§ 82-62 — Cement walks required; specifications

Code of Ordinances of the Town of Cicero, Illinois (Codified through Ordinance No. 71-25, adopted September 23, 2025. (Supp. No. 122)) · Cicero Municipal Code § 82-62

Corpus is an independent public-information project, not the official City of Cicero website. Stable reference: corpuslaw.us/code/f3596f5d-d0b2-4f18-928b-fce7887d144b

Sec. 82-62. - Cement walks required; specifications.

All sidewalks which may be ordered by the board of trustees within the territory of the town or which shall be constructed by owners in front of or alongside of their properties within the public streets shall be of Portland concrete and shall be constructed in all respects according to the following specifications: (1) A Portland cement concrete sidewalk shall be five inches in depth and shall be composed of concrete formed by intimately mixing one part of Portland cement, two parts of torpedo sand and four parts of crushed stone, of the size specified in this section, with sufficient clean water to produce concrete that is workable and plastic. The consistency shall be measured as described in the Tentative Method of Test for Consistency of Portland Cement Concrete, ASTM designation D 138. The slump shall not be less than one inch, nor more than two inches. After mixing, the concrete shall be immediately spread upon the earth subgrade and tamped and troweled to an even surface. Transverse expansion joints one-half inch in width and five inches in depth shall be provided in the sidewalk every 50 feet and one-inch expansion joints shall be provided between the sidewalk and the back of the curb; the joints shall be filled with Carey asphalt joint material or material of equal quality. a. Sand: 1. Passing ⅜-inch sieve, 100 percent. 2. Passing #4 sieve, 95—100 percent. 3. Passing #8 sieve, 70—90 percent. 4. Passing #16 sieve, 45—75 percent. 5. Passing #50 sieve, 5—20 percent. 6. Passing #100 sieve, 0—5 percent. b. Crushed stone: 1. Passing 1½-inch sieve, 100 percent. 2. Passing 1-inch sieve, 60—90 percent. 3. Passing ¾-inch sieve, 40—75 percent. 4. Passing ½-inch sieve, 10—30 percent. 5. Passing #4 sieve, 0—5 percent. (2) Portland cement shall conform to the requirements of the Standard Specifications for Portland Cement ASTM designation C-9-30. High-early-strength Portland cement shall conform to Tentative Specifications for High-Early-Strength Portland Cement, ASTM designation C74-30T, and with all amendments thereto. (3) The sidewalk shall be laid on an earth subgrade prepared by excavating and grading to the required depth which, after being thoroughly tamped with concrete tampers (ten-inch by ten-inch base) of not less than 15 pounds weight, shall be smooth, even and firm and five inches below and parallel with the finished sidewalk surface. (4) The finished surface of the sidewalk shall be laid to a straight line having a rising slope from the top of the curb of one inch vertical to four feet horizontal. (5) The concrete shall be mixed only in the quantity required for immediate use. Concrete that has been mixed longer than 30 minutes or that has developed initial set shall not be used. Retempering concrete by adding water or by other means shall not be permitted. No materials containing frost or lumps of hardened material shall be used. (6) The aggregates and the cement shall be thoroughly mixed in an approved batch mixer for a period of not less than one minute, during which the drum shall make not less than 16 or more than 20 revolutions per minute. The water shall be introduced in a uniform manner during the first 15 seconds of the mixing period. The mixing time may be extended if necessary to obtain thorough mixing and uniform consistency. (7) The entire contents of the drum shall be discharged before any materials are placed therein for the succeeding batch. The volume of material mixed per batch shall not exceed the manufacturer's rated capacity of the drum in cubic feet of mixed concrete. The batches shall be so designed that they will not require fractional bags of cement.

(Ord. of 5-15-1939, § 2; Code 1958, § 32-41)

Ask a question about Cicero law

Corpus searches the Cicero sections it holds and shows the ones that match, with their citations. Free, no sign-in.