§ 31-223 — Permission of inspection division required before removing plug
Code of Ordinances, City of Joliet, Illinois (Supp. No. 201: codified through Ordinance No. 18888, enacted September 1, 2026) · Joliet City Code § 31-223
Corpus is an independent public-information project, not the official City of Joliet website. Stable reference: corpuslaw.us/code/ed218ba3-63ea-4ecb-a95a-92fb35f6a394
Sec. 31-223. - Permission of inspection division required before removing plug.
The plug affixed to the building sewer by the contractor shall remain in place until the building has been framed and the contractor is ready to install the rough plumbing and then it shall only be removed with the permission of the inspection division. Permission to remove the plug shall not be granted as long as there is standing water in the basement.
(Ord. No. 18102, § 2, 7-21-20)
Ask a question about Joliet law
Corpus searches the Joliet sections it holds and shows the ones that match, with their citations. Free, no sign-in.
