§ 14A-4-412.1.1 — Drawings not required
Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026) · Municipal Code of Chicago § 14A-4-412.1.1
Corpus is an independent public-information project, not the official City of Chicago website. Stable reference: corpuslaw.us/code/24fae581-c32e-4148-88f2-bc905a43ef78
14A-4-412.1.1 Drawings not required.
If Table 14A-12-1204.2 indicates or the building official determines that drawings are not required for the scope of work covered by a permit application, the permit fee indicated in Table 14A-12-1204.2 must be paid to the City at the time of permit issuance.
Ask a question about Chicago law
Corpus searches the Chicago sections it holds and shows the ones that match, with their citations. Free, no sign-in.
