§ 31-286 — Monitoring facilities
Code of Ordinances, City of Joliet, Illinois (Supp. No. 201: codified through Ordinance No. 18888, enacted September 1, 2026) · Joliet City Code § 31-286
Corpus is an independent public-information project, not the official City of Joliet website. Stable reference: corpuslaw.us/code/18b4b379-dda3-4a0f-a7cc-d2971426e43a
Sec. 31-286. - Monitoring facilities.
(a) Sampling manhole applicability. (1) All non-residential users are required to install a sampling manhole for each separate discharge in the building sewer in accordance with the plans and specifications approved by the city. a. When required by the city, a SIU or NSRU, that does not have a unique sampling chamber at end-of-pipe, shall install a monitoring manhole or sampling chamber for use as the regulation location of local limits in the building sewer in accordance with plans and specifications approved by the city. b. When required by the city, a categorical industrial user shall install a monitoring manhole or sampling chamber for use as the regulation location of the categorically regulated discharge in the building sewer in accordance with plans and specifications approved by the city. This sampling chamber may be required to be installed within the building and may be in addition to an end-of-pipe manhole. (2) The city reserves the right to apply said local limits in section 31-284(a) and (b) at an end-of process discharge location that connects to the POTW sewer system in the event that: a. A unique sampling manhole at end-of-pipe is not available; b. A more representative sample can be taken of a process batch discharge even though an end-of-pipe manhole exists; c. A more representative sample can be taken at the end-of-process location than the end-of-pipe location as a result of impacts from dilute wastestreams; d. An end-of process location is used because the IU is unable to provide adequate flow documentation to use a combined wastestream formula. (3) In the event that a suitable sampling manhole does not exist as per section 31-286 and no end-of-process discharge sampling location exists, the "sampling facility" shall be considered to be the nearest downstream manhole in the public sewer to the point at which the building sewer is connected. (b) Wastewater monitoring and/or flow measurement facility operation and maintenance. (1) Such facilities will be installed and maintained at all times at the user's expense. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that the sample results are unrepresentative of its discharge. Monitoring devices shall be calibrated at least one (1) each year by the manufacturer's authorized representative. Records of the calibration shall be provided to the city upon request. (2) The manhole or chamber located on a building sewer discharge located in dedicated easements shall be easily accessible to representatives of the city twenty-four (24) hours per day, seven (7) days per week. (3) The manhole or chamber at a discharge location within the building shall be accessible to representatives of the city during normal user operating hours. (4) Metered water supply may be used to determine wastewater flow if it is substantiated to the city that the metered water supply and wastewater quantities are approximately the same, or where an adjustment agreed to by the city is made in the metered water supply to determine wastewater flow which is documented through the use of sub-meters and/or production records. In the event that the wastewater flow cannot be substantiated at any regulated location, the user will be required to install flow monitoring. (5) The sampling chamber, flow metering device, sampling equipment and documentation of the frequency of sampling, sampling methods and analysis of samples shall be subject, at any reasonable time, to inspection by the city. (6) The director of public utilities shall grant permission for a wastewater measuring device upon the receipt and approval of the following information from the owners of the properties concerned: a. The name of the company manufacturing the meter, the name or type of meter, and size and specifications therefor; b. The names and address of the contractor who will install the meter; c. The plans and specifications for the installation of the meter. Said plans and specifications must indicate that the meter will be installed in such a manner so that all sanitary and other sewage which is discharged into the city wastewater facilities will be effectively measured; d. The date(s) and time(s) during which the installation of the meter will take place; e. A statement signed by the owner of the residence, place of business or other premises if an individual, or if a partnership by all partners, or if a corporation by the president and secretary of the corporation agreeing to the following: 1. That the city will be allowed on the premises to inspect and approve the location of the meter, the installation of the meter and attach a seal thereto. 2. That the city will be allowed on the premises to read the meter so that charges may be assessed and in order to assure the proper working of the meter. 3. That the owner will install and maintain the meter entirely at his own expense and upon the owner's failure to maintain the meter or to keep it in proper repair as required by the city, that the city will have the right to base charges for the use of the city's wastewater facilities upon the volume of water consumed or the class average user volume.
(Ord. No. 18102, § 2, 7-21-20)
Ask a question about Joliet law
Corpus searches the Joliet sections it holds and shows the ones that match, with their citations. Free, no sign-in.
