shall be smoked, eaten or otherwise consumed or ingested on the premises. e. Facilities shall have operating hours not earlier than 8 a.m. and not later than 10 p.m. f. Facilities shall provide evidence upon request of conformity to the performance standards for noise, vibration, smoke, dust, odor, heat, glare, fire hazard and other objectionable influences established by the State of Illinois and administered by the Illinois Environmental Protection Agency, the United States of America and administered by the federal environmental agency, and any applicable County or City ordinance. g. Co-locations: The City may approve the co-location of a Cannabis Dispensing Facility, a Cannabis Craft Grower Facility or a Cannabis Infuser Facility, subject to the requirements of State law, zoning requirements and the conditional use criteria within this ordinance. h. Additional conditions may be imposed as part of the conditional use approval to provide for compatibility with adjacent uses and mitigate potential impacts from the dispensing operation. i. The following items shall be submitted as part of the conditional use request: 1. A plan for disposal of any cannabis or byproducts that are not sold to a purchaser or registered qualifying patient or primary caregiver in a manner that protects any portion thereof from being possessed or ingested by any person or animal and shall abide by applicable state or local regulations. 2. A security plan that includes facility access controls, surveillance systems, on-site security personnel, and other security measures required by state or local regulations. 3. A copy of the operating procedures adopted in compliance with state statutes. Said operations procedures should include provisions with minimum requirements for facility employees or volunteers (paid or unpaid) including individuals must be at least 21 years of age and must pass a criminal background having not been convicted of a felony under any federal or state law or having been convicted of a violation of any federal, state or city law concerning the manufacture, possession or sale of controlled substances or alcoholic liquor. 4. A plan for ventilation of the facility that describes the ventilation systems that will be used to prevent any odor of cannabis off the premises of the business. For cannabis infuser facilities, such plan shall also include all ventilation systems used to control the environment for the plants and describe how such systems operate with the systems preventing any odor leaving the premises. (17) Cannabis Transporting Facilities (4112) as shown in Table One: Use Categories and in PDD Planned Development Districts within the industrial areas under the following conditions: a. Facilities shall at all times comply with all requirements, rules and restrictions, including without limitation, geographic location restrictions, as set forth in the Compassionate Use of Medical Cannabis Pilot Program Act (IL Public Act 098-0122) and the Cannabis Regulation and Tax (IL Public Act 101-0027) or as modified by applicable law, and shall at all times comply with the terms and conditions of any conditional use permit that may be granted in the future. b. Facilities shall not be located within five hundred feet (500’), measured from property line to property line, of a grade school, middle school, alternative school, or high school. The authorization of a conditional use for this purpose should not be affected by subsequent establishment of a school within the restricted area. c. No cannabis or paraphernalia shall be displayed or kept at the facility so as to be visible from outside the premises including but not limited to depiction on signage. d. Onsite Use Is Prohibited. No cannabis shall be smoked, eaten or otherwise consumed or ingested on the premises. e. Facilities shall have operating hours not earlier than 8 a.m. and not later than 10 p.m. f. Facilities shall be the sole use of the tenant space in which it is located. g. The following items shall be submitted as part of the conditional use request: 1. A security plan that includes facility access controls, surveillance systems, on-site security personnel, and other security measures required by state or local regulations. 2. A copy of the operating procedures adopted in compliance with state statutes. Said operations procedures should include provisions with minimum requirements for facility employees or volunteers (paid or unpaid) including individuals must be at least 21 years of age and must pass a criminal background having not been convicted of a felony under any federal or state law or having been convicted of a violation of any federal, state or city law concerning the manufacture, possession or sale of controlled substances or alcoholic liquor. (18) Cannabis Cultivation Facilities (7110) as shown in Table One: Use Categories and in PDD Planned Development Districts within the industrial areas under the following conditions: a. Facilities shall at all times comply with all requirements, rules and restrictions, including without limitation, geographic location restrictions, as set forth in the Compassionate Use of Medical Cannabis Pilot Program Act (IL Public