§ 14A-12-1206.1 — General
Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026) · Municipal Code of Chicago § 14A-12-1206.1
Corpus is an independent public-information project, not the official City of Chicago website. Stable reference: corpuslaw.us/code/8e5157ef-aa6e-40ca-821c-b00f7791886b
14A-12-1206.1 General.
Fees applicable to the provisions of Chapter 6 are as provided in Table 14A-12-1206.1. Table 14A-12-1206.1 Fees – Chapter 6 Section | Description | Amount Section | Description | Amount 14A-6-601.1.2 | Per reinspection | $100 14A-6-601.1.3 | Late payment penalty (per each 30 days past due but not to exceed 100 percent of the assessed fee) | $5 14A-6-602 | Periodic inspection - Group A occupancy | First 25,000 square feet (or fraction thereof) | $120 Each additional 25,000 square feet (or fraction thereof) | $60 Periodic inspection - other than Group A occupancy | First 25,000 square feet (or fraction thereof) | $80 Each additional 25,000 square feet (or fraction thereof) | $40 14A-6-603.2 | Filing fee | $75 Re-review fee for deficient report | $75 14A-6-603.3 | Filing fee | $25 Re-review fee for deficient report | $25 14A-6-603.4 | Filing fee | $75 Re-review fee for deficient report | $75 14A-6-603.5 | Filing fee | $75 Re-review fee for deficient report | $75 14A-6-604.2 | Per curtain | $100 14A-6-604.3 | Per tank (including support structure) | $150 14A-6-605 | Elevator, vertical reciprocating conveyor, or manlift | 10 stories or less a | $105 11 to 20 stories a | $125 21 to 30 stories a | $140 Over 30 stories a | $155 Escalator or moving walk | $75 Movable stage or orchestra floor | $125 Platform lift | $75 Hinged platform lift for trucks or loading docks | $45 Material lifts | $105 Platform lift or stairway lift | $50 Mechanical amusement riding device | Coin-operated (annual permit required) | n/a Other than coin-operated | $100 Any other conveyance device | $75 14A-6-606.2 | Per 1,000 cubic feet per minute of required supply and exhaust (minimum fee: $50) | $5 14A-6-606.3 | Per generator or compressor b | Capacity of 3 tons or less | $50 Capacity over 3 tons and not over 30 tons | $60 Capacity over 30 tons and not over 100 tons | $70 Capacity over 100 tons and not over 1,000 tons | $80 Capacity over 1,000 tons | $100 14A-6-606.4 | Per boiler | Capacity over 288,000 and not over 2.4 million BTU/hr | $50 Capacity over 2.4 million and not over 6 million BTU/hr | $75 Capacity over 6 million BTU/hr | $85 Per unfired pressure vessel | Diameter under 18 inches | $45 Diameter between 18 and 36 inches | $55 Diameter of 36 inches or more | $65 14A-6-607 | Signs | See Ch. 13-20 a. Skip stops must be included when determining number of stories. b. Compressor capacity is based on the applicable Air-Conditioning and Refrigeration Institute published rating for the equipment involved. (Amend Coun. J. 7-21-21, p. 33503, § 1)
Ask a question about Chicago law
Corpus searches the Chicago sections it holds and shows the ones that match, with their citations. Free, no sign-in.
