8-2B-4: - BUILDING SEWERS:

1. Classes Of Permits; Application; Fees: There shall be two (2) classes of building sewer permits: 1) for residential and commercial service, and 2) for service to establishments producing industrial wastes. In either case, the owner or their agent shall make application on a form furnished by the City. The permit application shall be supplemented by any plans, specifications, or other information considered pertinent in the judgment of the Director of the Department of Public Utilities. Connection and inspection fees as established by this Code shall be paid to the City at the time the application is filed. All nonresidential applicants shall, as a condition of permit authorization, provide information describing its wastewater constituents, characteristics and type of activity. 2. Condition For Issuance: A building sewer permit will only be issued and a sewer connection shall only be allowed if it can be demonstrated that the downstream sewerage facilities, including sewers, pump stations and wastewater treatment facilities, have sufficient reserve capacity to adequately and efficiently handle the additional anticipated waste load. 3. Costs Borne By Owner: All costs and expense incident to the installation and connection of the building sewer shall be borne by the owner. The owner shall indemnify the City from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer. 4. Separate Sewer For Each Building: A separate and independent building sewer shall be provided for every building. 5. Old Building Sewers: Old building sewers may be used in connection with new buildings only when they are found, on examination and test by the City, to meet all requirements of this Article. 6. Construction Specifications: The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench, shall all conform to the requirements of the building and plumbing codes [5] or other applicable rules and regulations of the City. In the absence of code provisions or in application thereof, the materials and procedures set forth in appropriate specifications of the American society of testing materials, "Water Pollution Control Federation Manual Of Practice No. 9", "Standard Specifications For Water And Sewer Main Construction In Illinois", 1973 edition, and the "Naperville Design Manual For Public Improvements", as amended from time to time, shall apply, three (3) copies of each being on file in the office of the City Clerk, and which are hereby adopted by reference. 7. Elevation: Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such building drain shall be lifted by a means which is approved in accordance with this Article, and discharged to the building sewer. 8. Roof Downspouts Prohibited: No person shall make connection of roof downspouts, exterior foundation drains, areaway drains, or other sources of surface runoff or ground water to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer. 9. Connection To Public Sewer: The connection of the building sewer into the public sewer shall conform to the requirements of the building and plumbing codes, other applicable rules and regulations of the City, and the procedures set forth in appropriate specifications of the American society of testing materials, "Water Pollution Control Federation Manual Of Practice No. 9", and "Standard Specifications For Water And Sewer Main Construction In Illinois". All such connections shall be made gastight and watertight. Any deviation from the prescribed procedures and materials must be approved by the City before installation. 10. Inspection: The applicant for the building sewer permit shall notify the City when the building sewer is ready for inspection and connection to the public sewer. The connection shall be made under the supervision of the City or its representative. 11. Excavations: All excavations for building sewer installation shall be adequately guarded with barricades and lights as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the City. 12. Responsibility For Maintenance And Repair: The lot owner shall be responsible for all normal maintenance and repair of the building sewer. This responsibility includes that portion of the sanitary service line between the lot line and the City's sanitary sewer main. 12.1. The Department of Public Utilities (DPU) will share fifty percent (50%) of the cost with the property owner for an additional right-of-way (ROW) rodding after the lot owner has paid for one ROW rodding in the same 12-month period. 12.2. The DPU will pay one hundred percent (100%) of the cost for additional right-of-way (ROW) roddings after two (2) ROW roddings in the same 12-month period. 12.3. To qualify for City cost sharing, all roddings must be performed by a licensed plumber and evidenced by written documentation and invoices in accordance with DPU policy. 12.4. The DPU will be responsible for the total cost of repairs to the sanitary service line in the ROW where a certified plumber is not able to break through a blockage, if there are structural problems with the sanitary service line, or where the service line requires rodding more than two (2) times in two (2) or more consecutive years.

(Ord. No. 79-127, 10-15-1979; amd. Ord. No. 92-137, 7-21-1992; Ord. No. 92-234, 12-15-1992; Ord. No. 02-137, 6-4-2002; Ord. No. 22-044, § 2, 5-3-2022)