§ 4-20-5-3 — MEANS FOR STORING RUNOFF

City Code of the City of Evanston, Illinois (Codified through Ordinance No. 39-O-26 enacted May 11, 2026. (Supp. No. 22, Update 1)) · Evanston City Code § 4-20-5-3

Corpus is an independent public-information project, not the official City of Evanston website. Stable reference: corpuslaw.us/code/4bfc8031-b298-48d8-98ea-e6160887ce68

4-20-5-3. - MEANS FOR STORING RUNOFF.

The storage of detained storm water volume must be accomplished by any of the following means: (A) Open detention basin. The basin may be of any shape. The active storage depth of the detention basin is a maximum of two feet (2'), with an additional one foot (1') freeboard. The basin must be landscaped, or have a bioengineered surface. Side slopes must be no steeper than a four to one ratio (4:1) (4 horizontal to 1 vertical), and the bottom slope must be one percent (1%) to two percent (2%) to facilitate the complete drainage of all storm water runoff into the control structure by gravity, or by the use of pumps if a retention basin is proposed. Inflow pipes to the open detention basin must carry only storm water runoff, and a backflow preventing device, such as a flap gate, must be installed within a structure and must be provided on each inflow pipe to prevent basin storm water from flooding any development structures. (B) Reinforced concrete pipe or ductile iron pipe storage, constructed to the city's current construction standards. (C) Reinforced concrete vaults, constructed in accordance with the design by an Illinois licensed structural engineer. (D) Parking lot surface storage, with the depth of storm water storage limited to six inches (6") or less. (E) Rooftop storage, with the depth of storm water limited to six inches (6") or less, based on a determination by an Illinois licensed structural engineer that the roof is structurally adequate to resist all loading, including the additional water load (considered to be live load). (F) Infiltration of the detained storm water volume, provided that the applicant submits an engineered infiltration field design by an Illinois licensed professional engineer. The design must include the calculations and supporting documents necessary to demonstrate that the proposed infiltrated detained storm water volume meets the storage requirement. (G) Other means or combination of means which the applicant may use, subject to the approval by the director prior to the issuance of all necessary construction permits.

(Ord. No. 65-O-07; Ord. No. 8-O-12, (48-O-11(exh. A, § 4-20-5-3)), 1-23-2012)