§ 30-460 — In General
Code of Ordinances of the City of Champaign, Illinois (Codified through C.B. No. 2026-125, adopted August 18, 2026 (Supp. No. 81, Update 1)) · Champaign Code of Ordinances § 30-460
Corpus is an independent public-information project, not the official City of Champaign website. Stable reference: corpuslaw.us/code/bc54344d-f4cf-4b1d-b6bd-33ef24285136
Sec. 30-460. - In General.
(a) Permit to Occupy Required. No person may temporarily occupy or use any City right-of-way other than a roadway for more than four consecutive hours without first obtaining a permit from the Director of Public Works. No person may temporarily occupy a travel lane of a roadway for any purpose not authorized by the Vehicle Code of the State of Illinois or Chapter 33 of this Code without obtaining a permit from the Director of Public Works. The extent of use shall be determined by the Director of Public Works, in his sole discretion, and the permit may be in effect for up to a maximum of one hundred eighty (180) days. A permit may authorize occupancy for a maximum of one City block, or a maximum of five hundred (500) feet if the block is larger than five hundred (500) feet. (b) Closing an arterial street not permitted. No permit shall be issued to close more than two lanes of an arterial street to aid off-street construction without approval of the Director of Public Works. (c) Failure to obtain or vacate. (1) If a person fails to obtain a permit as required, a fee in double the amount which would otherwise have been required shall be collected, and the credit authorized in Subsection 30-232(f)(5) shall not be allowed. (2) If the permittee fails to vacate the right-of-way within the time allowed by permit, fees double the scheduled amount shall be immediately due for each day of delay. (d) When permit not required. A permit is not required if: 1) the only use of the right-of-way is the temporary (less than 24 hours) stopping of a licensed vehicle by a utility operating under a local or state franchise agreement; or 2) the use is by a user or licensee whose franchise or license agreement specifically relieves the franchisee from obtaining right-of-way use permits; or 3) use of the right-of-way is for work being performed by City employees or City contractors; or 4) use for parking in a designated or permitted parking space. (e) Early vacation. If the permittee vacates the right-of-way prior to the permitted date, any daily fee paid for days of occupancy not required shall be refunded upon application to the Director of Public Works.
(C.B. No. 2013-167, § 1(Exh. A), 9-17-13)
Ask a question about Champaign law
Corpus searches the Champaign sections it holds and shows the ones that match, with their citations. Free, no sign-in.
