For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7-5 — Costs for installation of storm sewer systems

Code of Ordinances, City of Joliet, Illinois (Supp. No. 201: codified through Ordinance No. 18888, enacted September 1, 2026) · Joliet City Code § 7-5

Corpus is an independent public-information project, not the official City of Joliet website. Stable reference: corpuslaw.us/code/ce7687d5-ced5-486b-a4e6-46623b9b7650

Sec. 7-5. - Costs for installation of storm sewer systems.

For storm sewer systems, the City of Joliet will pay all costs for the installation of the major trunk lines. All other costs will be divided among all the property owners, in the entire drainage area, on a proportionate area (per square foot) basis. Lateral manholes, catchbasins, inlets and catch basin and inlet connections to trunk lines will not be considered part of the trunk line and will, therefore, be paid for by the property owners.

(Ord. No. 6443, § 5, 4-6-76)

Ask a question about Joliet law

Corpus searches the Joliet sections it holds and shows the ones that match, with their citations. Free, no sign-in.