Act 098-0122) and the Cannabis Regulation and Tax (IL Public Act 101-0027) or as modified by applicable law, and shall at all times comply with the terms and conditions of any conditional use permit that may be granted in the future. b. Facilities shall not be located within five hundred feet (500’), measured from property line to property line, of a grade school, middle school, alternative school, or high school. The authorization of a conditional use for this purpose should not be affected by subsequent establishment of a school within the restricted area. c. No cannabis or paraphernalia shall be displayed or kept at the facility so as to be visible from outside the premises including but not limited to depiction on signage. d. Onsite Use Is Prohibited. No cannabis shall be smoked, eaten or otherwise consumed or ingested on the premises. e. Facilities shall have operating hours not earlier than 8 a.m. and not later than 10 p.m. f. Facilities shall provide evidence upon request of conformity to the performance standards for noise, vibration, smoke, dust, odor, heat, glare, fire hazard and other objectionable influences established by the State of Illinois and administered by the Illinois Environmental Protection Agency, the United States of America and administered by the federal environmental agency, and any applicable County or City ordinance. g. Additional conditions may be imposed as part of the conditional use approval to provide for compatibility with adjacent uses and mitigate potential impacts from the dispensing operation. h. The following items shall be submitted as part of the conditional use request: 1. A plan for disposal of any cannabis or byproducts that are not sold to a purchaser or registered qualifying patient or primary caregiver in a manner that protects any portion thereof from being possessed or ingested by any person or animal and shall abide by applicable state or local regulations. 2. A security plan that includes facility access controls, surveillance systems, on-site security personnel, and other security measures required by state or local regulations. 3. A copy of the operating procedures adopted in compliance with state statutes. Said operations procedures should include provisions with minimum requirements for facility employees or volunteers (paid or unpaid) including individuals must be at least 21 years of age and must pass a criminal background having not been convicted of a felony under any federal or state law or having been convicted of a violation of any federal, state or city law concerning the manufacture, possession or sale of controlled substances or alcoholic liquor. 4. A water consumption capacity report for the facility and an infrastructure capacity report for the subject property. 5. A plan for ventilation of the facility that describes the ventilation systems that will be used to prevent any odor of cannabis off the premises of the business. For cultivation facilities, such plan shall also include all ventilation systems used to control the environment for the plants and describe how such systems operate with the systems preventing any odor leaving the premises. (19) Cannabis Craft Grower Facilities (7115) as shown in Table One: Use Categories and in PDD Planned Development Districts within the industrial areas under the following conditions: a. Facilities shall at all times comply with all requirements, rules and restrictions, including without limitation, geographic location restrictions, as set forth in the Compassionate Use of Medical Cannabis Pilot Program Act (IL Public Act 098-0122) and the Cannabis Regulation and Tax Act (IL Public Act 101-0027) or as modified by applicable law, and shall at all times comply with the terms and conditions of any conditional use permit that may be granted in the future. b. Facilities shall not be located within five hundred feet (500’), measured from property line to property line, of a grade school, middle school, alternative school, or high school. The authorization of a conditional use for this purpose should not be affected by subsequent establishment of a school within the restricted area. c. No cannabis or paraphernalia shall be displayed or kept at the facility so as to be visible from outside the premises including but not limited to depiction on signage. d. Onsite Use Is Prohibited. No cannabis shall be smoked, eaten or otherwise consumed or ingested on the premises. e. Facilities shall have operating hours not earlier than 8 a.m. and not later than 10 p.m. f. Facilities shall provide evidence upon request of conformity to the performance standards for noise, vibration, smoke, dust, odor, heat, glare, fire hazard and other objectionable influences established by the State of Illinois and administered by the Illinois Environmental Protection Agency, the United States of America and administered by the federal environmental agency, and any applicable County or City ordinance. g. Co-locations: The City may approve the co-location of a Cannabis Dispensing Facility, a Cannabis Craft Grower Facility, or a Cannabis Infuser Facility, subject to the requirements of State law, zoning requirements and the conditional use criteria within this ordinance. h. Additional conditions may be imposed as part of the conditional use approval to provide for compatibility with adjacent uses and mitigate potential impacts from the dispensing operation. i. The following items shall be submitted as part of the conditional use request: 1. A plan for disposal of any cannabis or byproducts that are not sold to a purchaser or registered qualifying patient or primary caregiver in a manner that protects any portion thereof from being possessed or ingested by any person or animal and shall abide by applicable state or local regulations. 