§ 8-2A-5 — WATER SYSTEM DESIGN CRITERIA:
Municipal Code of Naperville, Illinois (Supp. No. 101: codified through Ordinance No. 26-049, adopted May 19, 2026) · Naperville Municipal Code § 8-2A-5
Corpus is an independent public-information project, not the official City of Naperville website. Stable reference: corpuslaw.us/code/8f62c580-fb89-46db-9574-b93f09e85451
8-2A-5: - WATER SYSTEM DESIGN CRITERIA:
1. Design Approval: The Department of Public Utilities shall approve all designs and shall alter the following design requirements as necessary to meet the City water system plan. The City's Department of Public Utilities and the Transportation, Engineering and Development business group shall review and comment on all designs. 2. Valve Operation: The operation of utility valves shall be limited to Public Utility Department personnel. Advance notice of at least forty-eight (48) hours shall be required for any operation. 3. Demolition Of Existing Buildings: On property where a building is demolished, no preexisting service lines may be reused as water service lines for a newly constructed building without the prior written authorization of the Director of Public Utilities. 3.1. Service lines with a corporation connection shall be physically disconnected at the water main at sole expense of the property owner. The corporation connection must be shut off and capped in accordance with Naperville standards. Service lines larger than three (3) inches shall be completely disconnected and plugged at the water main. This disconnection must conform to Naperville standards. An authorized City inspector shall inspect disconnection procedures prior to backfilling. 4. Service Lines And Water Main Responsibility: The Department of Public Utilities shall be responsible for the repairs and maintenance of all service lines and water mains located in public rights-of-way and dedicated easements. All structures and appurtenances including the curb stop/box on a service line shall be the responsibility of the Department of Public Utilities. 4.1. The property owner shall be responsible for all necessary maintenance and repairs of service lines and water mains located on private property. 4.2. All valves and hydrants located on private property shall also be the responsibility of the property owner unless situated in a dedicated utility easement. 5. Water Meters: 5.1. Individual Meters: Every building except auxiliary buildings shall be individually metered. 5.2. Multiple Tenants With One Meter: Where multiple occupants (tenants) are provided water through one meter, water may not be resold to any of the tenants. 5.3. Meters Accessible: 5.3.1. Where tenants are individually metered for water supplies, each service shall be accessible from the outside of the building and provided with shutoff valves accessible from the outside of the building. 5.3.2. The Department of Public Utilities shall be allowed to enter any building where meters have been installed at any reasonable times, upon notice to the owner or occupant. Access shall be for the purposes of routine inspection, maintenance, testing and repairs. 5.4. Water Lines For Fire Protection Equipment: All water lines serving fire protection equipment, including automatic sprinkler systems and standpipe systems, shall be completely metered. 5.5. Domestic Service Lines: Domestic water service lines tapped off a fire line water main shall be separately metered. 5.6. Valve Arrangement: All valves shall be arranged so that each line can be shut off from the exterior of the building. 6. Private Water Mains: Approved private water mains may be connected to the City system. Private elevated or ground storage facilities may be considered. All private connections shall be specifically approved by the Director of the Department of Public Utilities. 7. Booster Pump Installations: Booster pumps in buildings for domestic special or fire service shall meet the requirements of this Subsection 8-2A-5.7 as well as Subsection 8-2A-2.19 of this Article. 7.1. No pump shall be installed without specific approval of the Director of the Department of Public Utilities. 7.2. Pump installations shall not be considered where alternate means of solving the problem are available. 7.3. Where fire pumps are installed, an approved instrument connected to the Fire Department headquarters shall be provided indicating a fire pump operation. 7.4. Pumps shall not require an excessive amount of water over that which is available. A normal residual pressure of approximately twenty-five (25) psi shall be maintained in the public water main at the point of connection to the private system. Additional pressure shall be required for topographic conditions. Pump ratings shall be based upon overload capacities of pumps, if any. 7.5. Procedures for pump testing shall be submitted to the Department of Public Utilities for approval. Pump testing shall only be conducted with the permission of the Department of Public Utilities. This includes both the initial test and annual or periodic service tests as required in Section 8-2A-2 of this Article. 7.6. A pressure limiting switch shall be utilized in case of fluctuating water pressure and volume to ensure that no severe taxation of the local system will occur. Special considerations will be necessary to operate municipal pumping equipment prior to the booster pump operating (particularly in direct pumping service areas). Setting of these devices shall be approved by the Director of the Department of Public Utilities. 8. Protection Against Corrosive Soils: All ductile iron pipe installed as part of the water system shall be polyethylene encasement unless approved by the Director of the Department of Public Utilities. The encasement shall be installed in accord with Naperville standard specifications Section 514.
(Ord. 02-137, 6-4-2002) (Ord. 92-234, 12-15-1992) (Ord. No. 92-234, 12-15-1992; amd. Ord. No. 02-137, 6-4-2002)
Ask a question about Naperville law
Corpus searches the Naperville sections it holds and shows the ones that match, with their citations. Free, no sign-in.