§ 17.02.010 — Terms defined
Code of Ordinances of the City of Elgin, Illinois (Codified through Ordinance No. G18-26, enacted May 27, 2026 (Supp. No. 8)) · Elgin Code of Ordinances § 17.02.010
Corpus is an independent public-information project, not the official City of Elgin website. Stable reference: corpuslaw.us/code/50ff9f42-3f0b-4fb3-95fc-d898c209a8bf
17.02.010. - Terms defined.
Building permit means the permit required for new construction and additions pursuant to title 16. The term "building permit," as used herein, shall not be deemed to include permits required for remodeling, for rehabilitation or other improvements to an existing structure, or for rebuilding a damaged or destroyed structure; provided there are no increases in gross land area for nonresidential developments, or the number of dwelling units or bedroom counts for residential developments resulting therefrom. Building site means an area of land designed, intended or used as a location for a structure. Capital budget means the portion of the city annual budget devoted to the funding of capital improvement projects. Capital improvement means a project or piece of equipment with a useful life in excess of three (3) years. Capital improvement program (CIP) means the multi-year program identifying future capital improvements and indicating planned sources of funding for those improvements. City council means the city council of the City of Elgin. City interceptor sewer master plan means the engineering study approved and adopted by the city council establishing service standards and identifying existing and projected service areas; and identifying capital improvements and estimating capital project costs necessary to maintain standards and serve such areas with a sanitary sewer collection system. City water system distribution analysis means the engineering study approved and adopted by the council establishing service standards and identifying existing and projected service areas; and identifying capital improvements and estimating capital project costs necessary to maintain standards and serve such areas with a municipal water system. Comprehensive plan means the official plan for the development of the city adopted by the council and amended from time to time. Cost means expenditures incurred or estimated to be incurred to fund a capital improvement project. These costs may include acquisition of land, construction of improvements, equipping of facilities; and administrative, engineering, architectural, and legal expenses incurred in connection with a project. Demand unit means a unit associated with a new development that generates the need for improvements in public facilities. Designated redevelopment area means a geographically defined area that has been designated by the council as a blighted area or a conservation area. An area which has not been subject to growth and development through investment by private enterprise and would not reasonably be anticipated to be developed without public incentives. Detention area means a dry-bottom area of land which provides for the temporary storage of stormwater runoff. Developer means the owner of record of land proposed for development or representative. Development means any change to improved or unimproved real property, the use of any principal structure or land, or any other activity that requires issuance of a building permit. Development impact fee means a special and additional fee imposed at building permit issuance and calculated based upon the costs of public facilities in proportion to development creating the need for such facilities. Downstream sanitary sewer means the portion of the sanitary sewer collection system located between the wastewater treatment plant and the far edge of the subject property or a point equidistant to the far edge of the subject property boundaries extended. Gross acreage means the entire area of a parcel of real property, or a building site expressed in acres or portions hereof. Library district means the Gail Borden Public Library District. Lot of record means a lot which is separately designated as such in a plat of subdivision duly filed in the office of the recorder of deeds in the county in which said lot is located. MAI is the professional designation for and means Member, Appraisal Institute as conferred by The American Institute of Real Estate Appraisers. Planned unit development means a unified development of one (1) or more parcels of contiguous land in a single ownership or unified control including two (2) or more principal buildings or uses, and where the specific requirements of a given zoning district may be modified if an application is processed and approved under the planned unit development procedures of titles 18 and 19. Proportionate share means the cost of a public facility, or capital improvement project specifically and uniquely attributable to a new development, after the consideration of the generation of additional demand from the new development, and any appropriate credits for contribution of money, dedication of land, debt service payments, or taxes dedicated for such projects. Public facility means any or all of the following facilities to be financed in whole or in part by the requirement of a developmental impact fee: A. School district capital improvements; B. School sites; C. Park sites; D. Library district capital improvements; E. Water system capital improvements; F. Sanitary sewer collection system capital improvements. Residential development means any change to improved or unimproved real property including a principal structure, all or a portion of which is designed or intended for use as a residence. Retention area means a wet-bottom area of land which provides for the temporary storage of stormwater runoff. School district means any public school district situated wholly or partially within the providing elementary, junior high and high school education. Service standard means the existing level of service delivery associated with a public facility for which a development impact fee shall be required. Site plan means a document prepared to scale indicating accurately the dimensions and boundaries of a site; and showing the location of all proposed buildings, structures, uses, and principal site development features for a parcel of land. Specifically and uniquely attributable means an identifiable portion of the need for additional public facilities, or capital improvement projects resulting from a proposed development. Subdivision ordinance means title 18, regulating the processes and design standards applicable to the division of land within the city. Wetland means an area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances does support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Zoning district means an area of the territory of the within which certain uses of land, premises, and buildings are controlled and within which certain development standards are established by ordinance. Zoning ordinance means title 19 regulating the use of land within the city.
(Ord. No. G25-92, § 2, 1992; Ord. No. G7-91, § 2, 1991; Code 1976, § 17.02.010)
Ask a question about Elgin law
Corpus searches the Elgin sections it holds and shows the ones that match, with their citations. Free, no sign-in.
