Sec. 26-94. - Permit requirements and review procedure.
An applicant is required to obtain one or more permits to collocate small wireless facilities. A permit application is received and processed, and permits are issued subject to the following requirements: (1) Application requirements; specific documentation. A wireless provider shall be required to provide the following information when seeking a permit to collocate small wireless facilities on a utility pole or wireless support structure: ..... a. Specifications and drawings prepared by a structural engineer, as that term is defined in section 4 of the Structural Engineering Practice Act of 1989, for each proposed small wireless facility covered by the application as it is proposed to be installed; ..... b. Site specific structural integrity analysis and, for an authority utility pole, make-ready analysis prepared by a structural engineer, as that term is defined in section 4 of the Structural Engineering Practice Act of 1989; ..... c. The location where each proposed small wireless facility or utility pole would be installed and photographs of the location and its immediate surroundings depicting the utility poles or structures on which each proposed small wireless facility would be mounted or location where utility poles or structures would be installed; ..... d. The equipment type and model numbers for the antennas and all other wireless equipment associated with the small wireless facility; ..... e. A proposed schedule for the installation and completion of each small wireless facility covered by the application, if approved; ..... f. Certification that the collocation complies with this section to the best of the applicant's knowledge. ..... g. For village utility poles that support aerial facilities used to provide communications services or electric service, wireless providers shall comply with the process for make-ready work under 47 USC 224 and its implementing regulations. ..... h. Applications for multiple small wireless facilities. ..... 1. An applicant seeking to collocate small wireless facilities within the jurisdiction of a single authority shall be allowed, at the applicant's discretion, to file a consolidated application and receive a single permit for the collocation of up to 25 small wireless facilities if the collocations each involve substantially the same type of small wireless facility and substantially the same type of structure. ..... 2. If an application includes multiple small wireless facilities, the village may remove small wireless facility collocations from the application and treat separately small wireless facility collocations for which incomplete information has been provided or that do not qualify for consolidated treatment or that are denied. The village may issue separate permits for each collocation that is approved in a consolidated application. ..... 3. Alternate placements in lieu of new utility pole. ..... (i) With respect to an application for the collocation of a small wireless facility associated with a new utility pole, the village may propose that the small wireless facility be collocated on an existing utility pole or existing wireless support structure within 100 feet of the proposed collocation, which the applicant shall accept if it has the right to use the alternate structure on reasonable terms and conditions, and the alternate location and structure does not impose technical limits or additional material costs as determined by the applicant. ..... (ii) The applicant shall provide a written certification describing the property rights, technical limits or material cost reasons the alternate location does not satisfy the criteria in this section. ..... (2) Permit review procedure. ..... a. Method of submitting all permit documentation. All applicants seeking permits are required to submit their documentation through the online tools provided on the official village website. The online submission process shall be the sole method for accepting permit documentation, and paper submissions will not be accepted unless explicitly specified by the relevant village department. ..... b. Village review period to determine completeness of application. Within 30 days after receiving an application, the village must determine whether the application is complete and notify the applicant. If an application is incomplete, the village must specifically identify the missing information. An application shall be deemed complete if the village fails to provide notification to the applicant within 30 days after when all documents, information, and fees specifically enumerated in the village's permit application are submitted by the applicant to the village. ..... c. Village review period for permit application. The village shall process applications as follows: ..... 1. Collocation on existing structure. ..... (i) An application to collocate a small wireless facility on an existing utility pole or wireless support structure shall be processed on a nondiscriminatory basis. ..... (ii) An application shall be deemed approved if the village fails to approve or deny the application within 90 days but only if notice pursuant to subsection (2)(c)1(iii) of this section is timely provided to the village. ..... (iii) If an applicant intends to proceed with the permitted activity on a deemed approved basis, the applicant must notify the village in writing (deemed approved notice) of its intention to invoke the deemed approved remedy no sooner than 75 days after the submission of a completed application. ..... (iv) If the deemed approved notice was timely given, then the permit shall be deemed approved on the latter of the 90th day after submission of the complete application or the tenth day after the receipt of the deemed approved notice by the village. ..... (v) The receipt of the deemed approved notice shall not preclude the village's denial of the permit request within the time limits as provided under this article. ..... 