For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2-874 — Design build procurement

Code of Ordinances of the Town of Cicero, Illinois (Codified through Ordinance No. 71-25, adopted September 23, 2025. (Supp. No. 122)) · Cicero Municipal Code § 2-874

Corpus is an independent public-information project, not the official City of Cicero website. Stable reference: corpuslaw.us/code/e3e69bdf-6cfd-4389-8813-ba4a92c28c1a

Sec. 2-874. - Design build procurement.

(a) Definitions. The following words, terms and phrases, when used in this Section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning: Design-bid-build method means the traditional delivery system used for the construction of public improvements by the Town. Design-build means a delivery system that provides responsibility within a single contract for the furnishing of architecture, engineering, land surveying and related services as required, and the labor, materials, equipment, and other construction services for the project. Design-build contract means a contract for a public project under this Section between the Town and a design-build entity to furnish architecture, engineering, land surveying, and related services as required, and to furnish the labor, materials, equipment, and other construction services for the project. The design-build contract may be conditioned upon subsequent refinements in scope and price and may allow the Town to make modifications in the project scope without invalidating the design-build contract. Design-build entity means any individual, sole proprietorship, firm, partnership, joint venture, corporation, professional corporation, or other entity that proposes to design and construct any public project under this Section. A design-build entity and associated design-build professionals shall conduct themselves in accordance with this Code and the laws of the State of Illinois. Design Professional means any individual, sole proprietorship, firm, partnership, joint venture, corporation, professional corporation, or other entity that offers services under the Illinois Architecture Practice Act of 1989 (225 ILCS 305/1, et seq.), the Professional Engineering Practice Act of 1989 (225 ILCS 325/1, et seq.), the Structural Engineering Practice Act of 1989 (225 ILCS 340/1, et seq.), or the Illinois Professional Land Surveyor Act of 1989 (225 ILCS 330/1, et seq.). Evaluation criteria means the requirements for the separate phases of the selection process as defined in this Section and may include specialized experience, technical qualifications and competence, capacity to perform, past performance, experience with similar projects, assignment of personnel to the project, and other appropriate factors. Price may not be used as a factor in the evaluation of Phase I qualifications. Project means the construction, demolition, repair or improvement of any building, bridge, roadway or other structure or any other work or public improvement. Proposal means the offer to enter into a design-build contract as submitted by a design-build entity in response to an RFP issued in accordance with this Section. RFP means the document used by the Town to solicit Phase II proposals for a design-build contract. RFQ means the document used by the Town to solicit Phase I qualifications from design build entities with the capability to enter into a design-build contract. Scope and performance criteria means the requirements for the public project, including but not limited to, the intended usage, capacity, size, scope, quality and performance standards, life-cycle costs, and other programmatic criteria that are expressed in performance-oriented and quantifiable specifications and drawings that can be reasonably inferred and are suited to allow a design-build entity to develop a proposal. Qualifications means a design-build entity's response to a Phase I RFQ issued in accordance with this Section. (b) Upon the concurrence of two-thirds of all of the Town Trustees then holding office, the design-build delivery method may be used for the procurement of Town projects as an alternative to the design-bid-build method. (c) The Town shall follow the following procedure when utilizing the design-build delivery method: (1) A written determination including a description as to the particular advantages of the design-build procurement method and a finding that it is in the best interests of the Town to enter into a design-build contract for the project or projects shall be adopted by the Board of Trustees. In making that determination, the following factors shall be considered: (A) The probability that the design-build procurement method will be in the best interests of the Town by providing a material savings of time or cost over the design-bid-build or other delivery system. (B) The type and size of the project and its suitability to the design-build procurement method. (C) The ability of the Town to define and provide comprehensive scope and performance criteria for the project. (2) The Town shall use a two-phase procedure for the selection of the successful design-build entity. In Phase I, the Town shall issue an RFQ to evaluate and shortlist the design-build entities based on qualifications. In Phase II, the Town shall issue an RFP to evaluate the technical and cost proposals of the design-build entities on the shortlist. (3) The Town shall establish a committee to evaluate and select the design-build entity. The committee shall consist of the following five (5) members: (A) The Town Project Manager. (B) The Town Building Commissioner or his designee. (C) The Town Engineer. (D) The Construction Manager retained by the Town to provide services for the project. (E) The Design Professional retained by the Town to prepare the scope and performance criteria for the RFQ and RFP. (4) The Town shall issue written notice of its intent to receive qualifications for the project at least fourteen (14) days before issuing the RFQ. The written notice shall include a brief description of the proposed project. (5) The Town shall develop the RFQ with the assistance of a Design Professional. The Design Professional that prepares the scope and performance criteria is prohibited from participating in any design-build entity proposal for the project. (6) The Town shall issue a written RFQ for the project that contains, at a minimum, the following information: (A) A preliminary schedule for the completion of the contract. (B) The proposed budget for the project, the source of funds, and the currently available funds at the time the RFQ is submitted. (C) Prequalification criteria for design-build