§ 5.06.025 — Exclusion of public construction contract act
Code of Ordinances of the City of Elgin, Illinois (Codified through Ordinance No. G18-26, enacted May 27, 2026 (Supp. No. 8)) · Elgin Code of Ordinances § 5.06.025
Corpus is an independent public-information project, not the official City of Elgin website. Stable reference: corpuslaw.us/code/cfd889e7-08ab-4fe7-b5ff-4f5ebac3dbaa
5.06.025. - Exclusion of public construction contract act.
The provisions of the Public Construction Contract Act (30 ILCS 557/1 et seq.), as amended, shall not apply to any city contract. In lieu thereof, the provisions of this section shall apply to city contracts. Unless otherwise specifically provided for in a city contract no claim whatsoever will be allowed to the contractor for changes, extra work, or material not included in a contractor's original bid, or for a greater amount of money than the contract states is to be paid, based upon a claim relating to subsurface or latent physical conditions, or unknown physical conditions at the site. A contractor shall be responsible for making a careful examination of the site of proposed work, the bid documents, the specifications, general conditions, plans, special provisions and contract forms before submitting the contractors bid. The contractor is responsible for fully informing the contractor as to the quality and quantity of materials required and the character of work to be performed, including, but not limited to, any matters relating to subsurface or latent physical conditions, or unknown physical conditions at the site. The contractor shall further make an investigation of the site prior to submitting the contractors bid.
(Ord. No. G14-02, § 7, 2002; Code 1976, § 5.06.025)
Ask a question about Elgin law
Corpus searches the Elgin sections it holds and shows the ones that match, with their citations. Free, no sign-in.
