For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-9-4 — OFF STREET LOADING:

Municipal Code of Naperville, Illinois (Supp. No. 101: codified through Ordinance No. 26-049, adopted May 19, 2026) · Naperville Municipal Code § 6-9-4

Corpus is an independent public-information project, not the official City of Naperville website. Stable reference: corpuslaw.us/code/c6354e41-5945-4613-afb5-4cc5c0c8f6d4

6-9-4: - OFF STREET LOADING:

1. Location Of Off Street Loading Facilities: All of street loading facilities required to serve a building, structure, or use of land erected or established after the effective date of this Title, or any amendment hereto, or subsequently altered or enlarged shall be located on the same lot as the building, structure, or use of land served or central loading facilities may be established in accordance with the provisions of Subsection 6-9-4.2 of this Section. 2. Central Loading Facilities: Central loading facilities may be substituted for off street loading facilities on individual lots, provided the following conditions are fulfilled: 2.1. Each lot served shall have direct access to the central loading area without crossing streets or alleys. 2.2. The total number of off street loading berths provided shall meet the minimum requirements herein specified, based on the sum of the several types of uses served. Area of types of uses may be totaled before computing number of loading berths. 2.3. No lot served shall be more than five hundred (500) feet removed from the central loading area. 3. Control Of Central Loading Facilities: When the required off street loading facilities are collectively provided and used in central loading facilities, written covenants and easements assuring their retention, maintenance, and use for such purposes shall be executed by the parties concerned. Such covenants and easements shall be reviewed by the Zoning Administrator, approved as to content and form by the corporation counsel, and filed for record in the office of the county recorder. 4. Yard Requirements For Off Street Loading Facilities: 4.1. Off street loading facilities which are located in a building or structure shall comply with the yard requirements of the zoning district in which located. 4.2. Unenclosed off street loading facilities shall comply with the following yard requirements: 4.2.1. Loading facilities shall not be located in any required front yard or corner side yard. 4.2.2. Loading facilities shall be permitted in the interior side yard or rear yard except as provided in Subsections 6-8A-7.4 and 6-8B-7.2 of this Title and Subsection 6-9-4.4.2.3 of this Section. 4.2.3. Loading facilities where permitted shall not be located within five (5) feet of any property line. 4.3. Along all major arterials, as established by the officially adopted Naperville thoroughfare plan [8], there shall be an off street loading facility setback of seventy (70) feet from the centerline of the right-of-way of the major arterial or twenty (20) feet from the edge of the right-of-way, whichever is greater. 5. Access To Off Street Loading Facilities: All off street loading facilities shall be designed with appropriate means of vehicular access to a street or an improved alley. 6. Computation Of Number Of Required Off Street Loading Spaces: If in determining the number of off street loading berths required by this Title, the computation results in a requirement of a fractional berth, any fraction of less than one-half (½) may be disregarded, while a fraction of one-half (½) or more, shall be counted as one loading berth. 7. Accessory Buildings Or Structures: If an off street loading facility has an attendant shelter building or structure, said building or structure shall conform to all yard requirements for the zoning district in which located. 8. Utilization Of Off Street Loading Facilities: Space allocated to any off street loading facility shall not, while so allocated, be used to satisfy the requirement for any off street parking facilities or portion thereof. 9. Minimum Loading Facilities: Uses of buildings, structures, or parcels of land which require off street loading facilities, but which have less area than the minimum prescribed for such required facilities, shall be provided with adequate receiving facilities, accessible by motor vehicle off any adjacent alley or service drive on the same lot. 10. Determination Of Off Street Loading Requirements: Off street loading berths shall be established in accordance with the specific loading class provided in Section 6-9-5 of this Chapter. The Zoning Administrator shall determine the loading class of a use which, though not contained by name in a loading class, is deemed to be similar in nature and clearly compatible with the listed uses. Loading berths for accessory uses not specifically enumerated within a loading class shall be assumed to be included in the principal use requirement.

(Ord. 80-5, 1-21-1980)

Ask a question about Naperville law

Corpus searches the Naperville sections it holds and shows the ones that match, with their citations. Free, no sign-in.