§ 4-17-2 — AMENDMENTS
City Code of the City of Evanston, Illinois (Codified through Ordinance No. 39-O-26 enacted May 11, 2026. (Supp. No. 22, Update 1)) · Evanston City Code § 4-17-2
Corpus is an independent public-information project, not the official City of Evanston website. Stable reference: corpuslaw.us/code/d5297216-4ca5-420d-8fb6-2676c5476b07
4-17-2. - AMENDMENTS.
The 2021 International Fuel Gas Code adopted hereby shall read as follows with respect to these Sections. 101.1 Title. City of Evanston 103.1 Creation of Agency. Delete and reference 2021 International Building Code Section 103.1 as amended. 103.2 Appointment. Delete and reference 2021 International Building Code Section 103.2 as amended. 103.3 Deputies. Delete and reference 2021 International Building Code Section 103.3 as amended. 104.4 Right of Entry. Delete and reference 2021 International Building Code Section 104.6 as amended. 106.5.3 Expiration. Delete and reference 2021 International Building Code Section 105.5 as amended. 106.5.4 Extensions. Delete and reference 2021 International Building Code Section 105.5 as amended. 106.5.7 Posting of permit. Delete and reference 2021 International Building Code Section 105.7 as amended. 106.5.8 Hours of Work Permitted for the Construction, Repair and Demolition of Buildings. Reference 2021 International Building Code Section 105.8. 107.1: Construction Documents: Construction documents, engineering calculations, diagrams and other data shall be submitted in digital format with each application for a permit. The Code Official shall require construction documents, computations and specifications to be prepared and designed by a registered design professional when required by state law. Where special conditions exist, the Code Official is authorized to require additional construction documents to be prepared by registered design professional. Construction documents shall be drawn to scale it shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that the work conforms to the provisions of this Code. Construction documents for buildings or than two stories in height shall indicate where penetrations will be made for installations and indicate the materials and methods for maintaining required structural safety, fire resistance rating and fire blocking. Permit drawing shall include a HVAC plan showing location of supply, return, and exhausts and shall include a heat load itemizing CFM delivered or exhausted throughout the system Exception: The Code Official shall have the authority to waive the submission of construction documents, calculations or other data if the nature of the work applied for is such that reviewing of construction documents is not necessary to determine compliance with this Code. 109.2: Schedule of permit fees. The permit fee for inspection, construction, reconstruction, alteration, and installation shall be those established from time to time by the City Council of the City of Evanston. Section 113: Means of Appeal: Delete section in its entirety. Section 114: Board of Appeals: Delete section in its entirety. 115.4: Violation Penalties: Delete and reference 4-2-4 Penalty for Violations of City Code Title 4 - Building Regulations. Section 311 Noise Limitations 311 Noise Limitations: Noise levels for equipment and appliances shall not exceed 55 dBA SPL (Decibels, A-weighted, Sound Pressure Level) as averaged over any 15 minute period, and as measured at the property line between the said adjacent structures if a property line separates the parcels. Exception: Emergency back-up generators. 503.3.4.1 Exhaust discharge: Exhaust air shall not be directed onto public sidewalks.
(Ord. No. 29-O-22, § 9(Exh. H), 4-25-2022; Ord. No. 106-O-24, § 8, 12-9-2024)
Ask a question about Evanston law
Corpus searches the Evanston sections it holds and shows the ones that match, with their citations. Free, no sign-in.
