For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7-15-7 — ALLEY PAVING IMPROVEMENTS

City Code of the City of Evanston, Illinois (Codified through Ordinance No. 39-O-26 enacted May 11, 2026. (Supp. No. 22, Update 1)) · Evanston City Code § 7-15-7

Corpus is an independent public-information project, not the official City of Evanston website. Stable reference: corpuslaw.us/code/533beb15-aa03-4695-b6ab-33f5cd4c153d

7-15-7. - ALLEY PAVING IMPROVEMENTS.

(A) Alley Improvements. The owners of at least fifty-one percent (51%) of the property abutting any unimproved alley or portion thereof, may petition the City for construction of a concrete pavement alley and related storm sewer and drainage improvements for the alley thereon. Such petition shall be filed with the City Manager or his/her designee. When the Board of Local Improvements receives a petition to pave an alley within the City, the Board of Local Improvements will follow the special assessment procedure established in the Illinois Municipal Code, 65 ILCS 5/9-2-1/et seq. for the petition to pave the alley. If the alley paving improvement is confirmed by the Cook County Circuit Court in accordance with the state statue, the City will pay fifty percent (50%) of the project cost with the property owners paying the remaining fifty percent (50%). The project cost will be established by an estimate of cost issued by the City Engineer plus an additional four and one-half percent (4.5%) of the total estimated cost for engineering services and an additional four and one-half percent (4.5%) of the total estimate cost for legal services. The property owner may elect to pay his/her share of the project cost as a lump sum or annually over a ten (10) year period. (B) In locations where the soil type is conducive to green infrastructure the City may design and construct the alley with porous pavement. Any additional costs associated with the porous pavement will be paid for by the Sewer Fund allocated for green infrastructure. (C) The assessment cost attributable to each property owner is based on the unit cost method, unless a more equitable alternative method is appropriate and approved by the Board of Local Improvements and approved by a majority (at least fifty-one percent (51%)) of the property owners abutting the subject alley. Votes by the property owners shall be weighted by the value of the assessment cost attributable to their property. (D) If the owners of at least eighty percent (80%) of the properties abutting any unimproved alley or portion thereof, petition the City with the intent to pay one hundred percent (100%) of the estimated cost of the alley construction, the petition will be accepted by the Board of Local Improvements and the construction of the alley will take place in the following construction season. This project will be in addition to the Alley Improvements as stated in paragraph A and will not replace any planned City projects. The cost per unit will not include engineering or legal fees when property owners are paying one hundred percent (100%) of the construction costs.

(Ord. No. 11-O-12, § 1, 4-10-2012; Ord. No. 39-O-19, § 2, 5-17-2019; Ord. No. 68-O-25, § 2, 10-13-2025)

Ask a question about Evanston law

Corpus searches the Evanston sections it holds and shows the ones that match, with their citations. Free, no sign-in.