§ 98-266 — Adjustments; Amounts; Penalty for Late Payment
Code of Ordinances of the Town of Cicero, Illinois (Codified through Ordinance No. 71-25, adopted September 23, 2025. (Supp. No. 122)) · Cicero Municipal Code § 98-266
Corpus is an independent public-information project, not the official City of Cicero website. Stable reference: corpuslaw.us/code/a4ee76da-d6a0-4722-8a87-f7d421aadf99
Sec. 98-266. - Adjustments; Amounts; Penalty for Late Payment.
(a) Definitions. The following words, terms and phrases, when used in this article shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Credit means a conditional reduction in the amount of stormwater utility fee charged to an individual parcel of property based upon either its certified status as a surface consisting of gravel ballast or loose gravel or its certified compliance with the Metropolitan Water Reclamation District's WMO's stormwater detention and management standards. Developed land means property that has been altered from its natural state by the addition of impervious area or surface. Equivalent runoff unit (ERU) is a unit of measure of impervious surface (in square feet which can be whole or fractional) that represents the impervious surface area on a typical single family residential parcel. One thousand eight hundred ninety-seven square feet shall equal one equivalent runoff unit (ERU). Impervious area or impervious surface means those areas or surfaces that do not readily allow for the penetration of rain into the ground at or above the infiltration rate of naturally vegetated areas or significantly impedes the infiltration of stormwater into the soil. Common impervious surfaces or areas often include, but are not limited to, buildings, rooftops, sidewalks, walkways, driveways, parking lots, railway lines, pavers, patio areas, storage areas, compacted aggregate, and awnings. Parcel means an area of land within the corporate limits of the town that has been established by a plat or other legal means to be used, developed or built upon as a unit. A parcel shall also mean any area of land within the corporate limits of the town that has been assigned a Property Index Number (PIN) by Cook County, Illinois. Residential parcel means developed land containing a dwelling structure designed for occupancy and may include houses, manufactured homes, mobile homes, condos, duplexes, multi-flats, and apartments located on one or more individual lots or parcels of land. Non-residential parcel means developed land that is not a residential parcel. Commercial or industrial parcel means developed land containing a structure or structures designed for commercial or industrial use, including, but not limited to, retail stores, restaurants, office buildings, warehouses, manufacturing facilities, distribution centers, railroad yards, and railways. Sewer and stormwater system means a conveyance or system of conveyances that includes sewers (both combined sewer systems and separate storm sewer systems), storm drains, curbs, gutters, ditches, retention ponds or basins, dams, stream impoundments, manmade channels or storm drains, pumping stations, and flood control facilities and appurtenances thereof which are designed or used for the collection, control, transportation, treatment or discharge of sewage and stormwater. User means the owner of the parcel that uses, benefits from, connects to, or is served by the town's combined sewer and stormwater system. (b) Residential use and service rates. There shall be established rates and fees for residential use and service of the town's combined sewer and stormwater system as follows: (1) Residential use and service. The bimonthly rate for residential use and service per residential dwelling unit shall be $26.59. Fees for residential sewer and stormwater use and service shall be charged bimonthly. All bills shall be payable within ten days after rendition thereof. All bills not paid within ten days of the date of billing shall have a penalty charge of ten percent added thereto. When the tenth day of any month shall be a Sunday or legal holiday, such bills for service shall be paid on the next succeeding secular day without penalty. a. Reduction for senior citizens. For residential property owners 62 years of age and older, the monthly fee shall be reduced by 35 percent. To qualify for the reduction, the senior citizen must reside at the property for which the reduction is sought and provide proof of age and ownership on a form as required by the water department. b. Reduction for persons with disabilities. For residential property owners who are disabled, the monthly fee shall be reduced by 35 percent. For purposes of this section, "disabled" shall mean, in accordance with 42 U.S.C. § 1382c, a person who is unable to engage in any substantial gainful activity by reason of any medically determinable physical or mental impairment which can be expected to result in death or which has lasted or can be expected to last for a continuous period of not less than 12 months. The physical or mental impairment must be of such severity that the person is both unable to engage in his or her previous work and