§ 6-16-9 — PERMIT PROCESS:
Municipal Code of Naperville, Illinois (Supp. No. 101: codified through Ordinance No. 26-049, adopted May 19, 2026) · Naperville Municipal Code § 6-16-9
Corpus is an independent public-information project, not the official City of Naperville website. Stable reference: corpuslaw.us/code/a535a37a-97cf-454e-8295-e59af3325de8
6-16-9: - PERMIT PROCESS:
Unless exempted from the requirements of this Chapter, no person shall erect or display any sign unless issued a permit. 1. Application: Any person or activity proposing to erect, display, or replace a sign shall file an application on a form provided by the City of Naperville. Signs listed in Sections 6-16-4:1 and 6-16-5:1 of this Chapter are exempt from a sign permit. The following supporting documents are required for review of a permit: 1.1. Scaled drawing of proposed sign (scale must be indicated on drawing). 1.2. Location drawing, clearly drawn indicating roadways, parking lots and buildings, including dimensions of setback (ground signs). If questions arise related to utilities, setbacks, or other technical details, Zoning Administrator may require a plat of survey be provided. 1.3. Detailed, scaled drawing of building elevation where sign will be placed (wall signs). 1.4. Completed electrical contractor's certification (for signs requiring electricity). 2. Granting Of Permit: After review, a permit for the sign shall be granted if: 2.1. It complies with this Chapter. 2.2. It has been authorized by a variance granted by the City of Naperville, if required. 2.3. All applicable permit fees have been paid as required. 3. Conformance With The National Electrical Code: All signs in which electrical wiring and connections are required shall conform to the applicable provisions of the National Electrical Code. 4. Wind Pressure And Dead Load Requirements: Signs shall be designed and constructed to withstand a wind pressure of not less than thirty (30) pounds per square foot of net surface area and to receive dead loads as required in the building code. 5. Payment Of Fees: All fees shall be paid in full before any permit for a sign is issued. 6. Completion Of Authorized Work: If the work authorized under the permit has not been completed within six (6) months after the date of issuance, the permit shall become null and void.
(Ord. No. 17-006, § 3, 1-17-2017; Ord. No. 22-121, § 2, 11-15-2022)
Ask a question about Naperville law
Corpus searches the Naperville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
