§ 7-3-2 — PUBLIC UTILITIES:
Municipal Code of Naperville, Illinois (Supp. No. 101: codified through Ordinance No. 26-049, adopted May 19, 2026) · Naperville Municipal Code § 7-3-2
Corpus is an independent public-information project, not the official City of Naperville website. Stable reference: corpuslaw.us/code/535ed79f-d3fc-42f1-852b-5a3fa83a1032
7-3-2: - PUBLIC UTILITIES:
1. Sanitary Sewer: Sanitary sewer mains shall be constructed to Naperville standards and procedures throughout the entire subdivision in such manner as to serve adequately all lots and tracts with connection to a public sanitary sewage system. Private septic systems are allowed if public sewer service is not readily available and all the requirements of the County Health Officer and the Illinois Environmental Protection Agency or other appropriate governmental agencies are met; provided, however, that the private septic system is located on a lot with a minimum area of one and one-half (1½) acres. All areas within the Municipal limits or areas upon annexation shall be required to connect onto a public system when it becomes readily available unless within a zoning district specifically allowing private septic systems. If a developer wishes to develop any lots at a size smaller than the minimum one and one-half (1½) acres, the burden is on the developer to show to staff and the Planning Commission, pursuant to the requirements of this Section, that soil tests indicate that the soils of each proposed lot are suitable for the septic system to be installed. The developer who wishes to develop lots at a size smaller than one and one-half (1½) acres must comply with the following procedures and requirements at the preliminary and final plat review stages designated as follows: 1.1. Preliminary Plat Stage: The preliminary plat shall be prepared in accordance with the following: 1.1.1. Soil mapping based upon on-site determination of soil characteristics shall be conducted to determine soil suitability for septic systems. Soil survey and mapping shall be by a soil classifier. (A soil classifier is defined as a certified member of the Illinois Soil Classifiers Association and/or a certified professional soil classifier member of ARCPACS, who by reason of their special knowledge of the physical, chemical and biological sciences applicable to soils; and of the methods and principles of soil classification as acquired by soils education and soil classification experience in the formation, morphology, description and mapping of soils is qualified to practice soil classifying.) To determine soil suitability for septic systems, the following procedure shall be utilized. (Ord. No. 22-044, § 2, 5-3-2022) 1.1.1.1. There shall be a sufficient number of soil borings throughout the proposed acreage for platting so as to allow intensive mapping of soil characteristics and limiting factors related to suitability for septic systems. The mapping and overlay of such characteristics should be of sufficient detail to minimize the potential for inclusions and to determine the existence of at least one-half (½) acre of one continuous area of suitable soils on each proposed lot. There shall be at least one boring on each acre of the proposed subdivision. The location of all borings shall be shown on the soil map overlay. A 200-foot grid system will be established and one boring at each grid point shall be performed. In addition, sufficient additional borings shall be completed to adequately identify each soil mapping unit. 1.1.1.2. The City of Naperville Department of Public Works shall be notified at least twenty-four (24) hours before commencement of on-site boring so that the Department may observe the boring and sampling procedures, if it so desires. Any boring conducted without the Department being notified may not be accepted. 1.1.1.3. A map, report and logs of each soil series mapped on the site shall be prepared and included in the soil classifier's report. Logs should be available on request. 1.1.1.4. The date(s) of all field work shall be indicated. 1.1.1.5. The entire subdivision area shall be mapped showing all types present with boundaries of each defined considering areas of transition. The mapping shall be coordinated with site topography. 1.1.1.6. The map shall also depict areas of seasonal high groundwater as determined by the soil classifier's observation of the drainage characteristics of the soil; long-term monitoring of observation wells approved by the Department of Public Works may be used to supplement this information. Boundaries of the following areas shall be defined: Seasonal high ground water or other limiting layer at less than 18". Seasonal high ground water or other limiting layer at 18" to 30". Seasonal high ground water or other limiting layer at 30" to 42". Seasonal high ground water or other limiting layer at 42" to 60". Seasonal high ground water or other limiting layer greater than 60". 1.1.2. A detailed map showing the soils present and locations of borings (per Section 7-3-2-1.1). 1.1.3. Only soil types depicted on the site soil map and classified as suitable soils for septic systems may irrefutably be included in the one-half (½) acre of one continuous area suitable for septic systems required for each lot. 1.1.3.1. Soils not considered suitable for septic systems shall not be included in the one-half (½) acre of required soils, and in addition, shall be indicated as being restricted for septic systems on the plat. 1.1.3.2. If earth fill is intended to be placed as an adjunct to an engineering plan proposed per Subsection 1.1.3.1. above, all areas of filling and/or cutting must be clearly delineated. It should be known that this may influence septic suitability. 