entities wishing to submit proposals. The Town shall include, at a minimum, prequalification, licensing, registration, and other requirements, but nothing contained herein precludes the use of additional prequalification criteria by the Town. (D) Material requirements of the contract, including but not limited to, the proposed terms and conditions, required performance and payment bonds, insurance, and the entity's plan to comply with the utilization goals of Section 2-870. (E) The scope and performance criteria must be in sufficient detail and contain adequate information to reasonably apprise the qualified design-build entities of the Town's overall programmatic needs and goals, including criteria and preliminary design plans, general budget parameters, schedule, and delivery requirements. (F) The evaluation criteria for Phase I of the solicitation. (G) A description of the level of design to be provided in the proposals, if requested in Phase II of the solicitation. This description must include the scope and type of renderings, drawings, and specifications that, at a minimum, will be required by the Town to be produced by the design-build entities. (7) The date that qualifications are due must be at least fourteen (14) calendar days after the date of the issuance of the RFQ. In the event the cost of the project is estimated to exceed $10 million, then the qualification due date must be at least twenty one (21) calendar days after the date of the issuance of the RFQ. (8) The Town shall include in the RFQ the evaluating factors to be used in Phase I. These factors are in addition to any prequalification requirements of design-build entities included in the RFQ. The RFQ shall establish the relative importance assigned to each evaluation factor, including any weighting of criteria to be employed by the Town. The Town shall maintain a record of the evaluation scoring to be disclosed in the event of a protest regarding the solicitation. The following criteria shall be included in every Phase I evaluation of design-build entities: (A) Experience of personnel; (B) Successful experience with similar project types; (C) Financial capability; (D) Timeliness of past performance; (E) Experience with similarly-sized projects; (F) Successful reference checks of the firm; (G) Commitment to assign personnel for the duration of the project and qualifications of the entity's consultants; and (H) Ability or past performance in meeting or exhausting good faith efforts to meet the utilization goals established in Section 2-870. The Town may include any additional relevant criteria in Phase I that it deems necessary for a proper qualification review. (9) Upon completion of the qualifications evaluation, the Town shall create a shortlist of the most highly qualified design-build entities. The Town shall notify the entities selected for the shortlist in writing. (10) The Town shall provide the shortlist entities with the Phase II RFP. The Town must allow sufficient time for the shortlist entities to prepare their Phase II submittals considering the scope and detail requested by the Town. The date that proposals are due must be at least twenty one (21) calendar days after the date of the issuance of the RFP. (11) The Town shall develop the RFP with the assistance of a Design Professional. (12) The Town shall include in the RFP the evaluating factors to be used in the technical and cost submission components of Phase II. The RFP shall establish, for both the technical and cost submission components of Phase II, the relative importance assigned to each evaluation factor, including any weighting of criteria to be employed by the Town. The Town shall maintain a record of the evaluation scoring to be disclosed in event of a protest regarding the solicitation. (A) The following criteria shall be included in every Phase II technical evaluation of design-build entities: (i) Compliance with objectives of the project; (ii) Compliance of proposed services to the RFP requirements; (iii) Quality of products or materials proposed; (iv) Quality of design parameters; (v) Design concepts; (vi) Innovation in meeting the scope and performance criteria; and (vii) Constructability of the proposed project. The Town may include any additional relevant technical evaluation factors it deems necessary for proper selection. (B) The Town shall include the following criteria in every Phase II cost evaluation: (i) The total project cost; (ii) The construction costs; and (iii) The time of completion. The total project cost criteria weighing factor shall be 15%. (13) Qualifications and proposals must be properly identified and sealed. Qualifications and proposals may not be reviewed until after the deadline for submission has passed as set forth in the RFQ or RFP, as applicable. All design-build entities submitting qualifications shall be disclosed after the deadline for submission, and all design-build entities that are selected for Phase II evaluation shall also be disclosed at the time of that determination. Proposals shall include a bid bond in the form and security as designated in the RFP. Proposals shall also contain a separate sealed envelope with the cost information within the overall proposal submission. (14) Qualifications and proposals must meet all material requirements of the RFQ or RFP, as applicable, or they may be rejected as non-responsive. The Town shall have the right to reject any and all qualifications and proposals in whole or in part and to waive any non-material defects. The drawings and specifications of the proposal shall remain the property of the design-build entity. Qualifications and proposals may be withdrawn prior to evaluation for any cause. After evaluation begins by the Town, clear and convincing evidence of error is required for withdrawal. (15) Upon completion of the evaluation of proposals, the Town may award the design-build contract to the highest overall ranked entity. Notice of award shall be made in writing. Unsuccessful entities shall also be notified in writing. The Town may not request a best and final offer after the receipt of proposals. The Town may negotiate with the selected design-build entity after award but prior to contract execution for the purpose of securing better terms than originally proposed, provided that the salient features of the RFP are not diminished. (16) No change orders will be permitted unless they are requested by the Town.

(Ord. No. 64-13, § 3.01, 8-13-2013)

Ask a question about Cicero law

Corpus searches the Cicero sections it holds and shows the ones that match, with their citations. Free, no sign-in.