2. A security plan that includes facility access controls, surveillance systems, on-site security personnel, and other security measures required by state or local regulations. 3. A copy of the operating procedures adopted in compliance with state statutes. Said operations procedures should include provisions with minimum requirements for facility employees or volunteers (paid or unpaid) including individuals must be at least 21 years of age and must pass a criminal background having not been convicted of a felony under any federal or state law or having been convicted of a violation of any federal, state or city law concerning the manufacture, possession or sale of controlled substances or alcoholic liquor. 4. A water consumption capacity report for the facility and an infrastructure capacity report for the subject property. 5. A plan for ventilation of the facility that describes the ventilation systems that will be used to prevent any odor of cannabis off the premises of the business. For craft grower facilities, such plan shall also include all ventilation systems used to control the environment for the plants and describe how such systems operate with the systems preventing any odor leaving the premises. (20) Alternative Financial Institutions in B-2, B-3, DC and DF Districts, with a minimum spatial separation of 2,640 feet from property line to property line of any other Alternative Financial Institution and/or Pawnshop. (21) Pawnshop in B-2, B-3, DC, DF, M-1 and M-2 Districts, with a minimum spatial separation of 2,640 feet from property line to property line of any other Pawnshop and/or Alternative Financial Institution. (22) Off-street parking areas within the downtown fringe district constructed after the effective date of this amendatory ordinance of 2020, located within front or side yards, or as the sole use of a property. (23) Automobile parking areas developed for transient trade, and not accessory to specific principal uses or groups of uses for which parking is required by this ordinance, in all zoning districts and planned development districts. (24) Accessory off-street parking facilities serving nonresidential uses of property, in any residential district. (25) Data center facility (3305) as shown in Table One: Use Categories and PDD Planned Development Districts within Office, Research, and Light Industrial, and industrial areas under the following conditions: a. Applicants must submit, in addition to the application materials otherwise required by the Zoning Administrator, the following reports and studies as part of a conditional use request for a data center facility: 1. A baseline pre-development sound study with minimum and maximum dB (A) levels measured for a continuous weeklong period be submitted with the first petitions filed for the development. 2. A Noise Modeling Study completed by a third-party acoustical engineer and submitted demonstrating compliance with the applicable standards to the underlying zoning district and this Section (25). 3. A Water Consumption and Quality Modeling Report completed by a third-party engineer and submitted demonstrating compliance with Illinois Environmental Protection Agency requirements, the applicable standards to the underlying zoning district, and to this Section (25). The study should include the following: proposed water source identification, including but not limited to Municipal potable water supply, surface water withdrawals, reclaimed or recycled water, and any supplement or emergency water sources; estimated average daily water demand (gallons per day); estimated peak daily water demand; estimated annual water consumption; seasonal variability in water use; and projected Water Use Effectiveness as defined in this Section (25). This study must also describe water efficiency strategies, including but not limited to, cooling system type (e.g., closed-loop, hybrid, air-cooled, liquor cooling); water reuse and recycling systems; stormwater capture and reuse, where feasible; and leak detection, monitoring, and automated controls. When closed-loop or hybrid cooling systems are proposed, the Study shall specify the source of make-up water; blowdown volumes and frequency; chemical additives used in cooling water; temperature and quality characteristics of any discharged water; and the method and location of discharge (e.g., sanitary sewer, on-site treatment, reuse, or permitted surface discharge). The Study shall evaluate potential impacts to water quality, including risks of chemical contamination from cooling system additives, biocides, corrosion inhibitors, and other treatment chemicals; risk of accidental releases or leaks; spill prevention and response measures; and on-site storage and handling practices for water treatment chemicals. The Study shall include a Water Quality Protection Plan outlining secondary containment for chemical storage; monitoring protocols for discharge quality; and emergency response procedures for releases or system failures. The study shall specifically address measures to prevent thermal pollution; measures to prevent discharge of contaminants that may degrade receiving waters; and whether any wastewater pretreatment or cooling is required prior to discharge. 