Chapter 1 — Administration (18-29-101 et seq.)
Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026), Chicago, IL · 28 sections. Independent public-information project, not the official City of Chicago website.
- § 18-29-101.2 — Scope
- § 18-29-101.2.1 — Department of Water Management requirements
- § 18-29-101.2.2 — Department of Water Management requirements
- § 18-29-101.3 — Intent
- § 18-29-102.1 — General
- § 18-29-102.2 — Existing installations
- § 18-29-102.3 — Maintenance
- § 18-29-102.4 — Additions, alterations or repairs
- § 18-29-102.5 — Change in occupancy
- § 18-29-102.7 — Moved buildings
- § 18-29-102.8 — Referenced codes and standards
- § 18-29-102.9 — Requirements not covered by chapter
- § 18-29-105.1 — Modifications
- § 18-29-105.2 — Alternative materials, methods and equipment
- § 18-29-105.3 — Required testing
- § 18-29-105.3.1 — Test methods
- § 18-29-105.3.2 — Testing agency
- § 18-29-105.3.3 — Test reports
- § 18-29-105.4 — Alternative engineered design
- § 18-29-105.4.1 — Design criteria
- § 18-29-105.4.2 — Submittal
- § 18-29-105.4.3 — Technical data
- § 18-29-105.4.4 — Construction documents
- § 18-29-105.4.5 — Design approval
- § 18-29-105.4.6 — Inspection and testing
- § 18-29-105.5 — Material and equipment reuse
- § 18-29-106.1 — General
- § 18-29-107.1 — General
