For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 31-330 — Right of entry: Inspection and sampling

Code of Ordinances, City of Joliet, Illinois (Supp. No. 201: codified through Ordinance No. 18888, enacted September 1, 2026) · Joliet City Code § 31-330

Corpus is an independent public-information project, not the official City of Joliet website. Stable reference: corpuslaw.us/code/66d76507-75aa-4468-91b2-ef6c0417022d

Sec. 31-330. - Right of entry: Inspection and sampling.

The director of public utilities and his/her designee(s), duly authorized agents of the city, the Illinois Environmental Protection Agency, and the United States Environmental Protection Agency, hereafter referred to as above named entities, shall have the right to enter the premises of any user to determine whether the user is complying with all requirements of this article and any individual or general wastewater discharge permit or order issued hereunder. Users shall allow the above named entities ready access to all parts of the premises for the purposes of inspection, observation, measurement, sampling, analyses, records examination and copying, and the performance of any additional duties. (a) Where a user has security measures in force which require proper identification and clearance before entry into its premises, the user shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, the above named entities will be permitted to enter without delay for the purposes of performing specific responsibilities. Such arrangements shall be made by users with their security guards within thirty (30) days of the enactment of this provision. (b) The city shall have the right to set up on the user's property or require installation of such devices as are necessary to conduct sampling and/or metering of the user's operations. (c) The director of public utilities may require the user to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the user at its own expense. All devices used to measure wastewater flow and quality shall be calibrated twice yearly (at six-month intervals) to ensure their accuracy. The user shall submit these calibration reports semi-annually to the city with the periodic compliance reports required in section 31-322. (d) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the user at the written or verbal request of the director of public utilities and shall not be replaced. The costs of clearing such access shall be borne by the user. (e) Unreasonable delays in allowing the director of public utilities and his/her designee(s) access to the user's premises shall be a violation of this article. (f) While performing the necessary work on private properties referred to in the preceding section, the director of public utilities or duly authorized employees of the city shall observe all safety rules applicable to the premises established by the company and the company shall be held harmless for injury or death to the city employees and the city shall indemnify the company against loss or damage to its property by city employees and against liability claims and demands for personal injury or property damage asserted against the company and growing out of the gauging and sampling operation, except as such may be caused by negligence or failure of the company to maintain safe conditions as required in other sections of this article. (g) The director of public utilities and other duly authorized employees of the city bearing proper credentials and identification shall be permitted to enter all private properties through which the city holds a duly negotiated easement for the purposes of, but not limited to, inspection, observation, measurement, sampling, repair and maintenance of any portion of the sewerage works lying within said easement. All entry and subsequent work, if any, on said easement, shall be done in full accordance with the terms of the duly negotiated easement pertaining to the private property involved.

(Ord. No. 18102, § 2, 7-21-20)

Ask a question about Joliet law

Corpus searches the Joliet sections it holds and shows the ones that match, with their citations. Free, no sign-in.