For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18-28-305.4 — Interval of support

Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026) · Municipal Code of Chicago § 18-28-305.4

Corpus is an independent public-information project, not the official City of Chicago website. Stable reference: corpuslaw.us/code/ce6cf100-a85a-4948-8cbd-5cf1b7e533e9

18-28-305.4 Interval of support.

Piping shall be either supported at distances not exceeding the spacing specified in Table 18-28-305.4, Piping Support Spacing. Table 18-28-305.4 Piping Support Spacing a Piping Material | Maximum Horizontal Spacing (feet) | Maximum Vertical Spacing (feet) Piping Material | Maximum Horizontal Spacing (feet) | Maximum Vertical Spacing (feet) ABS pipe | 4 | 10 c Aluminum pipe and tubing | 10 | 15 Brass pipe | 10 | 10 Brass tubing, 1 1/4-inch diameter and smaller | 6 | 10 Brass Tubing, 1 1/2-inch diameter and larger | 10 | 10 Cast-iron pipe b | 5 | 15 Copper or copper-alloy pipe | 12 | 10 Copper or copper-alloy tubing, 1 1/4-inch diameter and smaller | 6 | 10 Copper or copper-alloy tubing, 1 1/2-inch diameter and larger | 10 | 10 CPVC pipe or tubing, 1 inch and smaller | 3 | 10 c CPVC pipe or tubing, 1 1/4-inch and larger | 4 | 10 c Steel Pipe | 12 | 15 Steel Tubing | 8 | 10 Lead pipe | Continuous | 4 PB pipe or tubing | 2 2/3 (32 in.) | 4 PEX Tubing | 2 2/3 (32 in.) | 10 c PVC pipe | 4 | 10 c For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm. a See Section 18-28-301.18. b The maximum horizontal spacing of cast-iron pipe hangers shall be increased to 10 feet where 10-foot lengths of pipe are installed. c Mid-story guide. (Amend Coun. J. 9-14-21, p. 35949, Art. III, § 4)

Ask a question about Chicago law

Corpus searches the Chicago sections it holds and shows the ones that match, with their citations. Free, no sign-in.