2. Collocation on new structure. ..... (i) An application to collocate a small wireless facility that includes the installation of a new utility pole shall be processed on a nondiscriminatory basis. ..... (ii) An application shall be deemed approved if the village fails to approve or deny the application within 120 days, but only if notice pursuant to subsection (2)(c)2(iii) of this section is timely provided to the village. ..... (iii) If an applicant intends to proceed with the permitted activity on a deemed approved basis, the applicant must notify the village in writing (deemed approved notice) of its intention to invoke the deemed approved remedy no sooner than 105 days after the submission of a completed application. ..... (iv) If the deemed approved notice was timely given, then the permit shall be deemed approved on the latter of the 120th day after submission of the complete application or the tenth day after the receipt of the deemed approved notice by the village. ..... (v) The receipt of the deemed approved notice shall not preclude the village's denial of the permit request within the time limits as provided under this article. ..... d. Village review period for permit correction resubmittals. ..... 1. The applicant may cure the deficiencies identified by the village and resubmit the revised application once within 30 days after notice of denial is sent to the applicant without paying an additional application fee. ..... 2. The village shall approve or deny the revised application within 30 days after the applicant resubmits the application or it is deemed approved. ..... 3. However, if an applicant intends to proceed with the permitted activity on a deemed approved basis, the applicant must notify the village in writing deemed approved notice of its intention to invoke the deemed approved remedy simultaneously with the applicant's resubmittal. ..... 4. If the deemed approved notice is timely given, then the application shall be deemed approved on the 31st day after resubmission. ..... 5. Any subsequent village reviews shall be limited to the deficiencies cited in the denial. ..... 6. However, the revised application deemed approved cure does not apply if the cure requires the review of a new location, a new or different structure to be collocated upon, new antennas, or other new wireless equipment associated with the small wireless facility. ..... 7. The receipt of the deemed approved notice shall not preclude the village's denial of the permit request within the time limits as provided under this article. ..... e. Tolling of review time period. ..... 1. All processing deadlines are tolled from the time the village sends the notice of incompleteness to the time the applicant provides the missing information. ..... 2. The time period for applications may be further tolled by: ..... (i) The express agreement in writing by both the applicant and the village; or ..... (ii) A local, state or federal disaster declaration or similar emergency that causes the delay. ..... f. Document basis for denial. The village must document the basis for a denial, including the specific code provisions or application conditions on which the denial was based, and send the documentation to the applicant on or before the day the village denies an application. ..... (3) Application fees. Application fees are subject to the following requirements: ..... a. The village shall charge an application fee as provided in the village fee schedule for an application to collocate a single small wireless facility on an existing utility pole or wireless support structure and for each small wireless facility addressed in an application to collocate more than one small wireless facility on existing utility poles or wireless support structures. ..... b. The village shall charge an application fee as provided in the village fee schedule for each small wireless facility addressed in an application that includes the installation of a new utility pole for such collocation. ..... c. Notwithstanding any contrary provision of state law or local ordinance, applications filed pursuant to this chapter must be accompanied by the required application fee. ..... d. The village shall not require an application, approval, or permit, or require any fees or other charges, from a communications service provider authorized to occupy the rights-of-way, for: ..... 1. Routine maintenance; ..... 2. The replacement of wireless facilities with wireless facilities that are substantially similar, the same size, or smaller if the wireless provider notifies the village at least ten days prior to the planned replacement and includes equipment specifications for the replacement of equipment consistent with the requirements of subsection (1)d of this section; or ..... 3. The installation, placement, maintenance, operation, or replacement of micro wireless facilities that are suspended on cables that are strung between existing utility poles in compliance with applicable safety codes. ..... 4. However, the village may require a permit to work within rights-of-way for activities that affect traffic patterns or require lane closures. ..... (4) Collocation limitations. ..... a. The wireless provider shall not collocate small wireless facilities on village utility poles that are part of an electric distribution or transmission system within the communication worker safety zone of the pole or the electric supply zone of the pole. ..... b. However, the antenna and support equipment of the small wireless facility may be located in the communications space on the village utility pole and on the top of the pole, if not otherwise unavailable, if the wireless provider complies with applicable codes for work involving the top of the pole. For purposes of this section, the terms "communications space," "communication worker safety zone," and "electric supply zone" have the meanings given to those terms in the National Electric Safety Code as published by the Institute of Electrical and Electronics Engineers. ..... c. The village may reserve space on authority utility poles for future public safety uses or for the village's electric utility uses, but a reservation of space may not preclude the collocation of a small wireless facility unless the village reasonably determines that the authority utility pole cannot accommodate both uses. .....
(Code 1976, § 20-94)
Ask a question about Palatine law
Corpus searches the Palatine sections it holds and shows the ones that match, with their citations. Free, no sign-in.