1.1.4. A uniform location of wells and septic systems shall be shown on the lots to eliminate conflicts between wells and septic systems. 1.1.5. Septic system restriction lines shall be shown on the preliminary plat in conjunction with all drainage easements, detention and retention easements, in accordance with the following: 1.1.5.1. Drainage easements must have a 25-foot septic restriction line shown on the tentative plat, such line being at least twenty-five (25) feet from the edge of the drainage easement. If the drainage easement is for pipe or conduit, the restriction line shall be fifteen (15) feet beyond the easement. The portrayal shall clearly indicate which side of the line is restricted. 1.1.5.2. Pond-type retention facilities must have a septic restriction line shown on the tentative plat at least fifty (50) feet from the maximum perimeter of the pond, at high water level (100-year event). 1.1.5.3. Dry retention basins must have a septic restriction line at least twenty-five (25) feet from the easement protecting the structure or detention area. 1.1.6. The developer must prove to the satisfaction of the City Engineer that each lot on the preliminary plat has generally one-half (½) acre of one continuous area of suitable soil. 1.1.7. The signature of the soil classifier by whom the soil mapping was done and the report prepared, must be affixed to both the report and the preliminary plat. 1.2. Final Plat Stage: When a subdivision is to be served by septic systems, all septic system requirements of the preliminary plat stage must continue to be met at the final plat stage. The following requirements must also be met during the preparation of the final plat and engineering drawings: 1.2.1. All areas restricted for septic systems must be designated on the final plat. 1.2.2. Where site-specific engineering has been approved, the engineering plans must include details of such engineering. 2. Water Supply: Water mains shall be constructed to Naperville standards and procedures throughout the entire subdivision in such manner as to serve adequately all lots and tracts with connection to such public system, together with shut-off valves and fire hydrants. Private well systems are allowed if public water service cannot be made available and all applicable local, County, and State codes are met. All areas within the Municipal limits and all areas upon annexation shall be required to connect onto a public system when available unless within a zoning district specifically allowing private wells. 3. Electric Service: Electric service will be provided in accordance with Title 8, Chapter 1 of this Code for all areas within the City. 4. Drainage Easements: Designated drainage shall be placed in drainage easements. A minimum 5-foot easement will be provided for any drainage facility which collects or channelizes individual lot drainage. A minimum ten-foot easement will be provided for any drainage facility which collects or transports storm water drainage from over two (2) individual lots. A drainage easement shall be granted for all areas designated as retention or detention in the drainage plans of the subdivision. An easement of a minimum of five (5) feet by five (5) feet offset from any drainage facility and outside any easement required for drainage shall be provided for electrical transformers and telephone junction centers. All required easements shall be shown on the engineering plans required by this Chapter. Easements required by this Subsection may also be used for the installation of utility facilities which do not interfere with the use of the easements for drainage purposes. 5. Telephone Boxes And Electrical Transformers: Electrical transformers and telephone junction boxes shall not be placed in any portion of a designated drainage or storm water control facility. 6. Storm Drainage Systems: An adequate storm drainage system shall be designed in accordance with the Storm Drainage Ordinance of the City. There shall be submitted for approval by the City Engineer, at the time of final plat approval, a lot grading and foundation elevation plan. It shall show at each lot corner the proposed U.S.G.S. elevation for that point. Arrows drawn along all lot lines shall show the direction of drainage flow. The top of the foundation shall be shown by a U.S.G.S. elevation. That elevation shall be noted inside the symbol for the structure location on the lot. Where there is more than one foundation level for the structure, the elevation for the lowest foundation level shall be shown. The foundation elevation shall be such that the lot drainage be designed to run away from the top of the foundation. In the event that conditions dictate that some parts of the lot be higher than the structure foundation, the grading plan will show specific drainage configurations for the lot specifying that all drainage is directed away from the foundation. 7. Engineering And Inspection: Improvements for sanitary sewer, water main, storm sewer, road, concrete curb and gutter, electric street lighting lines, electrical distribution system, drainage, and appurtenances thereto, shall be submitted to the City Engineer for approval before final disposition has been made of the subdivision plat. Any reports required by the applicable soil and water conservation service shall also be submitted.
(Ord. No. 89-139, 8-7-89) (Ord. No. 89-139, 8-7-89; amd. Ord. No. 92-137, 7-21-92) (Ord. No. 89-139, 8-7-89) (Ord. No. 89-139, 8-7-89; amd. Ord. No. 92-137, 7-21-92) (Ord. 89-139, 8-7-89) (Ord. 76-34, 4-20-76; amd. 1984 Code) (Ord. 76-34, 4-20-1976) (Ord. 85-238, 12-16-1985; reaffirmed Ord. 89-55, 3-20-1989)
Ask a question about Naperville law
Corpus searches the Naperville sections it holds and shows the ones that match, with their citations. Free, no sign-in.