unable to engage in any other kind of gainful employment. To qualify for the reduction the disabled person must reside at the property for which the reduction is sought and provide proof of his or her disability and ownership on a form as required by the water department. (c) Commercial and industrial use and service rates. There shall be established rates and fees for commercial and industrial use and service of the town's combined sewer and stormwater system as follows: (1) Sanitary sewerage fee and rate structure. The rate assessed for all water used or consumed shall be $56.06, minimum charge per month, for an allowance of 3,000 cubic feet per month. For each additional 1,000 cubic feet used or consumed per month there shall be a charge of $18.69. All bills for such use and service shall be rendered as of the first of each month following the month for which service has been rendered and shall be payable within ten days after rendition thereof. All bills not paid within 25 days of the date of billing shall have a penalty charge of 20 percent added thereto. When the 25th day of any month shall be a Sunday or a legal holiday, such bills for service shall be paid on the next succeeding secular day without penalty. (2) Stormwater utility fee and rate structure. A monthly stormwater utility fee is hereby imposed. The stormwater utility fee shall be calculated by multiplying a commercial or industrial parcel's total number of ERUs by the monthly ERU rate. a. Monthly ERU rate. The monthly ERU rate shall be $4.84 per ERU. b. Equivalent runoff unit ("ERU"). One thousand eight hundred ninety-seven square feet of impervious surface area shall equal one ERU. c. Impervious area database. The total amount of impervious surface area for all commercial and industrial parcels in the town shall be established by the town. The town shall maintain an impervious area database for all commercial and industrial parcels within the town which shall serve as the basis for determination of the number of ERUs associated with each commercial and industrial parcel. The database will be based upon available information, including, but not limited to, geographic information systems, analysis, aerial photographs, mapping information, site examination, and other relevant information. The database will be periodically updated based upon available information. d. All bills for such service shall be rendered as of the first of each month following the month for which service has been rendered and shall be payable within ten days after rendition thereof. All bills not paid within 25 days of the date of billing shall have a penalty charge of 20 percent added thereto. When the 25th day of any month shall be a Sunday or a legal holiday, such bill for service shall be paid on the next succeeding secular day without penalty. e. Gravel ballast or loose gravel surface credit. A credit of 25 percent of the gross stormwater utility fee will be available to owners of all commercial and industrial parcels for those sections of their property where the surface area consists of gravel ballast or loose gravel. As such, parcel owners who can provide proof that a section of their property's surface area consists of gravel ballast or loose gravel will be eligible to receive the 25 percent credit to be applied toward the gross amount of their monthly stormwater utility fee. 1. Credit applicability. This gravel ballast or loose gravel surface credit is available only with respect to the specific percentage portion of a parcel's surface area that consists of gravel ballast or loose gravel, e.g., if 50 percent of a parcel's surface area consists of gravel ballast or loose gravel, then the total amount of the available credit shall be reduced by 50 percent. 2. Proof of gravel ballast or loose gravel surface area required. Commercial and industrial parcel owners may demonstrate that a specific section of their property's surface area consists of gravel ballast or loose gravel by providing the town's water department with a certified report from a licensed professional engineer, selected by the parcel owner, verifying that said section of the parcel's surface area consists of gravel ballast or loose gravel. 3. Credit application process. To receive a gravel ballast or loose gravel surface area credit, a commercial or industrial parcel owner must submit a completed application, complete with all required supporting documentation, to the town's water department. The town shall process completed applications within 60 days of receipt. Billing adjustments for any approved credits shall be applied during the next regularly scheduled billing cycle. 