For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-13-11 — APPLICATION REQUIREMENTS:

Municipal Code of Naperville, Illinois (Supp. No. 101: codified through Ordinance No. 26-049, adopted May 19, 2026) · Naperville Municipal Code § 6-13-11

Corpus is an independent public-information project, not the official City of Naperville website. Stable reference: corpuslaw.us/code/3bb6f7eb-acff-4f24-8b81-55aef387945c

6-13-11: - APPLICATION REQUIREMENTS:

In addition to any information required for applications pursuant to Title 6, Zoning Regulations, applicants for communications facilities may be required to submit all, or a portion of, the following information at the discretion of the Zoning Administrator: 1. The name, address and telephone number and email address of the owner and lessee of the parcel of land as well as for the owner and operator of communications facilities which are the subject of the application. If the applicant is not the owner of the parcel of land, the written consent of the owner shall be evidenced in the application. 2. A scaled site plan clearly indicating the location, type and height of the proposed facilities and other information deemed by the Zoning Administrator to be necessary to assess compliance with this Article, including but not limited to: a) On-site and adjacent land uses (including when located in other municipalities) and all properties within the applicable separation distances set forth in Section 6-13-10:6, "Separation". b) Adjacent roadways, proposed means of access, setbacks from property lines, elevation plan drawn to scale in blueprint form and other supporting blueprints of the proposed facilities and any other structures, topography, and parking. c) Legal description of the parent tract and leased parcel (if applicable). d) The setback distance between the proposed tower/antenna from each lot line. e) A landscape plan showing specific landscape materials. f) Method of fencing, finished color and, if applicable, the method of Camouflage or concealment and illumination. g) An inventory of the applicant's existing communications facilities, towers and antennas, or sites which have been approved for communications facilities, towers and antennas, or for which applications or petitions for approval have already been filed, that are either within the jurisdiction of the City or within one (1) mile of the border thereof, including specific information about the location, height and design of each communications facilities, tower and antenna. The Zoning Administrator may share such information with other applicants applying for administrative approvals or special use permits under this Article or other organizations seeking to locate communications facilities within the jurisdiction of the City, provided, however that the Zoning Administrator is not, by sharing such information, in any way representing or warranting that such sites are available or suitable. 3. Owners and/or operators of communications facilities shall certify that all franchises required by law for the construction and/or operation of communications services with the City have been obtained and shall file a copy of all required franchise agreements with the Zoning Administrator. 4. Affidavit For Collocation: For a new tower or pole with antenna(s), a notarized statement by the applicant as to whether the communications facilities will accommodate collocation of additional antennas for future users. If so, the applicant shall submit an affidavit stating that space on the proposed new tower or pole will be made available to future users for co-location. 5. An affidavit from the applicant addressing the following: a) A description of compliance with Subsections 6-13-10:2 and all applicable Federal, State or local laws. b) Current radio frequency coverage prediction in the area served both prior to and after construction of the proposed communications facilities and technical performance goals for the desired signal strength. c) Drive test results which confirm or refute the areas shown on coverage maps used in planning the system used by the communications provider. d) The suitability or unsuitability of the use of existing towers, other structures or alternative technology not requiring the use of towers or structures to provide the services to be provided through the use of the proposed new communications facilities, including information regarding the number of calls dropped and failed hand-offs between existing call sights within two (2) miles of the City. e) A description of the feasible location(s) of future towers, poles or antennas within the City based upon existing physical, engineering, technological or geographical limitations in the event the proposed tower is erected. f) A written statement from an engineer(s) that the construction and placement of communications facilities, tower or antenna will not interfere with public safety communications and the usual and customary transmission or reception of radio, television or other communications services enjoyed by adjacent residential and nonresidential properties. 6. An affidavit by the owner of the parent tract (if the location is leased) agreeing to the terms relating to removal of the facilities, as described in Sections 6-13-12 and 6-13-13. 7. Identification of the entities providing the backhaul network and capacities for communications facilities described in the application and other cellular sites owned or operated by the applicant in the City, updated on at least an annual basis, and the method of providing backhaul, wired or wireless. 8. A notarized statement by a licensed structural engineer attesting to the structural integrity of the communications facilities and for their proposed use. 9. Color photo simulations showing the proposed site of communications facilities with a photo-realistic representation of the proposed facilities as it would appear viewed from the closest residential property, public right-of-way or other adjacent land use. 10. Any other information deemed necessary by the Zoning Administrator to determine the necessity and appropriateness of the proposed facilities.

(Ord. No. 18-031, § 1, 4-3-2018)

Ask a question about Naperville law

Corpus searches the Naperville sections it holds and shows the ones that match, with their citations. Free, no sign-in.