§ 7-12-16-5 — ADDITIONAL MAINTENANCE REQUIREMENTS
City Code of the City of Evanston, Illinois (Codified through Ordinance No. 39-O-26 enacted May 11, 2026. (Supp. No. 22, Update 1)) · Evanston City Code § 7-12-16-5
Corpus is an independent public-information project, not the official City of Evanston website. Stable reference: corpuslaw.us/code/74b72c19-0dd5-4eab-b1ea-4b3876d08192
7-12-16-5. - ADDITIONAL MAINTENANCE REQUIREMENTS.
(A) On request by the City Manager or his/her designee, the owner shall furnish information regarding the piping systems, system or water use within the owner's premises. The premises shall be open at all reasonable times to the City Manager or his/her designee for the verification of information submitted regarding cross connection inspection results. (B) It is the responsibility of the owner to prevent backflow into the public water system by ensuring that: 1. All cross connections are removed; or approved cross connection control devices are installed for control of backflow and back siphonage. 2. Cross connection control devices shall be installed in accordance with this Code and the manufacturer's instructions. 3. Cross connection control devices shall be inspected, tested and certified at the time of installation by a person licensed by the City as a C3 Contractor and all such inspections and testing shall be witnessed by a City Plumbing Inspector. The inspection of mechanical devices shall include physical testing. Testing and certification shall be documented on City of Evanston Cross Connection Control Device Testing and Certification Report form and submitted to the Utilities Department. 4. Cross connection control devices shall be tested and certified annually by a person licensed by the City as a C3 Contractor. Testing and certification shall be documented on City of Evanston Cross Connection Control Device Testing and Certification Report form and submitted to the Utilities Department. 5. Cross connection control devices on lawn irrigation systems must be tested/certified at the time of reinstallation prior to placing the system back into service and in accordance with the schedule established by the Utilities Department. 6. Testing and Records: a. Each device shall be tested at the time of installation and at least annually or more frequently if recommended by the manufacturer. b. Test records shall be submitted by the C3 Contractor to the Utilities Department no later than ten (10) days after the completion of testing/certification. c. Each device shall have a tag attached listing the date of most recent test, name of CCCDI, and type and date of repairs. d. Every owner shall maintain for a period of five (5) years, a maintenance log for each cross connection device which shall include: (1) Date of each test; (2) Name and CCCDI license number of person performing the test; (3) Test results; (4) Repairs required and date completed; and (5) Servicing performed and date completed. (C) Whenever cross connection control devices required by these regulations are found to be defective, they shall immediately be repaired or replaced at the expense of the owner. (D) Cross connection control devices shall not be bypassed, made inoperative, removed or otherwise made ineffective without specific authorization by the City Manager or his/her designee. (E) Cross connection control prevention devices shall not be bypassed, made inoperative, removed or otherwise made ineffective without specific authorization by the city manager. (F) Chemical Dispensing Units. Chemical dispensing units supplied with water from the city waterworks system shall be protected from cross connection by either an approved air gap or a reduced pressure principle backflow prevention zone assembly installed in the water service line preceding the unit. Exempt from this requirement are those units which have been certified as meeting ASSE standards for backflow protection by an approved testing laboratory provided they meet Illinois department of public health plumbing code, Illinois Environmental Protection agency and city installation requirements. (G) Boilers. Commercial, industrial and residential boilers (other than detached single family boilers) supplied with water from the City waterworks system shall be protected from cross connection by a reduced pressure principle backflow prevention zone assembly installed in the water service line preceding the boiler make-up serving such boiler. Detached single family homes equipped with a boiler not using chemicals, toxic or hazardous substances for operation or maintenance and having less than 250,000 BTU input shall be protected from cross connection by a dual check with atmospheric vent backflow prevention device or a reduced pressure principle backflow prevention zone assembly installed preceding the boiler make-up assembly serving such boiler. (H) Fire Suppression Systems. All fire suppression water systems supplied with water from the City waterworks system shall be protected from cross connection with a cross connection control device approved by the Utilities Department. A reduced pressure principle backflow prevention device shall be required when: 1. The fire suppression water system is located within one thousand seven hundred (1,700) feet of a non-potable water source. 2. The fire service is two (2) inches or greater in diameter and equipped with one (1) or more Fire Department connections. 3. The fire safety system contains any additives. (I) Detector Assembly Required. All reduced pressure principle backflow prevention devices installed on fire suppression systems shall be equipped with a detector assembly.
(Ord. No. 2-O-08; Ord. No. 8-O-12, (50-O-11(exh. B, § 7-12-16-5)), 1-23-2012)
Ask a question about Evanston law
Corpus searches the Evanston sections it holds and shows the ones that match, with their citations. Free, no sign-in.