4. Town's right to inspect and discretion to revoke. At the town's sole discretion, the town may request to perform an inspection of any parcel's surface area to determine whether it consists of gravel ballast or loose gravel. Upon completion of an inspection by a licensed professional engineer, the town may rescind a gravel ballast or loose gravel credit available to a parcel, as warranted. Failure to consent to a reasonable inspection of a parcel's gravel ballast or loose gravel surface area by the town shall be grounds for revocation of a gravel ballast or loose gravel surface credit. f. WMO compliance credit. A credit, up to a maximum of 50 percent of the gross stormwater utility fee, will be available to the owners of all commercial and industrial parcels that have stormwater management facilities in compliance with the Metropolitan Water Reclamation District's Watershed Management Ordinance ("WMO"). The purpose of this credit is to incentivize property owners for taking steps to mitigate the negative effects of stormwater runoff on the town's combined sewer and stormwater system. As such, parcel owners who can provide proof that their property has stormwater management facilities that are compliant with the requirements of the WMO will be eligible to receive a credit to be applied toward the gross amount of their monthly stormwater utility fee as follows: Stormwater Management—WMO Compliance | Credit Percentage Compliance with Pre-2014 MWRD Watershed Management Ordinance | 35% Compliance with 2014 MWRD Watershed Management Ordinance | 45% Compliance with 2020 and Post-2020 MWRD Watershed Management Ordinance | 50% 1. Credit applicability. This WMO compliance credit is available only with respect to the specific percentage portion of a parcel that possesses stormwater management facilities that are compliant with the WMO, e.g., if the WMO-compliant stormwater management facility is applicable to only 50 percent of the property, then the total amount of the available credit shall be reduced by 50 percent. 2. Proof of WMO compliance required. Commercial and industrial parcel owners may demonstrate compliance with the WMO only by providing the town's water department with either a watershed management permit issued by the Metropolitan Water Reclamation District or a certified report from a licensed professional engineer, selected by the parcel owner, verifying that the parcel's stormwater management facilities are compliant with the WMO's requirements. 3. Credit application process. To receive a WMO compliance credit, a commercial or industrial parcel owner must submit a completed application, complete with all required supporting documentation, to the town's water department. The town shall process completed applications within 60 days of receipt. Billing adjustments for any approved credits shall be applied during the next regularly scheduled billing cycle. 4. Town's right to inspect and discretion to revoke. Pursuant to the WMO, stormwater management facilities may require maintenance to perform as designed. As such, at the town's sole discretion, the town may request to perform an inspection of any parcel's stormwater management facility to determine whether it remains compliant with the WMO. Upon completion of an inspection by a licensed professional engineer, the town may rescind or reduce the total amount of WMO compliance credit available to a parcel, as warranted. Failure to consent to a reasonable inspection of a parcel's stormwater management facilities by the town shall be grounds for revocation of a WMO compliance credit. g. Requests for impervious area adjustments and appeals of WMO compliance credit denials. The process by which commercial and industrial parcel owners may request review of the town's determination of a parcel's total amount of impervious surface area or the denial of a WMO compliance credit is as follows: 1. Application for adjustment of impervious area determination. A parcel owner may request that the town adjust its determination of a parcel's total amount of impervious surface area and/or amount of gravel ballast or loose gravel surface area credit by submitting an application for adjustment of impervious area determination to the town's water department. The criteria to be considered in said application shall, in accordance with section 98-266(c)(2)(iii), include, but not be limited to, new or additional information or documentation concerning the total surface area of the subject parcel, total amount of gravel ballast or loose gravel surface area within the subject parcel, and/or the total amount of other impervious surface area within the subject parcel. Upon review, if, in the water department superintendent's sole discretion, the new or additional information or documentation provided establishes that the town's previous determination was inaccurate or incorrect, then the town shall adjust the parcel's total amount of impervious surface area and/or amount of gravel ballast or loose gravel surface credit, as warranted. The water department superintendent's determination and resulting adjustment shall be made within 60 days of the parcel owner's submission of an application under this section. 