§ 16.32.030 — Permits required
Code of Ordinances of the City of Elgin, Illinois (Codified through Ordinance No. G18-26, enacted May 27, 2026 (Supp. No. 8)) · Elgin Code of Ordinances § 16.32.030
Corpus is an independent public-information project, not the official City of Elgin website. Stable reference: corpuslaw.us/code/c1efeff0-2f6d-4ab7-aa69-733a94a1982a
16.32.030. - Permits required.
A. A permit is required to install or alter any heating, ventilating or air conditioning equipment in the city. Application shall be made to the community development department. Upon approval, a permit shall be issued and the fees as required in chapter 16.48 of the Elgin Municipal Code shall be paid. B. Permits for work to be performed under this code shall be issued only to warm air heating contractors, as defined in chapter 16.02 of the Elgin Municipal Code, to contractors doing work based on plans and specifications sealed by an architect or mechanical engineer, or the owner-occupant of single-family detached residence. C. Permits shall be required to install or alter any ductless furnace, which shall be in conformity with the regulations as set forth in the NFPA Pamphlet No. 54, as amended by this chapter.
(Ord. No. G15-25, § 2, 3-26-2025)
Ask a question about Elgin law
Corpus searches the Elgin sections it holds and shows the ones that match, with their citations. Free, no sign-in.
