Sec. 31-223. - Permission of inspection division required before removing plug.

The plug affixed to the building sewer by the contractor shall remain in place until the building has been framed and the contractor is ready to install the rough plumbing and then it shall only be removed with the permission of the inspection division. Permission to remove the plug shall not be granted as long as there is standing water in the basement.

(Ord. No. 18102, § 2, 7-21-20)