4. Energy Consumption Modeling Report completed by a third-party engineer and submitted demonstrating compliance with the applicable standards to the underlying zoning district. b. Chillers must be designed to meet the following requirements: 1. Evaporative chillers utilizing potable water are prohibited. 2. Roof-mounted chillers cannot be located within one thousand five hundred (1,500') feet of any residential, hospital or educational use, measured from the nearest part of the sound attenuation screen or parapet of the building to the property line of the residential, hospital or educational use. The authorization of a conditional use for this purpose will not be affected by subsequent establishment of a residential, hospital or educational use within the restricted area established herein. 3. Any ground-mounted chillers cannot be located within one thousand (1,000') feet of any residential, hospital or educational use, measured from the nearest part of the equipment yard to the property line of the residential, hospital or educational use. The authorization of a conditional use for this purpose will not be affected by subsequent establishment of a residential, hospital or educational use within the restricted area established herein. 4. Upon data center decommissioning and use change, obsolete roof-mounted or ground-mounted chillers and associated equipment must be removed. c. Generators must be designed to meet with the following requirements: 1. Roof-mounted generators are prohibited. 2. All generators must, at a minimum, comply with the state standards set forth in the Municipal and Cooptative Electric Utility Transparent Planning Act (Public Act 104-0458), or as subsequently amended, including but not limited to Tier 4 emission standards in 415 ILCS 5/39(a). 3. All generators must be equipped with vibration isolation systems. 4. Generators cannot be located within one thousand (1,000') feet of any residential, hospital or educational use, measured from the nearest part of the equipment yard to the property line of the residential, hospital or educational use. The authorization of a conditional use for this purpose will not be affected by subsequent establishment of a residential, hospital or educational use within the restricted area established herein. 5. Upon data center decommissioning and use change, obsolete generators and associated equipment must be removed. d. Data Center Facilities must be designed to meet the following performance standards: 1. Noise Standards. i. Data center facilities must comply with all federal and state regulations related to noise thresholds. In addition noise levels must not exceed the following constant-minimum noise thresholds as measured at the facility property line: (a) Daytime hours 57 dB (A) weighted 7am-7pm; and (b) Nighttime hours 47 dB (A) weighted 7pm-7am. ii. Vibrations Standards. Data center facilities must have continuous vibration monitoring at spacing of no less than 500 feet along all property lines within 1,000 feet of residential, hospital or educational uses. iii. Energy Usage Standards. (a) Data center facilities must be designed to maintain a Power Usage Effectiveness of no more than one and two-tenths (1.2). As used in this Chapter "Power Usage Effectiveness" or "PUE" is defined as the ratio of total building energy consumption divided by the total Information Technology equipment (servers, switches, storage devices, etc.). (b) Data centers must be designed to comply with the energy code requirements specified in whichever of the following is most stringent: (a) The latest adopted International Energy Conservation Code (IECC); (b) The latest published AHSRAE Standard 90.4 (Sections 6 & 8); or (c) Illinois-specific data center energy code requirements adopted by rule, which may include more detailed criteria such as Mechanical Load Component (MLC) and Electrical Load Component (ELC) measures. (c) Modular nuclear reactors, small modular reactors or any other nuclear-based energy are prohibited. iv. Water Usage Standards. Data center facilities must maintain a Water Usage Effectiveness of no more than two tenths (0.2). As used in this Chapter, "Water Usage Effectiveness" or "WUE" is defined as the ratio of total potable building water consumption (liters) to Information Technology equipment (kilowatt-hour). e. Screening. Except as expressly modified below, data center facilities must be designed to comply with the following requirements: 1. Roof-mounted mechanical equipment must be fully enclosed on all sides by a sound-attenuating screen or parapet equal in height to, or taller than, the tallest roof-mounted chiller or associated mechanical equipment, and must be designed to blend with the architectural style, materials, and color of the building. 