2. Application for review of a WMO compliance credit denial. A parcel owner may request that the town reconsider its denial of a WMO compliance credit by submitting an application for review of a WMO compliance credit denial to the town's water department. The criteria to be considered in said application shall, in accordance with section 98-266(c)(2)(V)(A)-(D), include, but not be limited to, new or additional information or documentation concerning the total surface area percentage of the subject parcel possessing stormwater management facilities compliant with the WMO and/or the degree to or level at which said stormwater management facilities are compliant with the WMO (i.e., whether the subject parcel's stormwater management facilities are compliant with the pre-2014 WMO, the 2014 WMO, or the 2020/Post-2020 WMO). Upon review, if, in the water department superintendent's sole discretion, the new or additional information or documentation provided establishes that the town's previous denial of a WMO compliance credit was inaccurate or incorrect, then the town shall award a WMO compliance credit, or adjust the total amount of a WMO compliance credit previously awarded, as warranted. The water department superintendent's determination and resulting adjustment shall be made within 60 days of the parcel owner's submission of an application under this section. 3. Responsibility for initiating review process. The parcel owner is responsible for initiating any review of the town's impervious area determination or the town's denial of a WMO compliance credit. Failure to submit an application for adjustment of impervious area determination or an application for review of a WMO compliance credit denial within 60 days of receipt of a bill for a parcel's stormwater utility fee shall constitute a waiver of the right to submit such an application with respect to said bill under this section. 4. Adjustment and review decisions. The superintendent of the town's water department shall make a decision either approving or denying a parcel owner's application for adjustment of an impervious area determination or application for review of a WMO compliance credit denial within 60 days of receipt of a fully completed application for either. The water superintendent's decision shall be in writing and, if the decision is a denial, shall set forth the reasons for said denial. The decision shall be mailed to the address provided on the parcel owner's application. 5. Effective date. If an application for adjustment of an impervious surface area determination or application for review of a WMO compliance credit denial is approved by the town's water superintendent, then the stormwater utility fee shall be recalculated for that parcel and the recalculated fee shall be applied retroactive to the date of submission of the completed application. h. Exemptions from stormwater utility fee. The following parcels shall be exempt from the stormwater utility fee: 1. Parcels owned by the United States of America or any agency or entity thereof; 2. Parcels owned by the State of Illinois or any agency or entity thereof; 3. Parcels owned by any unit of county or local government, or any other political subdivision of the State of Illinois; and 4. Parcels owned by religious organizations and used primarily for religious purposes, including, but not limited to, churches, synagogues, mosques, temples, or other similar houses of worship. (d) Commercial and industrial sewer and stormwater service rates for property located outside of the town municipal border. Commercial and industrial property located outside the town municipal border shall be charged for use of the sewer system at a rate of $350.00 per month per acre of property serviced by town sewers. The town will issue a monthly bill for the calculated sewer service fee amount. All bills for such service shall be rendered as of the first of each month following the month for which sewer service has been rendered and shall be payable within ten days after rendition thereof. All bills not paid within 25 days of the date of billing shall have a penalty charge of 20 percent added thereto. When the 25th day of any month shall be a Sunday or legal holiday, such bill for service shall be paid on the next succeeding secular day without penalty. This rate structure is applicable to the uses ongoing on the date of adoption, any material renovation of the site, building or expanded uses, such as table or slot gaming, will result in the town amending the rates. (e) Adjustments. Notwithstanding the foregoing, customers may seek adjustments to their sewer bills in accordance with the provisions of section 98-269 of this Code. (f) Applicability. This rate structure is applicable to the uses ongoing on the date of adoption, any material renovation of the site, building or expanded uses, such as table or slot gaming, will result in the town amending the rates.
(Ord. of 12-27-1950, § 1; Code 1958, § 29-34; Ord. No. 2-74, 1-7-1974; Ord. No. 11-81, 6-9-1981; Ord. No. 49-89, § 1, 5-9-1989; Ord. No. 1-91, § 1, 1-7-1991; Ord. No. 52-97, § 1, 5-13-1997; Ord. No. 87-03, § 1, 5-13-2003; Ord. No. 177-03, § 1, 8-26-2003; Ord. No. 146-07, § 3.01, 12-11-2007; Ord. No. 92-09, § 3.01, 12-22-2009; Ord. No. 47-10, § 3.02, 5-11-2010; Ord. No. 8-11, § 3.02, 2-22-2011; Ord. No. 37-20, § 3.00, 6-9-2020; Ord. No. 72-20, § 3.00, 12-8-2020; Ord. No. 6-21, § 3.00, 3-9-2021; Ord. No. 1-26, § 3.00, 1-13-2026)
Ask a question about Cicero law
Corpus searches the Cicero sections it holds and shows the ones that match, with their citations. Free, no sign-in.