2. Ground Mounted Mechanical Equipment must be fully enclosed on all sides by a sound attenuating wall extension or other sound attenuating enclosure, subject to approval by the zoning administrator, equal in height to, or taller than, the tallest ground-mounted chiller and generator or associated mechanical equipment and must blend with the architectural style, materials, and color of the building. f. On-Site Renewable Energy and Resilience Requirement. 1. All new or expanded data centers shall install and operate, at a minimum, one of the following: i. On-Site Clean Energy: On-site renewable energy generation with a nameplate capacity sufficient to supply not less than twenty-five percent (25%) of the facility's peak electrical demand, as demonstrated in the approved electrical load study; or ii. On-Site Resilience Storage: On-site energy storage capable of supplying not less than fifty percent (50%) of the facility's peak electrical demand for a minimum duration of fifteen (15) minutes, for purposes including grid stabilization, brownout mitigation, and peak-load support. Energy storage systems shall be configured to prioritize discharge during utility-declared peak events and grid emergencies to reduce localized voltage sag, transformer overload, and outage risk in surrounding neighborhoods. 2. Feasibility Alternative Compliance. Where the applicant demonstrates, through a third-party feasibility analysis approved by the City, that on-site installation is infeasible due to site constraints, safety limitations, or grid interconnection restrictions, the applicant shall comply through one or more of the following off-site measures, subject to approval by the City: i. Procurement of new renewable energy generation located within the regional grid serving the municipality, under long-term contract, in an amount equal to the on-site requirements; ii. Investment in distributed energy resources or community-scale battery storage projects located within the municipality or its utility service area. (26) Pre-2026 Data Center Facility which were allowed to be built as Warehouse, Distribution and Storage Services under the then-existing Zoning Ordinance, before March 25, 2026, are allowed to continue to operate as Warehouse, Distribution and Storage Services until and unless the Data Center Facility undergoes wholesale re-development of the property, a building, or a facility on the property. For purposes of this section, "wholesale redevelopment" means that a total of 50% or more of the footprint square footage of a single building structure is demolished and rebuilt as part of a planned improvement to the property, whether the demolition and rebuilding is done at once or over time. Wholesale redevelopment does not include rebuilding after natural disasters or fire even if 100% of the building structure is demolished. Any wholesale redevelopment of a Pre-2026 Data Center Facility must comply with all Post-2026 Data Center Facility Standards. (d) Conditional Use Planned Developments. (1) Generally. Planned developments are conditional uses of a substantially different character from other conditional uses so as to be subject separate standards, exceptions, and procedures as set forth in chapter 34. (2) Required Findings. In conducting a hearing pursuant to chapter 34, the commission shall make a recommendation to the city council as to whether for the duration of a development, specified uses not permitted by the use regulations of the district in which said development is located, the following conditions are satisfied: a. The uses permitted by such exceptions are necessary or desirable and are appropriate with respect to the primary purpose of the development; b. The uses permitted by such exception are not of such a nature or so located as to exercise an undue detrimental influence on the surrounding neighborhood; c. Reserved; d. In an industrial planned development, such additional uses allowed by exceptions shall conform with the performance standards of the district in which the development is located; e. The use exceptions so allowed are reflected by the appropriate zoning district symbols and so recorded on the zoning district map. (3) Regulations. A planned development may embrace exceptions to the bulk regulations generally applicable in the underlying zoning district in which the planned development is located upon a finding by the commission that such exception shall be solely for the purpose of promoting a unified site plan that is as or more beneficial to the residents or occupants of such development as well as the neighboring property than would be obtained by a strict interpretation of the bulk regulations required by the underlying zoning district.

HISTORY Amended by Ord. O22-107 on 12/20/2022 Amended by Ord. O26-022 regarding Data Centers on 3/24/2026

Ask a question about Aurora law

Corpus searches the Aurora sections it holds and shows the ones that match, with their citations. Free, no sign-in.